My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Supplemental Materials
>
OnTrack
>
CU
>
2018
>
CU 18-1
>
Supplemental Materials
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2018 9:40:29 AM
Creation date
7/6/2018 10:55:36 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CU
File Year
18
File Sequence Number
1
Application Name
U of O North Campus
Document Type
Supplemental Materials
Document_Date
6/22/2018
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIVERSITY OF OREGON <br />NORTH CAMPUS <br />CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION <br />Item 2: Details will be provided on individual projects regarding the location, number, <br />and dimensions of proposed bicycle parking spaces and reviewed by the city <br />through the standard development process as they become available. <br />Item 3: Details will be provided on individual projects regarding traffic circulation will be <br />reviewed by the city through the standard development process as they become <br />available. <br />Item 4: Details will be provided on individual projects regarding proposed landscaping <br />and screening for parking areas and reviewed by the city through the standard <br />development process as they become available. <br />Item 5: Details will be provided on individual projects regarding curbs and other means <br />of protecting landscaping and reviewed by the city through the standard <br />development process as they become available. <br />Item 6: Details will be provided on individual projects regarding parking area lighting and <br />reviewed by the city through the standard development process as they become <br />available. <br />Item 7: Details will be provided on individual projects regarding parking area lighting and <br />reviewed by the city through the standard development process as they become <br />available. <br />.13 Street and Utility Improvement Requirements <br />Item 1: Details will be provided regarding proposed existing and proposed public and <br />private improvements and reviewed by the city through the standard <br />development process as they become available. <br />Item 2: Details will be provided regarding whether public improvements are proposed to <br />be constructed privately or publicly and reviewed by the city through the <br />standard development process as they become available. <br />Item 3: Details will be provided regarding the location, size, and species of existing <br />street trees and reviewed by the city through the standard development process <br />as they become available. <br />Item 4: Details will be provided regarding the location of existing and proposed <br />streetlights and reviewed by the city through the standard development process <br />as they become available. <br />Item 5: Utility plans will be provided on individual projects and reviewed by the city <br />through the standard development process as they become available. <br />.14 Street and Public Access Way Requirements <br />Item 1: Exhibit D Trip Generation Estimate Report contains the estimated number of peak <br />hour trips based on the proposal. <br />Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 45 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.