My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Supplemental Materials
>
OnTrack
>
CU
>
2018
>
CU 18-1
>
Supplemental Materials
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2018 9:40:29 AM
Creation date
7/6/2018 10:55:36 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CU
File Year
18
File Sequence Number
1
Application Name
U of O North Campus
Document Type
Supplemental Materials
Document_Date
6/22/2018
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIVERSITY OF OREGON <br />NORTH CAMPUS <br />CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION <br />.7 Storm Drainage Requirements <br />Item 1: Sheet C01 Storm Drainage Plan (Exhibit A) shows the location of the existing <br />piped public system at the proposed connection point(s). Details will be <br />provided on individual projects regarding and flow line elevation and reviewed by <br />the city through the standard development process as they become available. <br />Item 2: Details will be provided on individual projects regarding drainage-ways and <br />reviewed by the city through the standard development process as they become <br />available. Sheet L01 Regulatory Plan (Exhibit A) shows the top of bank lines for the <br />Willamette River and Millrace. <br />Item 3: Floodplain and floodway boundaries, as well as base flood elevations across the <br />site, are shown on Sheet S01 Existing Conditions (Exhibit A). <br />Item 4: Stormwater Drainage Analysis Reports will be provided on individual projects <br />and reviewed by the city through the standard development process as they <br />become available. <br />Item 5: Within the Plan Set (Exhibit A), Sheet C01 Storm Drainage Plan shows existing <br />and possible future extension of storm drainage. Proposed grading and <br />landscape plans will be provided on individual projects and reviewed by the city <br />through the standard development process as they become available. <br />Item 6: Stormwater analysis will be provided on individual projects and reviewed by the <br />city through the standard development process as they become available. <br />Item 7: The stormwater system, or portions thereof, are proposed for private <br />maintenance. The Operations and Maintenance (O & M) Plan will confirm such <br />management of existing and proposed facilities on the subject site. <br />.8 Tree Preservation Requirements <br />Item 1: Details will be provided on individual projects regarding potential tree-removal <br />and reviewed by the city through the standard development process as they <br />become available. <br />Item 2: Details will be provided on individual projects regarding potential location, size, <br />and species of existing trees and reviewed by the city through the standard <br />development process as they become available. <br />Item 3: Details will be provided on individual projects regarding critical root zones of <br />trees and reviewed by the city through the standard development process as <br />they become available. <br />.9 Natural Features Assessment and Delineation of Applicable Boundaries on <br />Site Plan (in accordance with EC 9.8440(2)(a) <br />Item 1: Details will be provided regarding on-site vegetation and reviewed by the city <br />through the standard development process as they become available. <br />Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 43 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.