UNIVERSITY OF OREGON <br />NORTH CAMPUS <br />CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION <br /> <br />Item 5: Details will be provided on individual projects regarding amount and percent <br />increase in total building square footage and reviewed by the city through the <br />standard development process as they become available. <br />Item 6: Details will be provided on individual projects regarding elevation drawings that <br />depict the scale and appearance of the proposed buildings and reviewed by the city <br />through the standard development process as they become available. <br />Item 7: Details will be provided on individual projects regarding the total area of impervious <br />surface that is existing and proposed and reviewed by the city through the standard <br />development process as they become available. <br />Item 8: The Commercial Zone Development Standards at EC 9.2170 through 9.2175do not <br />apply to this request. <br />Item 9: Details will be provided on individual projects regarding the width and location of all <br />existing and proposed public and private easements and reviewed by the city <br />through the standard development process as they become available. <br />Item 10: Details will be provided on individual projects regarding all proposed grading for <br />streets, building areas, and other proposed development and reviewed by the city <br />through the standard development process as they become available. <br />Item 11: Details will be provided on individual projects regarding existing and proposed <br /> occupancy classification, construction type, and gross building size for each <br /> structure and reviewed by the city through the standard development process as <br /> they become available. <br />.5 Wastewater Requirements <br />Item 1: Details will be provided on individual projects regarding location and flow line <br />elevation of the existing public wastewater sewer system and reviewed by the <br />city through the standard development process as they become available. <br />Proposed possible connection point(s) are shown on Sheet C02 Sanitary Sewer <br />Plan (Exhibit A). <br />Item 2: Sheet C02 Sanitary Sewer Plan (Exhibit A) shows the existing and potential <br />wastewater sewer layout, including service to the site. <br />.6 Water Supply Requirements <br />Item 1: Existing and proposed water mains and their diameters are shown on Sheet C03 <br />Water Supply Plan (Exhibit A). <br />Item 2: Details will be provided on individual projects regarding existing and proposed fire <br />hydrants and reviewed by the city through the standard development process as <br />they become available. <br /> <br />Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 42 <br /> <br />