My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Supplemental Materials
>
OnTrack
>
CU
>
2018
>
CU 18-1
>
Supplemental Materials
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2018 9:40:29 AM
Creation date
7/6/2018 10:55:36 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CU
File Year
18
File Sequence Number
1
Application Name
U of O North Campus
Document Type
Supplemental Materials
Document_Date
6/22/2018
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UO North Campus June 15, 2018 <br />Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report <br /> <br /> <br /> <br />New public and private fire hydrants will be required with redevelopment throughout the site. New <br />hydrant locations will conform to the Oregon Fire Code. <br /> <br />Based on past pressure/flow test data in the area, the static pressure within the public system is <br />expected to range between 68-72 psi, depending on the time of day. Both the Riverfront Parkway <br />th <br />and East 8 Avenue systems are expected to produce adequate fire flows. However, flow test <br />information should be obtained to confirm available pressures and flows. Looped systems may be <br />preferred to improve flows and circulation. <br /> <br /> <br /> <br /> <br /> |9 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.