The Applicant stipulates to meeting all vision clearance requirements of the EC, including <br />EC 9.6780. See civil sheets within Exhibit G for vision clearance triangles. <br />The Applicant stipulates to meeting all stormwater flood control and quality standards of EC <br />9.6791 through 9.6797. See Exhibit G for stormwater control plan. <br />33 | Page <br /> <br />LOMBARD APARTMENTS LLC –WRITTEN STATEMENT – REVISED <br />MAY 11, 2018 <br /> <br />