My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Materials (under evaluation)
>
OnTrack
>
WG
>
2018
>
WG 18-3
>
Materials (under evaluation)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2018 3:11:45 PM
Creation date
5/21/2018 3:06:06 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
WG
File Year
18
File Sequence Number
3
Application Name
Lombard Apartments
Document Type
Application Materials (under evaluation)
Document_Date
5/11/2018
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
facilities in accordance with EC 9.6725. Lighting in the parking areas is shown on Sheet A1 <br />on 16’ poles. See architectural site plan A1 in Exhibit G for specific locations. <br />The Applicant has worked closely with City staff to develop the proposed street and internal <br />circulation plan as submitted under the Application. The existing Lombard Street will be <br />extended from the south half of the site through to the north boundary of the site and <br />improved to City public street standards. The internal vehicular circulation is provided with <br />private driveways and parking aisles that serve to meet the intent of EC 9.6815 and provide <br />efficient connectivity for emergency service vehicles in readily apparent paths without creating <br />excessive travel lengths. <br /> <br />For response to the criteria of EC 9.6735(1)& (2) see Exhibit F-2, Technical Memo, dated <br />May 9, 2018, prepared by Sandow Engineering. <br />Per EC 9.6735(3) the Applicant requests an adjustment to the standard at (2) for the following: <br />1)Adjustment to EC 7.420(1)(c) to allow for inclusion of a driveway connection at <br />River Road (in addition to driveway’s that will access Lombard Street.); and <br />2)Adjustment to EC 7.420(2)(b) driveway spacing standards to allow for the proposed <br />access at River Road. <br /> <br />The adjustments proposed are in accordance with EC 9.8030(28). See full response to <br />adjustment criterion in response to above referenced adjustment requests included in Exhibit <br />F-2,Technical Memo, dated May 9, 2018, prepared by Sandow Engineering. <br />31 | Page <br /> <br />LOMBARD APARTMENTS LLC –WRITTEN STATEMENT – REVISED <br />MAY 11, 2018 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.