intersected by a drive aisle will be marked with striping or where indicated on the site plan <br />with a cross-hatch a contracting paving material. Lighting will be provided along pedestrian <br />facilities in accordance with EC 9.6725. Lighting in the parking areas is shown on Sheet A1 <br />on 16’ poles. See architectural site plan A1 in Exhibit G for specific locations. <br />Recycling and garage enclosure location(s) have been identified on the site plan and plans and <br />elevations provided on sheet A-1 in Exhibit G to demonstrate compliance with this <br />subsection. The proposed enclosure will be a 6-foot tall CMU wall (solid screening) on three <br />sides with the access side provided with a solid screen gate for at least 50% of the length. <br />EC 9.8445(3): <br />Compliance with Subsection (a) <br />23 | Page <br /> <br />LOMBARD APARTMENTS LLC –WRITTEN STATEMENT – REVISED <br />MAY 11, 2018 <br /> <br />