My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Materials (under evaluation)
>
OnTrack
>
WG
>
2018
>
WG 18-3
>
Materials (under evaluation)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2018 3:11:45 PM
Creation date
5/21/2018 3:06:06 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
WG
File Year
18
File Sequence Number
3
Application Name
Lombard Apartments
Document Type
Application Materials (under evaluation)
Document_Date
5/11/2018
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Applicant requests an adjustment to provision EC 9.5500(12)(b)1. where more than 3 <br />consecutive parking courts exist. Enhanced landscape buffers and pedestrian crosswalks will <br />minimize the negative aspects of parking uses in accordance with the adjustment in EC <br />9.8030(8)(f). <br />The proposal complies with parking requirements of provision EC 9.5500(12)(c) along River <br />Road and Lombard Street. See sheet A-1 in Exhibit G for parking configuration. Out of an <br />abundance of caution, the applicant will be applying for an Adjustment to the restriction of <br />parking between a building and a street to cover the section of parking/drive isle between <br />Lombard Street and Building 1. <br />The Applicant requests an adjustments to EC 9.5500(12)(b)1. and EC 9.5500(12)(c) in <br />accordance with EC 9.8030(8)(f). See full response to adjustment criteria in Part IV <br />Adjustment Review below. <br /> <br /> <br />On-site pedestrian circulation paths have been designed to provide a safe path of travel from <br />every unit to all other units within the development, from every unit to all community facilities <br />and from every building located within 40-feet of a public or private street to the street right- <br />of-way line. Pathways have also been provided from all public ways to building entrances. All <br />pathways will be constructed of concrete or comparable hard surface material and when <br />abutting a street or driveway will be raised to standard curb height. All paths that are <br />22 | Page <br /> <br />LOMBARD APARTMENTS LLC –WRITTEN STATEMENT – REVISED <br />MAY 11, 2018 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.