9. The final PUD plans shall note that street tree removals must meet the permit and <br />replacement value requirements of EC 6.305. <br />10. A geotechnical analysis from a certified engineer, with specific recommendations for <br />design and construction standards, shall be provided with any applications for Privately <br />Engineered Public Improvement (PEPI) permits, as well as building permits and site <br />development permits for the initial construction of infrastructure and residences on <br />individual lots. The development proposed with each permit shall adhere to the <br />recommended standards for design and construction as contained in the related <br />geotechnical analysis. <br />11. The final PUD plans shall include the following note: <br />Lots 16 and 17 shall have the option of constructing up to three attached single-family <br />structures. If only one single-family structure is proposed, that lot shall have a maximum <br />lot coverage of 50% of the buildable portion of the lot. If two or three single-family <br />structures are proposed, that lot shall have a maximum lot coverage of 65% of the <br />buildable portion of the lot. The buildable portion of the lot shall be the area identified as <br />outside any preservation area and shall not exceed 13,500 square feet, regardless of how <br />many dwellings are developed on the lot. <br />12. The final PUD plans shall show a buildable area on Lots 5, 16 and 22 not to exceed <br />13,500 square feet. <br />13. Prior to final plat approval, the applicant shall provide documentation that EWEB has <br />received a financial guarantee, in the form cash payment, bond, or an irrevocable letter of <br />credit, ensuring water will be provided to each lot in the plat. <br />14. The final PUD plans shall revise the site plan Sheet C1 - Wastewater and Water Plan to <br />include 14-foot public utility or public wastewater easements, centered on the public <br />wastewater mainlines, for all wastewater mainlines proposed on private property. In the <br />event that a public mainline is proposed for location within 7 feet from the edge of a <br />public right-of-way, a public utility or wastewater easement shall be dedicated on the <br />adjacent private property at the width necessary to ensure 14 feet of operational and <br />maintenance access to the wastewater mainline (7 feet on each side), when combined <br />with the public right-of-way within that 14 feet. <br />15. The final PUD plans shall revise the site plan Sheet C1 - Wastewater and Water Plan to <br />include wastewater services for Lots 18 - 19 that do not include private service lines <br />within the public right-of-way. Private service lines may be relocated on private property, <br />or public gravity service lines may be placed in the right of way. <br />16. The final PUD plans shall revise the site plans to include 5-foot sidewalks along the east <br />side of Capital Drive. <br />Hearings Official Decision (PDT 17-1) <br />