My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Appeal Materials
>
OnTrack
>
PDT
>
2017
>
PDT 17-1
>
Appeal Materials
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2018 4:01:03 PM
Creation date
5/9/2018 8:58:19 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
17
File Sequence Number
1
Application Name
Capital Hill PUD
Document Type
Appeal Materials
Document_Date
5/7/2018
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
attached single-family structures. If only one single-family structure is proposed <br />on either'of those lots, that lot shall have a maximum lot coverage of 50% of the <br />buildable portion of the lot. If two or three single-family structures are proposed, <br />that lot shall have a maximum lot coverage of 65% of the buildable portion of the <br />lot. The buildable portion of the lot shall be the area identified as outside any <br />preservation area and shall not exceed 13,500 square feet, regardless of how many <br />dwellings are developed on the lots. <br />b. Page 63, 'Condition 12: The final site plan shall be revised to show a buildable <br />area on Lots 5, 16 and 22 not to exceed 13,500 square feet. <br />c. Page 63, Improvements-Specifications : EC 9.6506 requires all public <br />improvements to be designed and constructed in accordance with adopted plans <br />and policies, the procedures specified in EC Chapter 7, and standards and <br />specifications adopted pursuant to EC Chapter 7. Additionally, all developments <br />are required to be served by and implement infrastructure improvements including <br />water, sewage, streets, street trees, street lights, sidewalks, accessways, and <br />stormwater drainage. The applicant proposes all public improvements to be <br />privately!, engineered and constructed. To ensure compliance with EC 9.6505, an <br />Engineering and Construction agreement is required for the private construction <br />of public improvements, which must be submitted when the construction plans are <br />submitted for review and approval. The configuration and size of the public <br />improvements will be subject to approval by the City Engineer upon review of the <br />design and supporting analysis prepared by the applicant's engineer. If the <br />improvements are not permitted prior to plat approval, a bond for the construction <br />of public; improvements will be required prior to final plat approval. These <br />requirements will be further addressed through the subsequent subdivision <br />application process. <br />d. Page 64,' Water Supply, Condition 13: Prior to final plat approval, the applicant <br />shall provide documentation that EWEB has received a financial guarantee, <br />ensuringj,water will be provided to each lot in the plat. It is noted that EWEB <br />currently" accepts cash payment, bond, or an irrevocable letter of credit as <br />financiat guarantees. <br />e. Page 65,'Sewage: <br />i. Condition 14: Prior to final PUD approval, the applicant shall revise Sheet <br />C 1- Wastewater and Water Plan to include 14-foot public utility or public <br />wastewater easements, centered on the public: wastewater mainlines, for <br />all wastewater mainlines proposed on private property. In the event that a <br />public mainline is proposed for location within 7 feet from the edge of a <br />public right-of-way, a public utility or wastewater easement shall be <br />dedicated on the adjacent private property at the width necessary to. ensure <br />14 feet of operational and maintenance access to the wastewater mainline <br />(7 feet on each side), when combined with the public right-of-way within <br />that 14 feet. <br />ii. Condition 15: Prior to final PUD approval, the applicant shall revise Sheet <br />C1- Wastewater and Water Plan to include wastewater services for Lots <br />18 -19 that do not include private service lines within the public right-of- <br />38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.