Recycling and garage enclosure location(s) have been identified on the site plan and plans and <br />elevations provided on sheet A-1 in Exhibit G to demonstrate compliance with this <br />subsection. The proposed enclosure will be a 6-foot tall CMU wall (solid screening) on three <br />sides with the access side provided with a solid screen gate for at least 50% of the length. <br />EC 9.8445(3): <br />Compliance with Subsection (a) <br />19 | Page <br /> <br />LOMBARD APARTMENTS LLC –WRITTEN STATEMENT – APRIL 5, 2018 <br /> <br />