My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2nd Open Record Period: Public Testimony (3-22-18 to 3-30-18)
>
OnTrack
>
PDT
>
2017
>
PDT 17-1
>
2nd Open Record Period: Public Testimony (3-22-18 to 3-30-18)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2018 2:41:50 PM
Creation date
4/2/2018 2:40:58 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
17
File Sequence Number
1
Application Name
CAPITAL HILL PUD
Document Type
Public Comments
Document_Date
3/30/2018
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
363
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment G <br />Electric facilities extending across tax lots to serve adjacent properties require <br />easement. The applicant's representative should coordinate early in design with EWEB <br />Electric Distribution Engineering to confirm the specific locations and sizes of EWEB <br />easements or required relocation by calling 541-685-7521 or email at <br />DistributionEngineering@eweb.org. EWEB Utility Easements or PUE's required to serve <br />these properties must be noted on the plat prior to EWEB's approval of the Final <br />Subdivision. <br /> <br />Electric facilities under storm water treatment facilities or any open drainage structure <br />should be avoided. EWEB standards and extension design will require additional <br />measures if water treatment facilities are unavoidable. Additional information <br />pertaining to new electric service is available at EWEB's website at <br />http://www.eweb.org/contractors-and-developers/building-and-renovations/facility- <br />extension. EWEB owns and maintains service conduit and conductors. <br /> <br />CƚƩ ƒƚƩĻ źƓŅƚƩƒğƷźƚƓ ƩĻŭğƩķźƓŭ ƷŷĻ źƷĻƒƭ ğĬƚǝĻͲ ĭƚƓƷğĭƷ WƚƓ ŷƚƒğƭͲ 9ǒŭĻƓĻ ğƷĻƩ ε 9ƌĻĭƷƩźĭ <br />.ƚğƩķͲ ğƷ ЎЍЊΏЏБЎΏАЍАЋͳ ƆƚƓ͵ƷŷƚƒğƭθĻǞĻĬ͵ƚƩŭ͵ <br /> <br />99. ğƷĻƩ <br /> <br />The applicant is advs office about fire protection <br />requirements for building permits. <br /> <br />EWEB water does not allow installation of any w <br /> or any open drainage structure within the right-of-way. <br /> <br />Provisions within the design must be made to accommodate the installation of water <br />facilities (services & hydrants) at common lot corners. <br /> <br /> at service crossing and hydrant locations is <br />required. State Drinking Water regulations (OAR 333-061-0050(10)) require a minimum <br />separation betwe where they run parallel to each other, <br /> if the sew below the water main. <br /> <br />EWEB owned water facilities will be located in the right-of- public <br />utility easement (PUE) adjacent to the right-of-way, or in a 1 PUE when not located <br />adjacent to the right -of -way. <br /> <br />CƚƩ ƒƚƩĻ źƓŅƚƩƒğƷźƚƓ ƩĻŭğƩķźƓŭ ƷŷĻ źƷĻƒƭ ğĬƚǝĻͲ ĭƚƓƷğĭƷ .źƌƌ WƚŷƓƭƚƓͲ 9ǒŭĻƓĻ ğƷĻƩ ε 9ƌĻĭƷƩźĭ <br />.ƚğƩķͲ ğƷ ЎЍЊΏЏБЎΏАЌААͳ Ĭźƌƌ͵ƆƚŷƓƭƚƓθĻǞĻĬ͵ƚƩŭ͵ <br /> <br /> <br />99. wźŭŷƷΏƚŅΏğǤ <br />Page 391 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.