My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Additional PublicTestimony submitted 3-21-18
>
OnTrack
>
PDT
>
2017
>
PDT 17-1
>
Additional PublicTestimony submitted 3-21-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2018 4:12:59 PM
Creation date
4/2/2018 8:29:17 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
17
File Sequence Number
1
Application Name
CAPITAL HILL PUD
Document Type
Public Comments
Document_Date
3/21/2018
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
489
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment C <br />The proposed density is also similar to the existing density of surrounding existing neighborhoods. <br />This issue is discussed in greater detail at EC 9.8320(1), (2) and (10) in the staff report. <br />Street Connectivity standards are discussed in detail at EC 9.6815 in the staff report. The applicant <br />also submitted a Traffic Safety and Street Connectivity Study which estimated the proposed <br />development will not exceed the threshold of 100 or more peak hour trips; therefore, a Traffic Impact <br />Analysis is not required. Public Works staff concurs with the findings in the study, and this issue is <br />discussed in greater detail at EC 9.8320(7)(c) in the staff report. <br />The proposed preservation area that acts as a buffer to the Ribbon Trail and Hendricks Park is <br />discussed in detail at EC 9.8320(2), (3), (4), (11), and (12) in the staff report. Staff concluded that the <br />preserved area provides a visual screen of the development for those who use the Ribbon Trail for <br />recreation purposes and a significant wildlife habitat and corridor, helping to ensure a more <br />harmonious environment. <br />Attachments <br />A. Letters from Laurel Hill Valley Citizens and Fairmount Neighbors Association <br />B. Public testimony received from neighbors and other interested parties <br />7 <br />Page 72 <br />
The URL can be used to link to this page
Your browser does not support the video tag.