My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Public Comments submitted at hearings official hearing (NRC 1)
>
OnTrack
>
PDT
>
2017
>
PDT 17-1
>
Public Comments submitted at hearings official hearing (NRC 1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2018 10:39:26 AM
Creation date
3/12/2018 10:38:33 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
17
File Sequence Number
1
Application Name
CAPITAL HILL PUD
Document Type
Public Comments submitted at hearings official hearing
Document_Date
3/7/2018
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
334
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s traffic engineering division, signals, safety projects, street lighting, neighborhood <br />traffic calming, traffic control plan and related programs, project management, signing and <br />striping standards, etc. <br />Principal Transportation Engineer - City of Lake Oswego, Public Works/Engineering, Lake <br />Oswego, OR - July 2006 to Sept. 2011 <br />neighborhood traffic calming, work zone traffic control plans and related programs, project <br />management, corridor studies, school zone safety, work zone safety, development review, etc. <br />Senior Traffic/Signal Engineer - Oregon Department of Transportation Headquarters, <br />Salem, OR July 2003 to July 2006 <br />Establish statewide signal approval procedure and list on all state highways, update the <br />statewide signal policy and guidelines, manage signal operation team, oversee statewide <br />periodic signal timing updates and Flashing Yellow Left Turn Arrow Signals (FYA). <br />Implementation of multiple traffic related statewide legislative updates to Oregon Administrative <br />Rules (OAR) and Oregon Revised Statutes (ORS) as related to traffic control devices in general <br />and signals in particular. <br /> <br />Transportation Manager - Berger/ABAM Engineers Inc., Portland, OR July 2002 to July <br />2003 <br />Recruited to develop and expand the transportation section in the Portland office. The primary <br />efforts included intensive marketing and developing relationship with public agencies <br />throughout the state, team building and networking in the Oregon market. Also, support <br />transportation needs in other national and international markets (Dubai) for variety of <br />transportation related efforts. The work included project management, related report <br />preparation and QA/QC efforts. <br /> <br />Senior Traffic Engineer, Traffic Analyst - Washington County Dept. of Land use and <br />Transportation, Hillsboro, OR - 1990 to 2002 <br />Responsible for leading the Traffic Operations Section (13-19 Staff). Manage neighborhood <br />traffic calming program in urban sections of the County, early stage ITS development , project <br />management, signal timing update , subdivision and street lighting review, school zone safety <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.