From: Brent Lorscheider [mailto:lorsch2728@pacbell.net] <br />Sent: Tuesday, October 31, 2017 5:30 PM <br />To: GIOELLO Nick R <Nick.R.Gioello@ci.eugene.or:us> <br />Subject: Re: Question on stormwater plan for a Chpud <br />Nick, <br />1. Does the Planning Development Department, as the lead enforcement agency for this subject, agree with this answer? <br />2. The consultant answer refererences section 3.1.3, paragraph 2 for the civil engineers specific language, which states the bound <br />lots will discharge onto the new roadways. <br />2A. Please direct me to the portion of the stormwater analysis that accounts for the runoff/flow from these lots onto the new <br />roadway... Specifically: <br />the maps, diagrams, illustrations, assumed impervious surface areas, modelling and calculations that account for the <br />runoff? <br />2B - Does Table 2 (pg 6) included the future impervious and pervious areas of the bound lots? I ask this question <br />because the Basin Summary appears to omit some, or all, of the bound lots impervious and pervious areas. <br />Thx, Brent <br />From: GIOELLO Nick R <Nick. R.Gioello(c)ci.eugene.or.up <br />To: Brent Lorscheider <lorsch2728(cDpacbell.net> <br />Sent: Tuesday, October 31, 2017 3:42 PM <br />Subject: FW: Question on stormwater plan for a Chpud <br />Brent, <br />See the responses below that carne from the applicant's Engineering consultant. <br />Thanks, <br />Nick <br />nick. r.gioello(c)ci.eugene.or.us <br />From: Brent Lorscheider (mailto:lorsch2728(a~pacbell.net] <br />Sent: Friday, October 27, 2017 7:10 PM <br />To: GIOELLO Nick R <Nick.R.Gioello(c ci.eugene.or.us> <br />Subject: Re: Question on stormwater plan for a Chpud <br />hi Nick, <br />1 How are the implied future restrictions (meeting flow control and water quality requirements for lots 21 thru 32) <br />memorialized and enforced by the City? <br />[ces] The stormwater requirements are memorialized in the final PUD documents. It is a documents that is signed and <br />notarized by both the city and the client. The document is then recorded with Lane County. Those documents (plans and <br />recorded conditions of approval) are then use as part of the building permit review. <br />2 <br />