My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUBLIC CORRESPONDENCE - Batch C
>
OnTrack
>
PDT
>
2017
>
PDT 17-1
>
PUBLIC CORRESPONDENCE - Batch C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2018 4:02:57 PM
Creation date
3/7/2018 10:19:33 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
17
File Sequence Number
1
Application Name
CAPITAL HILL PUD
Document Type
Misc.
Document_Date
3/6/2018
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G_ _ ELL Nick <br />Brent, <br />Attached are the As-Construct information obtained through our GIS database for the roadways. After reviewing that for <br />the information you need feel free to email with additional questions. <br />From: Brent Lorscheider [mailto:lorsch2728@pacbe11.net] <br />Sent: Friday, November 03, 2017 1:31 PM <br />To: Eugene PWE PIC <CEWEPIC@ci.eugene.or.us>; GIOELLO Nick R <Nick.R.Gioello@ci.eugene.or.us> <br />Subject: Roadway width, Capital Drive and spring blvd <br />Hi, <br />I was referred to you by Nick Gioello. <br />Does the City have asbuilt drawings, survey results or any other information that would show, or could be used to calculate, any or all <br />of the actual roadway width (curb face to curb face) for the following reaches: <br />1. Spring Blvd from intersection of Spring and Fairmount to Spring and Capital. <br />2. Capital Drive from intersection of Spring and Capital to Capital and Cresta da Ruta. <br />Pls feel free to call me if it will help. <br />Thank you, <br />Brent Lorscheider <br />Ph: 6266275049 <br />Add: 2625 capital Drive <br />
The URL can be used to link to this page
Your browser does not support the video tag.