according to this criterion. This condition of approval will ensure that the recommendations in the <br />report are carried out as requirements of the development: <br />A geotechnical analysis from a certified engineer, with specific recommendations for design <br />and construction standards, shall be provided with any applications for Privately <br />Engineered Public Improvement (PEPI) permits, as well as building permits and site <br />development permits for the initial construction of infrastructure, and residences on <br />individual lots. The development proposed with each permit shall adhere to the <br />recommended standards for design and construction as contained in the related <br />geotechnical analysis. <br />The specific standards for Geological and Geotechnical Analysis at EC 9.6710 are discussed in <br />further detail below. Public Works staff finds that those standards have been met with the <br />applicant's report. <br />Flood Hazard <br />The development site is at the top of a hill, outside of any flood hazard areas, and does not create <br />a flood hazard. Stormwater flood control requirements are further addressed below, under the <br />related standards at EC 9.8320(10)(j). <br />Other public health and other necessary infrastructure improvements have been previously <br />addressed with respect to EC 9.8320(5)(a) and below, under (10)(b). With regard to emergency <br />response, the Fire Department has provided referral comments separately. Based on the available <br />information, staff concludes that the proposed development complies with this criterion. <br />(7) Adequate public facilities and services are available to the site, or if public services and <br />facilities are not presently available, the applicant demonstrates that the services and <br />facilities will be available prior to need. Demonstration of future availability requires <br />evidence of at least one of the following: <br />(a) Prior written commitment of public funds by the appropriate public agencies. <br />(b) Prior acceptance by the appropriate public agency of a written commitment by <br />the applicant or other party to provide private services and facilities. <br />(c) A written commitment by the applicant or other party to provide for offsetting all <br />added public costs or early commitment of public funds made necessary by <br />development, submitted on a form acceptable to the city manager. <br />Public Works staff concurs with the applicant's statement that adequate public utilities and <br />services are presently available to the site, also as indicated on the applicant's plans. Further <br />findings at EC 9.8320(10)(b) and (j), regarding public improvements and stormwater respectively, <br />are incorporated herein by reference as further evidence that these services are available to the <br />site. The applicant has proposed a stormwater system to be constructed through the PEPI process, <br />which will limit post development runoff to pre-development levels, consistent with the criteria <br />set forth in EC 9.6791 through 9.6797. Those standards outline the requirements for flood control, <br />water quality, and flow control and are further discussed below. <br />Capital Hill PUD (PDT 17-1) Page 8 of 22 <br />