My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Application Materials
>
OnTrack
>
CU
>
2018
>
CU 18-1
>
Application Materials
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2018 8:24:25 AM
Creation date
2/26/2018 5:26:03 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CU
File Year
18
File Sequence Number
1
Application Name
U OF O NORTH CAMPUS
Document Type
Application Materials
Document_Date
2/26/2018
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Campus Planning Committee <br />October 27, 2017 Meeting <br />Page 3 <br />path and there would be more people nearby. This alignment seems to be better from <br />an ecological perspective as well, although proximity some cyclists might prefer an <br />alignment of the bike path closer to the river's edge. <br /> What is the duration of a typical Conditional Use Permit? <br /> <br />and the submission of the Master Site Plan to the city. In the materials submitted to the <br />make the right decision later. For example, where the land within the boundary narrows <br />internally instead of being forced to go back to the city to ask for adjustments. <br /> <br />commitment to laying back the bank despite the fact that funds are not yet in place for <br /> If no independent parking structure is allowed in Area 5, where would the users of the <br />building park? <br /> Is there access to the land north of the tracks from the west? <br /> The scenarios shown have done a "pretty good job" compromising on the size of the <br /> The architecture studio studying the academic building on the west of the Knight <br />Campus site has discovered that the existing bridge across the Millrace at Onyx is <br />constrained. The existing connection may not be wide enough to accommodate the <br />university's long term needs. This is the main connection point and must be wide <br />existing alignment may need to be corrected as well. <br /> In Area 7, what is the thinking behind the 30% coverage number and the 37-foot height <br />limit? If a lower height were later deemed more appropriate would consideration be <br />given to increasing the coverage number? <br /> <br />area? Does the City of Eugene suggest preservation of the Oak Savanna? <br /> Should the project specify a ratio of hardscape to softscape for the purposes of <br /> <br />of the tracks. <br />Action: No action was requested. The committee's comments will be considered as the planning <br />project continues. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.