My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Application Materials
>
OnTrack
>
CU
>
2018
>
CU 18-1
>
Application Materials
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2018 8:24:25 AM
Creation date
2/26/2018 5:26:03 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CU
File Year
18
File Sequence Number
1
Application Name
U OF O NORTH CAMPUS
Document Type
Application Materials
Document_Date
2/26/2018
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Campus Planning Committee <br />October 27, 2017 Meeting <br />Page 2 <br />chair of the 2017-18 Campus Planning Committee. <br />3. North Campus - Conditional Use Permit - Overview and Discussion <br />Background: <br />Permit being submitted to the City of Eugene for review and the North Campus <br />Campus <br /> Amendment which follows the standard amendment process. The latter <br />PlanCampus Plan <br />future. <br />Emily Eng reviewed the feedback that has been received so far from the stakeholder groups <br />(that have been consulted throughout the course of the project) and described the draft <br />Master Site Plan Diagram. She showed a diagram with the larger context around the North <br />Campus site. This context includes the EWEB Riverfront Master Plan area (with a height <br />limit ranging from 35 to 120 feet) and the new student housing complex on the former <br />Louis Restaurant site (with a height limit of 120 feet). The proposed height limit on the <br />north campus site south of the tracks is a maximum of 75 feet (with an additional 15 feet <br />of screened mechanical area allowed). North of the tracks, the proposed height limit is a <br />maximum of 45 feet (with an additional 15 feet of screened mechanical area allowed) in the <br />east and west development sites and 15 feet in the central development area. Two potential <br />concepts exploring the type of development that could occur within the restrictions of the <br />draft Master Site Plan were also presented and discussed. <br />In addition, Eng described a number of questions that have been raised regarding the <br />substantiate the demand, the associated space that is required (and potential alternative <br />locations for that space), to assess the existing facilities, and to study the best way to <br />accommodate necessary new facilities. <br />Discussion: The following is a compilation of questions and comments from the committee and <br />guests. These were addressed by the project team and discussed through the course of the <br />meeting: <br /> <br /> <br />large open spaces. A member from the Physics Department cited one example - an <br />appropriate space for launching rockets. <br /> <br /> <br />tracks? <br /> Will the proposed bike path be lit for safety purposes? <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.