Capital Hill PUD Page 4 of 67 <br />Planned Unit Development Application - Tentative Stage - Written Statement <br />March 3, 2017 (Revised:June 19, 2017, August 22, 2017) <br />March 3, 2017 <br />Revised: June 19, 2017 <br />Revised: August 22, 2017 <br />TENTATIVE PUD APPLICATION <br />General Housing Criteria <br />CAPITAL HILL PUD <br />PROJECT DIRECTORY <br />PROPERTY OWNER / APPLICANT <br />Cynthia and Thomas Dreyer <br />2995 Capital Drive <br />Eugene, OR 97403 <br />Contact: Tom Dreyer <br />Phone : 541.953.7547 <br />APPLICANT'S REPRESENTATIVE <br />LAND USE PLANNER, LANDSCAPE ARCHITECT <br />Schirmer Satre Group <br />375 West 4th <br />Suite 201 <br />Eugene, OR 97401 <br />Contact: Carol Schirmer <br />Email: carol@schirmersatre.com <br />Phone: 541.686.4540 x1 <br />CIVIL ENGINEER <br />Branch Engineering, Inc. <br />310 5th Street <br />Springfield, OR 97477 <br />Contact: Lane Branch <br />Email: Lane@branchengineering.com <br />Phone: 541.746.0637 <br />SURVEYOR <br />Roberts Surveying, Inc. <br />PO Box 7155 <br />Springfield, OR 97475 <br />Contact: Kent Baker <br />Email: kent@robertssurvey.com <br />Phone: 541.345.1112 <br />GEOTECHNICAL ENGINEER <br />Branch Engineering, Inc. <br />310 5th Street <br />Springfield, OR 97477 <br />Contact: Ron Derrick, P.E., G.E. <br />Email: RonD@branchengineering.com <br />Phone: 541.746.0637 <br />Schirmer Satre Group • 375 West 4 m Avenue, Suite 201, Eugene, OR 97401 • (541) 686-4540 <br />