FAIRMOUNT BLVD. <br />O <br />O <br />Y <br />2 <br />O <br />0 <br />Q <br />N <br />3 <br />a <br />M <br />0 <br />0 <br />I <br />W <br />0 <br />i <br />J <br />om <br />N~ <br />0 <br />,ry <br />N ° <br />LEGEND <br />- - - - - - - BOUNDARY LINE <br />PROPOSED LOT LINE <br />EXISTING RIGHT-OF-WAY LINE <br />EXISTING SIDEWALK <br />L) <br />Lu <br />Lu <br />Lu <br />z <br />J <br />u <br />Q <br />U_ <br />LU <br />J <br />W <br />Lu <br />l/1 <br />Lu <br />z <br />J <br />u <br />Q <br />EAST 26 <br />EAST 27TH <br />WIMIAWN AVFNIIF <br />EXHIBITS <br />J AND JA <br />HENDRICKS PARK <br />- - - - <br />r7 <br />EXHIBITS 2 ~ I~°• f f ~ I <br />AND 2A I ~ <br />Al °„s I <br />f.....o.+~ -LOT 22 <br />nom, <br />9 a~ I' u J <br />V "I <br />~q /0000 <br />0 200 <br />*NOTE. SURVEY PROVIDED BY TED BAKER <br />I <br />EXHIBITS 4 <br />AND 4A <br />T <br />~ J <br />I <br />-NJ <br />ranch <br />ENGINEERING= <br />Si.. 1977 <br />civil • transpo nation <br />structu raI - geotechnical <br />SURVEYING <br />1462 Q061WM&S ST. NE <br />Sp3k9fPlJ1CF0 X&0A77 <br />P: 5®3.]40.063] <br />v ww,6ranch Englneering,c°m <br />Spring Field OR I Sz1-OR <br />Z <br />00 <br />r <br />Q <br />J <br />Q <br />W <br />a~ <br />J LLLI <br />J_ IL <br />= cQ <br />JV <br />LQ IL <br />1 <br />LL. <br />Q <br />V~ <br />revisions. <br />0 <br />date <br />8,8,2017 <br />drawn by: <br />MD <br />designer: <br />project no:. <br />14-020 <br />FIGURE 1 <br />OVERALL SITE <br />AND <br />CAPITAL DRIVE <br />sheet FIG. 1 <br />I N <br />