Capital Hill PUD Page 55 of 67 <br />Planned Unit Development Application - Tentative Stage - Written Statement <br />March 3, 2017 Revised:June 19, 2017 <br />connection within a reasonable distance to the site. Some areas will utilize underground detention <br />tanks for flow control to level spreaders and bubblers. The development will also incorporate <br />pervious pavement in some locations, namely Capital Drive as an impervious area reduction <br />technique. For additional information on existing and post-developed runoff rates, please see the <br />Stormwater Management Plan and Drainage Study. <br />EC 9.6794 Stormwater Oil Control <br />Our proposed development does not meet any of the criteria listed in the "Applicability" portion of <br />this code section and therefore does not include design features that specifically address this <br />issue. <br />EC 9.6795 Stormwater Source Controls <br />The solid waste storage will be in traditional rolling carts much like a single family house. There will <br />be no separate solid waste storage areas. This development will not have any other source control <br />pollutants to address. <br />EC 9.6796 Dedication of Stormwater Easements <br />The stormwater from the public street will be treated in storm water treatment facilities in the right of <br />way. These facilities will be maintained by the city. They are in the right of way so no easements <br />will be necessary. <br />EC 9.6797 Stormwater Operations and Maintenance <br />All stormwater management measures proposed on the development site are private <br />improvements. When the project is submitted for Building Permit, the City's "Form O & M: <br />Operations & Maintenance Plan" and "Notice of Operation and Maintenance Plan" documents will <br />be completed and the "Notice of Operation and Maintenance Plan" will be recorded with Lane <br />County. <br />See attached draft Stormwater Operations and Maintenance Plan for public stormwater. <br />(k) All other applicable development standards for features explicitly included in the application except <br />where the applicant has shown that a proposed noncompliance is consistent with the purposes set <br />out in EC 9.8300 Purpose of Planned Unit Development. <br />Property is zoned R-1 <br />Maximum Building Height <br />Main Building <br />Proposed Building Height <br />Minimum Building Setback <br />Front Yard Setback <br />Interior Yard Setback <br />Proposed Front Yard setback <br />Proposed interior yard setback <br />30 feet <br />No buildings are proposed as a part of this PUD. <br />Buildings will not exceed maximum height allowed <br />in the zone. <br />To be evaluated at time of building permit submittal. <br />10 feet <br />5 feet minimum or 10 feet between buildings <br />10 feet (evaluated at time of building permit submittal). <br />5 feet (evaluated at time of building permit submittal). <br />All existing structures meet these setback requirements. <br />Note: <br />The existing building on Lots 4 and 5 will remain. The 2 lots will be used as one lot until the <br />existing building is removed and building permits are requested for Lot 4 and/or Lot 5. <br />Maximum Lot Coverage <br />All lots 50% of lot. <br />Proposed lot coverage 50% of lot to be evaluated at time of building permit <br />Schirmer Satre Group • 375 West 4 m Avenue, Suite 201, Eugene, OR 97401 • (541) 686-4540 <br />