possible configuration of sites. This particular area provides multiple possible configurations to meet the <br />full needed portfolio, geographically focused around the southern portion of the area. Each of the Goal <br />14 boundary location factors are evaluated for this expansion option below. <br />City of Eugene Urban Growth Boundary Study <br />Industrial Land Evaluation <br />Focused Expansion Option 5: South of Clear Lake Road <br />0) <br />I~ `ry <br />1 <br />~ k J <br />i • 1 <br />7 k~.. <br />?'t <br />I <br />Land Inside UGB 75+ Acre Options <br />Major Streets 50-75Acre Options <br />Water Bodies 20-50Acre Options <br />Other Land Within Industrial Expansion Study Area 10-20 Acre Options <br />Tax Lots Selected for School Expansion <br />Remaining candidate Tax Lots <br />Eugene <br />,"O"- l,r"ne' <'dp. I <br />Appendix B to Findings May 2017 Page 142 <br />