(b) Dismiss Remaining Candidate Land that Cannot Reasonably <br />Accommodate the Specific Types of Land Needs / Cannot be <br />Expected to Provide the Appropriate Site Characteristics for the <br />Proposed Use <br />City of Eugene Urban Growth Boundary Study <br />Industrial Land Evaluation <br />Subarea P4.8: Site Characteristics of Unconstrained Land <br />P474e <br />P4.8a P4.SP4.8i <br />`i. <br />P4.8o <br />ti <br />i <br />Y <br />I <br />l <br />P4.8k <br />I'E y <br />Eugene Airport i P4.81 <br />4y ~o <br />. <br />i~ <br />P4 .$g <br />I; Current UGB <br />1 <br />P4.8h <br />Subarea Boundary M Second Priority Land Pending Fourth Priority Analysis <br />r-• <br />Current Eugene UGH Displayed Site Characteristics of Unconstrained Land - <br />Taxlols - Sites More than 7 Mite from Freight Route <br />Street. Rights of Way - Sites of Insufficient Size within 1 Mile of Freight Rccde <br />Major Streets ~i Fourth Prionty Land for Further Consdderaaon Eugene <br />Designated Freight Route <br />Streets within a Mile of Freight Route Acce55 <br />constrained Land <br />Appendix B to Findings May 2017 Page 109 <br />