Dismissal of sites that are more than 1 mile by road from access to a State Designated Freight Route <br />The nearest State Designated Freight Route to Subarea P3.1 is Highway 126. No land under <br />consideration in this subarea is within one mile of Highway 126.29 <br />Dismissal of land that could not accommodate one of the following sites on a contiguous area comprised <br />of one or two tax lots: <br />• an industrial site of 75 acres or larger (Eugene needs to add 2 such sites) <br />• an industrial site of between 50 and 75 acres (Eugene needs to add 3 such sites) <br />• an industrial site of between 20 and 50 acres (Eugene needs to add 2 such sites) <br />• an industrial site of between 10 and 20 acres (Eugene needs to add 4 such sites) <br />As explained above, no sites in Subarea P3.1 remain for consideration under this criterion. <br />Subarea P3.1 Summary. Based on these findings, the City has determined that none of the land in <br />Subarea P3.1 is suitable for industrial expansion. <br />(3) Third Priority Land Conclusion <br />Based on these findings, the City has determined that no third priority land in the study area is suitable <br />for industrial expansion. <br />29 Were they not discarded for distance from a Freight Route, these sites would be discarded for insufficient size to <br />meet the identified site characteristics. <br />Appendix B to Findings May 2017 Page 62 <br />