Figure 2. Employment Land Supply (2012-2032) <br />Map tile 12 of 18 <br />B <br />B <br />70, <br />Harlow Rd <br />_Ie <br />D <br />ak~o o <br />o <br />CU <br />1 ■ ~ <br />Ce4ntn, l / ~ ~ <br />sou`~11 Wb_I1,05 11,05 <br />a oo -Rd X1'05 <br />dam <br />Ge Eb Conr <br />~1~ rs Dry ■ <br />Martin-Luther in, ~Jr Blvd ommo C <br />U B.I <br />p <br />q) 70 -R-6 Kinsrow=Ave° , M~~ L <br />HE 0 <br />W CenteririialLBlvd <br />CU <br />9 <br />C ~p E 1 p tfi Ave~ ~ <br />F(o <br />~I <br />8 -2 W c~i r <br />❑t=❑13th Ave CU_ Frame <br />B B f= Q~ u~ I nklin=ejvd ~ <br />v~ N 6--15~° frp <br />Ell] 75 <br /><11 <br />■ B <br />Urban Growth Boundary D 2012 BLI Taxlots -Major Streets o 0.25 0 Miles <br />.5 N <br />- - UGB Expansion Boundary Water Bodies Rail Road May 2017 <br />Plan Designations -Vacant Employments Lands Caution: This map is subject to change and for use within the scope of <br />the May 2017 Review. This map is not suitable for legal, engineering, or <br />purposes. <br />cesces: : City <br />Commercial Kk Special Heavy Industrial Government & Education Data Surveyi Song urr <br />City <br />y - of Eugene, RLI D. <br />- The land supply was conducted at a sub-tax lot level analysis; tax lot <br />® Major Retail Center Light Medium Industrial Parks and Open Space boundaries are shown for reference only and may change over time. <br />- For assumed capacity of land shown on the land supply, see Table 5 of <br />N` Commercial Mixed Use 21i Campus Industrial N` Parks/Open Space Mixed Use Part VI. <br />Heavy Industrial University Research N Mixed Use <br />Partially Vacant (PV) or Redevelopment Employment Lands ® Industrial (IND) vacant - 10 acres s <br />7 <br />a <br />Industrial (IND) Partially Vacant/ Redevelopment Employment (E) Zone 910 11 12 <br />0 Commercial (COM) Partially Vacant Developed Commercial & Industrial Lands 1a is 1 <br />Committed or Protected Lands (in UGB) 18 <br />