Figure 2. Employment Land Supply (2012-2032) <br />Mao tile 11 of 18 <br />d <br />0 <br />W 2ncl~AvP~`~ <br />F <br />T <br />J <br />0 <br />0 0~ <br />AM <br />- <br />E ~~1 <br />~I- <br />J ff' <br />! <br />0 <br />0 <br />Off <br />LE <br />T <br />9 <br />_ <br />~ <br />l <br />m <br />p <br />q <br />RM <br />4~m <br />lll ~1 <br />[~p PItI <br />I <br />'m <br />Urban Growth Boundary D 2012 BLI Taxlots - <br />Major Streets <br />o o.zs <br />Miles <br />o.s N <br />- - UGB Expansion Boundary Water Bodies <br />Rail Road May 2017 <br />Plan Designations -Vacant Employments Lands <br />- caution: This map is subject to change and for use within the scope of <br />the May 2017 Review. This map is not <br />suitable for legal, engineering, or <br />Commercial KN Special Heavy Industrial <br />Government & Education surveying purposes. <br />- Data Sources: City of Eugene, RLID. <br />® Major Retail Center Light Medium Industrial <br />- The land supply was conducted at a sub-tax lot level analysis; tax lot <br />Parks and Open Space boundaries are shown for reference only and may change over time. <br />Commercial Mixed Use ~ Campus Industrial <br />N` Parks/Open Space Mixed Use -RaFortrvlass.umed capacity of land shown <br />on the land supply, see Table 5 of <br />Heavy Industrial University Research <br />N Mixed Use <br />Partially Vacant (PV) or Redevelopment Employment Lands IZJ Industrial (IND) vacant 10 acres <br />s <br />7 <br />a <br />Industrial (IND) Partially Vacant/ Redevelopment <br />Employment (E) Zone <br />910 <br />11 <br />12 <br />0 Commercial (COM) Partially Vacant <br />Developed Commercial & Industrial Lands <br />la <br />is <br />Committed or Protected Lands (in UGB) <br /> <br />