Figure 2. Employment Land Supply (2012-2032) <br />Map tile 5 of 18 <br />'ALI <br />Airport_Rd <br />c9 <br />Water Qualit <br />Management Area <br />\ <br />Clear-Lake-Rd <br />\g Rd <br />= <br />Land <br />= <br />for <br />c <br />Schools <br />C~ <br />Land <br />Water Quality <br />for I~?ananunent4re, <br />Parks <br />Bodenhamer Rd <br />E'P <br />P-H <br />I <br />a <br />e <br />EYE <br />_Q <br />65 <br />BEEN <br />Mm <br />C) <br />- <br />~ ~A~ <br />(B', <br />~ffl <br />0 <br />-0 <br />0 <br />N <br />N; <br />C <br />J <br />(B <br />Firtopr <br />z <br />z <br />Urban Growth Boundary D 2012 BLI Taxlots - <br />Major Streets <br />0 0.25 <br />Miles <br />0.5 N <br />- - - UGB Expansion Boundary Water Bodies <br />Rail Road May 2017 <br />Plan Designations -Vacant Employments Lands <br />Caution: This map is subject to change and for use within the scope of <br />the May 2017 Review. This map is not <br />suitable for legal, engineering, or <br />Commercial KN Special Heavy Industrial <br />y <br />Government & Education Datta a So SUfV Souurrcesces: : City <br />City <br />- of Eugene, RLI D. <br />® Major Retail Center Light Medium Industrial <br />- The land supply was conducted at a sub-tax lot level analysis; tax lot <br />Parks and Open Space boundaries are shown for reference only and may change over time. <br />N` Commercial Mixed Use 21~ Campus Industrial <br />- For assumed capacity of land shown <br />N` Parks/Open Space Mixed Use Part VI. <br />on the land supply, see Table 5 of <br />Heavy Industrial University Research <br />N Mixed Use <br />Partially Vacant (PV) or Redevelopment Employment Lands ® Industrial (IND) vacant - 10 acres <br />s <br />7 a <br />Industrial (IND) Partially Vacant/ Redevelopment <br />Employment (E) Zone <br />910 11 12 <br />0 Commercial (COM) Partially Vacant <br />Developed Commercial & Industrial Lands <br />1a is 1 <br />Committed or Protected Lands (in UGB) <br />18 <br />