'ALI <br />Figure 2. Employment Land Supply (2012-2032) <br />Map the 4 of 18 <br />■ <br />6FAvl <br />gleD <br />p <br />ryu r <br />B <br />ICU <br />_ <br />Ayres Rd u <br />PEE 0 <br />O ~ <br />o'p Z <br />p <br />~C keview Dr <br />U_J <br />p <br />rark View Dr <br />T <br />Greeter E <br />res /Rd s ~Crescent_Ave <br />C~ <br />EEO <br />is <br />Rd acY~r/ - <br />Wb Belflie <br />~FII \ I o <br />m r-z <br />G <br />oodpastur <br />e <br />_ <br />_ <br />Island Rd JeWeseh_ <br />q <br />~cres Rd <br />Minda Dr - <br />Urban Growth Boundary D 2012 BLI Taxlots -Major Streets Miles <br />0 0.25 0.5 N <br />- - - UGB Expansion Boundary Water Bodies Rail Road May 2017 <br />Plan Designations -Vacant Employments Lands Caution: This map is subject to change and for use within the scope of <br />the May 2017 Review. This map is not suitable for legal, engineering, or <br />Commercial KN Special Heavy Industrial Government & Education Datta a So SUfV Souurrcesces: : City <br />City <br />- of Eugene, RLI D. <br />- The land supply was conducted at a sub-tax lot level analysis; tax lot <br />® Major Retail Center Light Medium Industrial Parks and Open Space boundaries are shown for reference only and may change over time. <br />- For assumed capacity of land shown on the land supply, see Table 5 of <br />N` Commercial Mixed Use 21~ Campus Industrial N` Parks/Open Space Mixed Use Part VI. <br />Heavy Industrial University Research N Mixed Use <br />Partially Vacant (PV) or Redevelopment Employment Lands ® Industrial (IND) vacant - 10 acres <br />s <br />Industrial (IND) Partially Vacant/ Redevelopment Employment (E) Zone 910 11 12 <br />0 Commercial (COM) Partially Vacant Developed Commercial & Industrial Lands 1a 15 1 <br />Committed or Protected Lands (in UGB) 18 <br />