My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPLICATION MATERIALS
>
OnTrack
>
PDT
>
2017
>
PDT 17-1
>
APPLICATION MATERIALS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2017 4:04:22 PM
Creation date
3/7/2017 10:01:45 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
17
File Sequence Number
1
Application Name
CAPITAL HILL PUD
Document Type
Application Materials
Document_Date
3/3/2017
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Hill PUD Page 48 of 63 <br />Planned Unit Development Application - Tentative Stage - Written Statement <br />March 3, 2017 <br />propose the maximum of 3 units, then the multi-family development standards and <br />pedestrian connection standards would apply. This will need to be evaluated at time of <br />building permit submittal, as no units are proposed as a part of this application for a <br />Planned Unit Development. <br />2. From every unit to all laundry, recreational and other community facilities in the <br />residential development. <br />See answer to 1 above. It is likely that these units will have self-contained laundry <br />facilities in each of the units, There will more than likely be a common walkway that <br />connects the units to the proposed sidewalk on the private drive, which will then <br />connect these units to all other units in the development. This will be evaluated at time <br />of building permit submittal. <br />3. From every building located within 40 feet of a public or private street to the street <br />right-of-way line. <br />See answer to 1 and 2 above. <br />(3) Design of On-Site Pedestrian Facilities. All on-site pedestrian paths provided for the <br />purposes of complying with this land use code shall conform with the following standards: <br />(a) On-site pedestrian paths shall provide direct access from public ways to building <br />entrances. <br />Compliance with this criterion will be evaluated at time of building permit submittal if Lot 7, <br />Lot 18, and/or 35 are developed with 3 units. A development of that nature would need to <br />meet the multiple family development standards. <br />(b) On-site pedestrian paths shall be constructed of concrete, a comparable hard surface <br />material, or any properly designed pervious surface that complies with the Americans with <br />Disabilities Act. <br />Compliance with this criterion will be evaluated at time of building permit submittal. <br />(c) On-site pedestrian paths shall be raised to standard curb height when adjacent to public <br />and private streets or driveways. <br />Compliance with this criterion will be evaluated at time of building permit submittal. <br />(d) On-site pedestrian paths intersected by driving aisles shall be marked with striping or <br />constructed with a contrasting paving material to indicate a pedestrian crossing area. <br />To be evaluated at time of building permit submittal. <br />(e) Pedestrian scale lighting in conformance with the standards in EC 9.6725 Outdoor Lighting <br />Standards shall be provided along pedestrian facilities. <br />See Site Plan note regarding the pedestrian scale lighting. Specific lighting plans can be <br />evaluated at time of building permit submittal. <br />(f) EC 9.6735 Public Access Required. <br />(1) Except as otherwise provided in this land use code, no building or structure shall be erected or <br />altered except on a lot fronting or abutting on a public street or having access to a public street <br />over a private street or easement of record approved in accordance with provisions contained <br />in this land use code. <br />The development site abuts a public street and a private drive. Where the lots do not directly <br />abut either one of these, there is an access easement in place. <br />(2) Access from a public street to a development site shall be located in accordance with EC 7.420 <br />Access Connections - Location. If a development will increase the development site's peak <br />hour trip generation by less than 50% and will generate less than 20 additional peak hour trips, <br />the development site's existing access connections are exempt from the standard. <br />Schirmer Satre Group • 375 West 4 `h Avenue, Suite 201, Eugene, OR 97401 • (541) 686-4540 <br />
The URL can be used to link to this page
Your browser does not support the video tag.