My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPLICATION MATERIALS
>
OnTrack
>
PDT
>
2017
>
PDT 17-1
>
APPLICATION MATERIALS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2017 4:04:22 PM
Creation date
3/7/2017 10:01:45 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
17
File Sequence Number
1
Application Name
CAPITAL HILL PUD
Document Type
Application Materials
Document_Date
3/3/2017
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Hill PUD Page 8 of 63 <br />Planned Unit Development Application - Tentative Stage - Written Statement <br />March 3, 2017 <br />Show all contiguous property under the <br />the same ownership. <br />Show all proposed grading for streets, <br />building areas and other prop. development. <br />Show the type and size of existing <br />or proposed fencing and/or landscape <br />buffering. <br />Show phasing boundaries <br />Include a phasing plan <br />Wastewater Requirements <br />Location and flow line of existing <br />public waste water at.connection points <br />Existing and proposed wastewater sewer <br />layout including service to each lot. <br />Water Supply Requirements <br />Existing and proposed water main <br />Shown on Ownership Plan on Site Plan <br />Shown on Public Roadway Plan and Private <br />Roadway Plan <br />Shown on Site Plan <br />No phasing <br />No phasing <br />See Wastewater and Water plan <br />See Wastewater and Water plan <br />See Wastewater and Water plan <br />Existing and proposed fire hydrant <br />Storm Drainage Requirements <br />Show location and flow line <br />elevation of existing piped public system <br />at proposed connection point(s). <br />Tops of banks of all open waterways <br />on and adjacent to the property. <br />Special Flood Hazard Area <br />Base Flood Elevation <br />Watercourse alteration <br />Existing and proposed storm drainage <br />Stormwater analysis <br />Indicate whether Stormwater system <br />or portions thereof are proposed for <br />public or private maintenance. <br />See Site Plan <br />See Stormwater Plan <br />No waterways either on site or adjacent to the site <br />Not in a special flood hazard zone <br />None necessary. Not in a flood plain <br />No watercourses on site <br />See Stormwater Plan <br />See attached Stormwater Management Plan <br />and Drainage Study <br />Privately maintained on site. <br />Publicly maintained in the right of way. <br />Submit a draft Operations and Maintenance See attached. <br />Plan (private facility) and/or Operations <br />and Maintenance Agreement (public <br />facility) <br />Tree Preservation Requirements <br />Tree Preservation Plan and.Report See Tree Preservation Plans and <br />Schirmer Satre Group • 375 West 4'" Avenue, Suite 201, Eugene, OR 97401 • (541) 686-4540 <br />
The URL can be used to link to this page
Your browser does not support the video tag.