Capital Hill PUD Page 7 of 63 <br />Planned Unit Development Application - Tentative Stage - Written Statement <br />March 3, 2017 <br />SITE PLAN REQUIREMENTS <br />This is based on the checklist provided for the PUD application. It is included in the written package for <br />clarity. <br />Site Plan Requirements <br />Date, North arrow, and standard Shown on Site Plan <br />engineers scale on site plan. <br />Show the Assessor's Map and Tax Shown on Site Plan <br />Lot number <br />Vicinity Map (not to scale) Shown on Site Plan <br />Dimensions of the plan boundary Shown on Site Plan and Surrey <br />Dimensions of proposed lots Shown on Site Plan <br />Approximate square footage calculations Shown on Site Plan <br />Proposed parcel lines Shown on Site Plan <br />Location of parcel lines / parcels greater Shown on Site Plan <br />than 13,500 sf <br />Location of existing and proposed structures Shown on Site Plan <br />Indicate remain or remove <br />Existing Structures Shown on Site Plan <br />Proposed Structures None proposed <br />Provide elevation drawings that portray None proposed <br />the scale and appearance of the proposed <br />buildings. <br />Tabulation of Site Coverage Shown on Site Plan <br />Impervious Surface Existing: 15,538 SF <br />Impervious Surface Proposed: 21,702 SF <br />Buildings: 15,538 SF <br />Parking and Circulation: 21,702 SF <br />Open Space: (not including buildable lot area) <br />222,296 sf or 5.11 acres <br />Indicate on the map and provide a supporting See Site Plan <br />written statement addressing the solar criteria <br />This applies only to land zoned R-1 and R-2. <br />Provide a cover sheet with the certification Shown on Cover Sheet <br />and signatures of the professional coordinator <br />and all design team members for the project <br />Show the width and location of all existing Shown on Site Plan <br />and proposed public and private easements. <br />Schirmer Satre Group 9 375 West 4 `h Avenue, Suite 201, Eugene, OR 97401 • (541) 686-4540 <br />