INFORMATIONAL ITEMS: <br />❑ A PEPI application to pipe North Braewood Creek at the southwest corner of the <br />development site was not issued and has expired. <br />❑ The site plan shows piping an on-site creek, and diverting the water to a proposed <br />pond. This proposal is not addressed through the CIR/CUP criteria and is not evaluated <br />or approved through this process. Staff recommends the applicant check if there are <br />any potential water rights issues that would be triggered by this proposal. <br />❑ The need for an erosion permit will be evaluated at the time a development permit is <br />submitted. <br />❑ Willamette Street was resurfaced in 2011 and is subject to a street cut moratorium. <br />CU 02-04 Cathedral Park Page 5 of 5 <br />