My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Public Comment (8)
>
OnTrack
>
PDT
>
2015
>
PDT 15-1
>
Public Comment (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2015 4:07:00 PM
Creation date
12/4/2015 1:52:36 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
15
File Sequence Number
1
Application Name
CHAMOTEE
Document Type
Public Comments
Document_Date
11/3/2015
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15. Prior to final subdivision approval, the applicant will be required to obtain a "LetterAPP-36 <br />Water Availability" from EWEB, which typically involves the design approval and <br />improvement bonding with EWEB. <br />16. The final PUD plans and final subdivision plat shall note the following requirement: "At the <br />time of development, each lot shall have its own filtration stormwater management system <br />(e.g. flow-through planter) that is sized to meet the applicable stormwater development <br />standards beginning at EC 9.6791, including Flow Control. Each lot owner will be <br />responsible for maintaining its stormwater management system consistent with EC 9.6797 <br />Stormwater Operation and Maintenance." <br />17. During the PEPI permit process, the public stormwater system shall include City-approved <br />proprietary stormwater treatment technology that meets the requirements of EC 9.6792 <br />Stormwater Pollution Reduction. <br />18. The final PUD plans shall state that the development will occur in accordance with the <br />geotechnical recommendations provided in the GeoScience, Inc. report dated February 4, 2007. <br />19. The final PUD plans shall be revised to note that fencing is not allowed on the perimeter of the <br />PUD or within the required 30' landscape buffer under the provisions of EC 9.8325(3) and EC <br />9.6210(7). <br />The foregoing findings and conclusions are adopted as the Final Order of the Eugene Planning <br />Commission f r Deerbrook PUD (PDT 12-1), on this 17th day of December, 2012. <br />Randall S. Hledik, Chair <br />Eugene Planning Commission <br />Final Order - Deerbrook PUD (PDT 12-1) December 17, 2012 Page 35 <br />38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.