13, Prior to final subdivision approval, the applicant will be required to obtain a "Letter of <br />Water Availability" from EWER, which typically involves the design approval and <br />improvement bonding with EWER. <br />14. The final PUD plans and final subdivision plat shall note the following requirement; "At <br />the time of development, each lot shall have its own filtration stormwater management <br />system (e.g. flow-through planter) that is sized to meet the applicable stormwater <br />development standards beginning at EC 9.6791. Each lot owner will be responsible for <br />maintaining its stormwater management system consistent with EC 9.6797 Stormwater <br />Operation and Maintenance." <br />15. During the PEPI permit process, the public stormwater system shall include City- <br />approved proprietary stormwater treatment technology that meets the requirements <br />of EC 9.6792 Stormwater Pollution Reduction. <br />Dated this , - day of September 2012. <br />Mailed this day of September 2012. <br />Jeffr . Litwak <br />Hearing Official <br />SEE NOTICE OF HEARINGS OFFICIAL DECISION FOR STATEMENT OF APPEAL RIGHTS <br />Hearing Official Decision (PDT 10-2, CU 11-1) 36 <br />