consistent with the City's Stormwater Management Manual, and notice of this plan will be <br />recorded, during the building permit process." <br />With the findings, conditions, and future permit requirements noted above, this criterion is met. <br />EC 9.8325(8): The applicant has demonstrated that wastewater service, transportation service, <br />stormwater service, water service, and electrical service will be provided to the site prior to the <br />need for those facilities and services. Where the facility or service is not already serving the site, <br />this demonstration requires evidence of at least one of the following: <br />(a) Prior written commitment of public funds by the appropriate public agencies. <br />(b) Prior acceptance by the appropriate public agency of a written commitment by the <br />applicant or other party to provide private services and facilities. <br />(c) A written commitment by the applicant or other party to provide for offsetting all <br />added public costs or early commitment of public funds made necessary by <br />development, submitted on a form"acceptable to the city manager. <br />Public Works staff concurs with the applicant's statement that adequate public utilities and services, <br />including wastewater and stormwater service, are presently available to the site. Findings at EC <br />9.8325(7)(b) and (j), regarding public improvements and stormwater respectively, are incorporated <br />herein by reference as further evidence that these services are available to the site. Given these <br />findings, the proposal is in compliance with this criterion. <br />The provision of water and electric services and other utilities is subject to review by EWEB or other <br />utility providers. <br />Based on the above findings, this criterion is met. <br />EC 9.8325(9): All proposed dwellings within the PUD are within 1/4 mile radius (measured from <br />any point along the perimeter of the development site) of an accessible recreation area or open <br />space that is at least 1 acre in size and will be available to residents. <br />This criterion is met by the proposed common open space within the development site and by the <br />City-owned parkland located to the north of the dead-end of West Amazon Drive. <br />EC 9.8325(10): Lots proposed for development with one-family detached dwellings shall comply <br />with EC 9.2790 Solar Lot Standards (these standards may be modified as set forth in subsection <br />(11) below). <br />EC 9.2790(3)(b) allows an exception to EC 9.2790(2) if compliance with street standards requires a <br />configuration that prevents lots from being oriented for solar access. Additionally, an exception can be <br />granted if natural features prevent the lots from being oriented for solar access. Lots 1-3 comply with <br />solar lot standards as they have a north-south dimension greater than 75 feet and a front lot line <br />orientation within 30 degrees of east-west. The applicant asserts that Lots 4-10 are exempt from <br />these standards because the alignment of West Amazon Drive and Vivian Drive prevent a front line <br />orientation within 30 degrees of east-west. Therefore, in the event that the Hearings Official <br />approves the tentative PUD, an exception to EC 9.2790 is recommended for Lots 4-10. <br />Hearings Official Decision (PDT 15-1/ ARA 15-13) 21 <br />