My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Public Comment - received during open record period (closed 11-12-15)
>
OnTrack
>
PDT
>
2015
>
PDT 15-1
>
Public Comment - received during open record period (closed 11-12-15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 4:08:08 PM
Creation date
11/12/2015 4:11:52 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
15
File Sequence Number
1
Application Name
CHAMOTEE TRAILS
Document Type
Public Comments
Document_Date
11/12/2015
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Commentary <br />(C) Project Coordinator and Design Team <br />Based on existing EC 9.510(8) Professional Coordinator and Design Team. Section changed to <br />focus on key issues. Revised language no longer requires project coordinator to maintain a Lane <br />County address. <br />(D) Phasing <br />Based on existing EC 9.510(3) Phasin . Draft changed to clarify that any phasing plan submitted <br />with the tentative PUD application shall clearly show the boundaries and sequencing of each <br />phase. <br />(E) Density <br />Based on existing EC 9.510(6) Densi . <br />00007876 <br />514199 Commentary Page 9.6-23 <br />I-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.