My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Referral Comments
>
OnTrack
>
PDT
>
2015
>
PDT 15-1
>
Referral Comments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2015 4:01:54 PM
Creation date
11/9/2015 3:42:19 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
15
File Sequence Number
1
Application Name
CHAMOTEE TRAILS
Document Type
Referral Comments
Document_Date
11/9/2015
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Prior to final PUD approval, the Final PUD plan shall be revised to show that access to the lots <br />fronting on Vivian Drive is not permitted. <br />• Final PUD plans shall include the note: "On-site stormwater management facilities will be <br />privately owned and operated. An operation and maintenance plan will be developed consistent <br />with the City's Stormwater Management Manual, and notice of this plan will be recorded, during <br />the building permit process." <br />Informational Items: <br />Due to the size of the development, an erosion prevention permit will be required prior to any <br />ground disturbing activities. <br />At the time of subsequent subdivision review, the applicant shall be responsible for completing <br />improvements in West Amazon Drive, by completing half-street improvements through the PEPI <br />process, or by indicating that additional paving which will result in a minimum 20-foot surface <br />will be constructed through a Temporary Surfacing Permit, in which case an Irrevocable Petition <br />for future improvements is required. <br />• The need for street tree protections and tree removal permits will be evaluated during the <br />subsequent subdivision, building permit, Temporary Surface Permit and PEPI processes. <br />PDT 15-01 Chamotee Trails PUD Page 10 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.