5). The proposed system of pumping sewage up hill to reach the current sewer on Foxboro <br />Lane makes very little sense to me, particularly because any failure of that system will flow <br />downhill. A better solution would be to connect to the existing sewer line below the <br />development on Pine Forest. I understand that is more complicated and has potential cost <br />implications for other property owners, but it would be a gravity system, rather than relying on <br />pumping. <br />Thank you. I plan on attending the hearing on November 4. <br />[Submitted by email] <br />Richard W. Zeller <br />