PH-2 <br />Ms. Becky Taylor <br />Solar Setback Calculation - PDT 13-0001 <br />point will be the peak of the roof. (See Figure 9.2795(2) Shade Point Height (SPH) Measurement, <br />Figure 9.2795(2)(a) R-1 Solar Setback Calculation, and Figure 9.2795(2)(b) R-2 Solar Setback <br />Calculation.) <br />In addition, I see no reason to exempt the solar setbacks, so I urge the City planning staff and Hearings <br />official to require the proper solar setbacks along the north property line, <br />Sincerely, <br />Bryn Thorns, Oakleigh Lane Resident <br />Encl: Redline Revisions ofApplicant's Email with Figure Showing Proper Setback Distance <br />Excerpt of Building 1 and 2 Elevation Showing Dormer <br />Page 3 of 3 <br />1209 <br />