My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ATT New Evidence Submitted During First Open Record Period
>
OnTrack
>
CU
>
2014
>
CU 14-3
>
ATT New Evidence Submitted During First Open Record Period
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2015 4:11:17 PM
Creation date
6/18/2015 10:30:06 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CU
File Year
14
File Sequence Number
3
Application Name
ATT AT CROSSFIRE
Document Type
Public Comments submitted after hearings official hearing
Document_Date
6/17/2015
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
259
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
The proposed transmission tower is within this height limitation area and does not exceed 75 <br />feet in height, in compliance with this standard. <br />If located within a PL, C-2, C-3, C-4, R-4,1-1,1-2,1-3 or S-WS zone, <br />the height limitation for that zone shall apply. <br />The proposed tower is within an R-1 zone. This standard does not apply. <br />4. If located within a C-1, S (other than S-WS) or GO zone, the <br />maximum height of a transmission tower, including antennas, is <br />100 feet. <br />The proposed tower is within an R-1 zone. This standard does not apply. <br />5. If located within an R-1 zone, the maximum height of a <br />transmission tower, including antennas, is 75 feet, unless a <br />variance is granted pursuant to the provisions of subsection (9) <br />of this section. In no event shall a variance be granted to <br />construct such a tower in excess of 100 feet. <br />The proposed tower is within an R-1 zone. The maximum height of the tower is 75 feet, in <br />compliance with this standard. <br />(c) Collocation. New transmission towers shall be designed to <br />accommodate collocation of additional providers: <br />1. New transmission towers of a height of 80 feet or more shall be <br />designed to accommodate collocation of a minimum of 2 <br />additional providers either outright or through future <br />modification to the tower. <br />The proposed transmission tower is less than 80 feet in height. This standard does not apply. <br />2. New transmission towers of a height of at least 60 feet and no <br />more than 80 feet shall be designed to accommodate collocation <br />of a minimum of 1 additional provider either outright or through <br />future modification to the tower. <br />The transmission tower is proposed to be 75 feet. As noted in Exhibits P and Q of the <br />applicant's materials, the applicant has agreed to, and the tower can accommodate the <br />collocation of a minimum of 1 additional provider. <br />Hearing Official Decision (PDT 10-2, CU 11-1) 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.