My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ATT New Evidence Submitted During First Open Record Period
>
OnTrack
>
CU
>
2014
>
CU 14-3
>
ATT New Evidence Submitted During First Open Record Period
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2015 4:11:17 PM
Creation date
6/18/2015 10:30:06 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CU
File Year
14
File Sequence Number
3
Application Name
ATT AT CROSSFIRE
Document Type
Public Comments submitted after hearings official hearing
Document_Date
6/17/2015
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
259
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
The applicant provides a statement on page 14 of their PUD written materials that provide <br />reasoning for the location, design and height of the proposed tower or antenna structure. <br />(7) Standards for Transmission Towers and Antennas. Installation, construction or <br />modification of all transmission towers and antennas shall comply with the <br />following standards, unless a variance is obtained pursuant to the provisions of <br />subsection (9) of this section: <br />The hearing official points out that this section contains the substantive standards that the <br />proposed tower and ancillary facilities must meet. <br />(a) Separation Between Transmission Towers. No transmission tower may <br />be constructed within 2000 feet of any pre-existing transmission tower. <br />Tower separation shall be measured by following a straight line from <br />the portion of the base of the proposed tower which is closest to the <br />base of any pre-existing tower. For purposes of this paragraph, a tower <br />shall include any transmission tower for which the city has issued a <br />development permit, or for which an application has been filed and not <br />denied. Transmission towers constructed or approved prior to February <br />26, 1997 may be modified to accommodate additional providers <br />consistent with provisions for collocation in this section. <br />Based on available information, the nearest tower is located over a mile from the proposed <br />location and there are no pre-existing transmission towers within 2000 feet. <br />(b) Height Limitation: Transmission tower heights shall be governed by this <br />section except as provided for below. No transmission tower shall <br />exceed the maximum heights provided below. In no case shall a <br />variance be granted from the limitations of subparagraphs (1) through <br />(4) below. <br />1. In any zones, no transmission tower shall exceed the height <br />limitations established for buildings and structures in the <br />specified areas surrounding Skinner Butte contained in EC 9.6715 <br />Height Limitation Areas of this land use code to protect views to <br />and from Skinner Butte. <br />The proposed tower is not within the Height Limitation Area shown on EC Map 9.6715(3). This <br />standard does not apply. <br />2. In any zone within the area east of Willagillespie Road, south of <br />Cal Young Road, west of Oakway Road, and north of Southwood <br />Lane and Country Club Road, no transmission tower shall exceed <br />75 feet in height to protect views to and from Gillespie Butte. <br />Hearing Official Decision (PDT 10-2, CU 11-1) 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.