My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Public Comments 04-30-2015 thru 05-13-2015 (file 2 of 2)
>
OnTrack
>
CU
>
2014
>
CU 14-3
>
Public Comments 04-30-2015 thru 05-13-2015 (file 2 of 2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2015 4:05:46 PM
Creation date
5/20/2015 8:10:54 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CU
File Year
14
File Sequence Number
3
Application Name
ATT @ CROSSFIRE MINISTRIES
Document Type
Public Comments
Document_Date
4/30/2014
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br />Proof 4 Need for Facility - Capacity Issue <br />Documentation must be submitted to include but not be limited to the following: current a nd <br />forecasted blockage; current and forecasted dropped calls; current and forecasted usage volume. <br />To further c larify this requirement will require an analysis of c. urrent and projected usage for <br />each adjacent or adjoining site, by sector, for each sector in need of capacity relief, and a <br />description of specifically how the proposed site will relieve current and projected capacity <br />issues in each sector requiring relief. <br />Data nl ust i nclude a d ascription o Ft he c apacity design for C ach se ctor r equiring r clief ( usage <br />capacity) to include the transmitting base station equlpmcrIt specifications (cut sheets) in use (or <br />to he added if cquipnlcnt can be added) and indicating how the cquiplllCllt in usC or as proposal <br />relates to the Illaxlilllllll possible usage capacity for each sector affected by a need for capacity <br />relief. <br />Data should utilize a bouncing busy hour approach and must show usage or call volume over a <br />period of five (5) consecutive days. The report must show the average bottom-line numbers for <br />those five consecutive days. At least two (2) year of actual data needs to be provided to show (lie <br />asserted trend. <br />Propagation projections must be provided depicting existing and proposed coverage at -95dBm <br />in vehicle or -85dBnl in building coverage, and state whether the applicant is designing for in- <br />vehicle or in-building coverage, and how the proposed coverage will overlap existing coverage <br />to relieve existing o r p roj ected c apacity i ssues. ( This m ust b e d one for t he s actors requiring <br />relief.)The maps must indicate the output power level used and be prepared using the antenna <br />height as requested. <br />Calculations and the associated tables used need to be provided. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.