Technology J Associates <br />RESPONSE: Please see Att. 5 - Crossfire Church giving Aaron Taylor the power to sign on <br />behalf of Calvary Fellowship regarding the placement of a cell tower on Calvary <br />Fellowship's property. <br />10. <br />(a) Site Review and Conditional Use Permit Applications. In <br />addition to the application requirements specified in paragraph (b) <br />above, applications for site review or conditional use permits also <br />shall include the following information: <br />1. A visual study containing, at a minimum, a graphic <br />simulation showing the appearance of the proposed <br />tower, antennas, and ancillary facilities from at least 5 <br />points within a 3 mile radius. Such points shall be chosen <br />by the provider with review and approval by the <br />planning director to ensure that various potential views <br />are represented. The photo simulations and site plans <br />(which are inconsistent} leave unanswered questions about <br />how the project adequately addresses compatibility with <br />the surroundings. Further, additional viewpoints may be <br />necessary, such as from the intersection of Dillard Road and <br />Fox Hollow Road. <br />(7) Standards for Transmission Towers and Antennas. Installation, <br />construction or modification of all transmission towers and antennas <br />shall comply with the following standards, unless a variance is <br />obtained pursuant to the provisions of subsection (9) of this section: <br />7117 SW Beveland Street, Sulte 101 <br />Tigard, OR 97223 <br />(323) 559-4103 <br />Email: jacob.finnev@taec.net <br />www.taee.net <br />8 <br />