Loading...
HomeMy WebLinkAboutApplication Materials ADJUSTMENT REVIEW www.eugene-or.gov/planning Planning & Development Updated: January 2025 Planning Division 99 W. 10TH Avenue Suite 290, Eugene, OR 97401 Phone: 541.682.5377 or E-mail: planning@ci.eugene.or.us Page 1 of 3 Please complete the following application checklist. Note that additional information may be required upon further review to adequately address the applicable criteria for approval. If you have any questions about filling out this application, please contact Planning staff at the Permit and Information Center, phone (541) 682-5377, 99 West 10th Avenue, Eugene. List all Assessor’s Map and Tax Lot numbers of the property included in the request. Proposals are required to include all property under contiguous ownership of the applicant. Assessor’s Map Tax Lot Existing Zoning Code Sections Proposed for Adjustment Review List specific code sections for which adjustment review is proposed. Check if the Adjustment Review is for any of the following: Large commercial facility Large multi-tenant commercial facility, or Multiple-family housing Does adjustment request affect at least 2 of the following: Yes No (If yes, this application will be processed as a major adjustment review.) (a) Maximum front yard setbacks (b) Building orientation (c) Building entrances (d) On-site pedestrian circulation (e) Block requirements or street layout Does adjustment request include stormwater drainage facilities: Yes No (If request includes Pollution Reduction/Flow Control, submit approved alternative design. If request includes Source Control, submit DAR form.) Does request include an adjustment of internal vehicle stacking at Eugene Code Section 9.6703(3)(a): Yes No If yes, submit an Alternative Traffic Safety Study (ATSS). Associated pending Land Use Application or Building Permit numbers: www.eugene-or.gov/planning Planning & Development Updated: January 2025 Planning Division 99 W. 10TH Avenue Suite 290, Eugene, OR 97401 Phone: 541.682.5377 or E-mail: planning@ci.eugene.or.us Page 2 of 3 Filing Fee A filing fee must accompany all applications. The fee varies depending upon the type of application and is adjusted periodically by the City Manager. Check with Planning staff at the Permit and Information Center to determine the required fee or check website at www.eugeneplanning.org Submittal Requirements: Provide 2 paper copies and one digital copy (CD, USB Drive, or Other) of all application materials (i.e. written statement, site plans, etc.). Digital files must be in PDF file format. Please note that it is the applicant’s responsibility to make sure that the digital and paper copies are identical. Following completeness review, an updated digital and paper copies may be required. All paper site plans must be folded to a size equal or less than 11” x 17”. Written Statement Submit a detailed written statement describing how this request is consistent with all applicable criteria beginning at Eugene Code Section 9.8030. Please note: it is the applicant’s responsibility to provide adequate information demonstrating how the project satisfies the applicable approval criteria. Failure to provide such information may result in denial of your application. Submit an Alternative Traffic Safety Study (ATSS) if an adjustment is requested to required internal vehicle stacking at EC 9.6703(3)(a). Demonstrate that access to the development site is located in accordance with EC 7.420. Site Plan Requirements Show date, north arrow, and standard engineer’s or architect’s scale. Show the Assessor’s Map and Tax Lot numbers. Show a vicinity map on the plan. (Vicinity map does not need to be drawn to scale.) Show the dimensions of the site plan boundary. Show the location of all existing structures and indicate whether they will remain or be removed. Show any site features necessary to illustrate the basis for the proposed adjustment. Show access to the development site. Site Plan must be prepared, stamped and signed by one of the following: Oregon Licensed architect, Oregon licensed civil engineer, Oregon licensed landscape architect, a member of the American Institute of Certified Planners, or an Oregon licensed land surveyor. www.eugene-or.gov/planning Planning & Development Updated: January 2025 Planning Division 99 W. 10TH Avenue Suite 290, Eugene, OR 97401 Phone: 541.682.5377 or E-mail: planning@ci.eugene.or.us Page 3 of 3 By signing, the undersigned certifies that he/she has read and understood the submittal requirements outlined, and that he/she understands that omission of any listed item may cause delay in processing the application. I (We), the undersigned, acknowledge that the information supplied in this application is complete and accurate to the best of my (our) k nowledge. OWNER (Also the Applicant? Yes / No): Name (print): ____________________________________________ Phone: ___________________________________________ Address: ___________________________________________________________________________________________________ City/State/Zip: _______________________________________________________________________________________________ Signature: ___________________________________________________________________________________________________ APPLICANT / APPLICANT’S REPRESENTATIVE (Check one): Name (print): ________________________________________________________________________________________________ Company/Organization: _______________________________________________________________________________________ Address: ____________________________________________________________________________________________________ City/State/Zip: ___________________________________________ E-mail (if applicable): ________________________________ Phone: _________________________________________________ Fax: ______________________________________________ Signature: ___________________________________________________________________________________________________ APPLICANT’S REPRESENTATIVE / DESIGNATED CONTACT PERSON (Check all that apply): Name (print): ________________________________________________________________________________________________ Company/Organization: _______________________________________________________________________________________ Address: ____________________________________________________________________________________________________ City/State/Zip: ___________________________________________ E-mail (if applicable): ________________________________ Phone: _________________________________________________ Fax: ______________________________________________ Signature: ___________________________________________________________________________________________________ Note: This is not a complete list of requirements. Additional information may be required after further review in order to adequately address the applicable approval criteria. SANDOWENGINEERING 777 HIGH STREET SUITE 320 EUGENE, OREGON 97401 541.513.3376 TECHMEMO DATE: September 29, 2026 TO: City of Eugene FROM: Kelly Sandow P.E. Sandow Engineering RE: Driveway Adjustment- Graham Place (ST 26-04) The following provides the evaluation for the requested adjustment to the driveway spacing standards for the proposed Tentative subdivision and residential construction located at 2610 Cal Young Road.The site is located at Tax Lot 1300 of Assessor’s Map 17-03-20-41. Figure 1 below illustrates the site location. The site plan is included as an attachment. Figure 1: Site location Tax Lot 1300 currently contains one existing single-family residence with one access to Cal Young Road near the northwest corner of the site. The applicant is proposing to partition the site into 9 residential lots and 1 stormwater lot (Tract A). The proposal includes relocating the driveway to the center of the site where all lots will share the single 20-foot-wide access. Re: Graham Place-Access Adjustment Date: 9.29.26 Page 2 SPACING STANDARDS As per EC 9.6735 (2), access connections shall comply with the access standards of EC 7.420. Cal Young Road is classified as a Minor Arterial. ¾EC 7.420(2)(b): the spacing standard for access connections is 150 feet on Minor Arterials. The proposed access connection is located approximately 144’ feet from the existing site access to Tax Lot 800 to the west and approximately 79’ from the existing access to Tax Lot 1100 to the east. Figure 2 below illustrates the access spacing. Figure 2: Access Spacing-Same Side The applicant is requesting an adjustment to EC 7.420(2)(b) for the access spacing. ¾EC 7.420(2)(e), access connections shall be aligned with connections across the street or have a minimum of 50 foot offset. The proposed access connection is not directly aligned with the access directly to the northwest, Re: Graham Place-Access Adjustment Date: 9.29.26 Page 3 and there is less than a 50-foot offset. There is more than a 50-foot offset from the driveway to the northeast. Figure 3 below illustrates the access locations. The applicant is requesting an adjustment to EC 7.420(2)(e) for the access offset between the proposed access and the access to the northwest. Figure 3: Access Spacing- Offset ADJUSTMENTREQUEST As per EC 9.6735(3), the standards of EC 7.420 can be adjusted as per EC 9.8030(28)(b). As per EC 9.8030(28): Public Access Required. The public access requirement of 9.6735(2) may be adjusted if the site developer demonstrates any of the following: (b) The proposed adjustments to the standards will provide safe ingress and egress to the development site, will not negatively impact the efficiency of the public right-of-way, and will not result in a hazard to the bicycle, pedestrian or vehicular traffic using the right-of-way. Re: Graham Place-Access Adjustment Date: 9.29.26 Page 4 Response to EC 9.8030(b): The following provides a safety evaluation of the proposed new access connection to Cal Young Road. The evaluation considers vehicle lines ofsight, left-turnconflicts, vehicle queuing, and pedestrian and bicycle conflicts. LINE OF SIGHT: The line of sight for drivers entering/exiting the proposed access, as well as the line of sight between the site access connections, was evaluated to determine if there are any potential safety issues. The line of sight for drivers entering and exiting the proposed access connection was evaluated following the AASHTO Intersection Sight Distance (ISD) and Stopping Sight Distance (SSD) methodology. The ISD is the length of roadway a driver exiting the driveway would need to see in either direction to enter the roadway and begin accelerating to the posted speed. The SSD is the length of roadway a driver on Cal Young Road needs to be able to see in order to perceive, react, and stop ahead of a driver entering or exiting the site access. The posted speed is 35 mph along Cal Young Road; as per the AASHTO Methodology, at 35 mph, the ISD is 390 feet, and the SSD is 250 feet. As per the AASHTO Methodology, the ISD is desirable to be met; at a minimum, the SSD is to be met. Figure 4 below provides an illustration of the available ISD and SSD at the site access point. As demonstrated in the Figure, the ISD and SSD requirements are met. The ISD to the east is limited by the traffic signal. However, the minimum standard of the SSD is met. Indicating that vehicles entering and exiting the site can do so safely. Additionally, there are no line-of-sight obstructions between the site access and the existing access connections to the east and west, and no line-of-sight obstructions between the site access and the existing access connections to the north. The turning movements to and from the site access can operate safely and efficiently. Re: Graham Place-Access Adjustment Date: 9.29.26 Page 5 Figure 4: Line of Sight at Site Access TURN CONFLICTS: The left turns into and out of the site were evaluated for potential turning conflicts for the driveways on the south side (same side) and north side (opposite side) of CalYoung Road. Cal Young Road has a center two-way left turn lane for left turns into the site driveway and adjacent driveways. The only movements that would compete for space in the two-way left turn lane are the driveway directly to the northeast. There is approximately 65 feet of space between these two access connections. There is sufficient space to allow for movements and queues in the left turn lane. Thereare no turnconflicts between the site driveway and the adjacent driveways on the same side of Cal Young Road. There is overlap between the left turns exiting the driveway to the northwest and the proposed new access. While there is overlap, the vehicles entering and exiting both accesses can clearly observe and make decisions on when it is safe to proceed with the turns. There is no safety issue with the proposed alignment. Re: Graham Place-Access Adjustment Date: 9.29.26 Page 6 Figure 5: Left Turn Paths South Side Cal Young Road Figure 6: Left Turn PathsNorth Side Cal Young Road Re: Graham Place-Access Adjustment Date: 9.29.26 Page 7 QUEUING: The access will serve 9 single family detached units or up to 36 attached units (4-plex on each lot). After completion, the site would generate 6 to 17 AM peak hour trips with 2 to 6 trips entering and 4 to 17 exiting trips, and 8 to 21 PM peak hour trips with 5 to 18 entering and 3 to 9 exiting trips. The maximum queue for vehicles entering the site will be a maximum of one vehicle/20 feet. A 20-foot left turn queue into the site will not obstruct vehicle movement into or out of adjacent accesses. The queuing for vehicles at this site will not create operational or safety concerns. PEDESTRIANAND BICYCLE MOVEMENTS Cal Young Road, along the south side, currently has curb-side sidewalks and bike lanes separated by on-street parking. The proposed access connection will be constructed as per the City of Eugene design criteria. The design does not pose a hazard to pedestrians or cyclists. FINDINGS As demonstrated within this evaluation, the proposed new access meets the criterion of EC 9.8030(28)(b) to allow an adjustment to the access spacing standards. The site access will provide safe ingress and egress to the development site, will not negatively impact the efficiency of the public right-of-way, and will not result in a hazard to the bicycle, pedestrian, or vehicular traffic using the right-of-way. Therefore, the adjustment review can be approved.