Loading...
HomeMy WebLinkAboutApplication Deemed Incomplete Atrium Building 99 West 10th Avenue Eugene, Oregon 97401 Phone: 541-682-5453 Fax: 541-682-5572 www.eugene-or.gov/planning October 26, 2026 Anthony Favreau The Favreau Group 3750 Norwich Avenue Eugene, OR 97408 RE: 3425 Coburg Rd (LV 26-04) Thank you for your application for a Lot Validation. Our Completeness Review process provides an opportunity to collaboratively address any items that are unclear, incomplete, or missing before your application is evaluated for consistency with the applicable approval criteria. Based on our review of the provided materials, your application has been deemed incomplete at this time. Enclosed are checklists identifying specific items that are incomplete. I look forward to working with you through the next steps of this process. Once you have reviewed the incomplete items listed in the enclosed checklist, please contact me if you have any questions. Sincerely, Brai Black Associate Planner (541) 682-5437 BBlack@Eugene-or.gov Lot Validation Completeness Review Form Page 1 of 2 LOT VALIDATION Completeness Review Form Planning Department Application File Name (#): LV 26-04 (Armitage Glen) Date: 10/26/2026 Applicant’s Name: Jeffrey and Colleen Tunnell Zoning: R-1 Representative’s Name: Tony Favreau, The Favreau Group, LLC Reviewed by: Brai Black, Associate Planner, BBlack@eugene-or.gov Phone: 541-682- General Comments: Written Statement Submitted Missing Incomplete N/A ☐ ☒ ☐ ☐ 1. Detailed written statement that describes how the request is eligible for the lot validation process under ORS 92.177and whether the lot validation is being requested under lot validation criteria ORS 92.176(1) or (2). ☐ ☒ ☐ ☐ 2. Indicate how the subject property is not a lawfully established unit of land. (e.g., documentation from County that property was created by deed after April 2, 1962, and prior to January 1, 2007, or a City of Eugene Legal Lot Verification letter indicating the lot is not legal under EC 9.0500). ☐ ☒ ☐ ☐ 3. Indicate whether a building permit or land use permit for the subject property is also being requested under ORS 92.176(3). ☐ ☐ ☒ ☐ 4. Is the applicant using the correct version of the code and the most updated version of the application form? Comments: 1. Lot Validation Criteria: It does not appear that a written statement addressing the Lot Validation criteria was included in the submitted application materials. Please submit a written statement that demonstrates how the Lot Validation request complies with the criteria at ORS 92.176 (1) or (2). 2. Written Statement: Please submit a detailed written statement that thoroughly explains why the subject property does not meet the Eugene Code definition (EC 9.0500) of a legal lot. It may be helpful to include additional deeds that show what the configuration of the subject property was prior to it being established in its current configuration (i.e., deeds that could help staff locate the underlying legal lot). 3. ORS 92.176(3): In addition to the items above, please confirm in your written statement whether a permit is currently being requested under ORS 92.176(3). 4. Lane Code: Please see Completeness Review Item #16 below. Site Plan Requirements Submitted Missing Incomplete N/A ☐ ☐ ☒ ☐ 5. A site plan, drawn to scale. A Tax Assessor's map may be used as a base for a site plan, provided the site plan is drawn to scale. (It is recommended that the site plan be prepared, stamped and signed by a registered professional land surveyor. ) ☐ ☐ ☒ ☐ 6. Date, north arrow, and standard engineer's scale shown on the plan. ☒ ☐ ☐ ☐ 7. Assessor's Map and Tax Lot numbers shown. ☒ ☐ ☐ ☐ 8. Dimensions and square footage of the area subject to the lot validation process. ☒ ☐ ☐ ☐ 9. Property lines that are subject to the lot validation process shown and clearly-labeled. ☒ ☐ ☐ ☐ 10. All adjacent streets, alleys, accessways, and driveways. Lot Validation Completeness Review Form Page 2 of 2 ☐ ☐ ☐ ☒ 11. Location of all existing structures, including those under pending building permits, shown and drawn to scale. ☒ ☐ ☐ ☐ 12. Width and locations of all existing public utility easements, and any other areas restricting use of the parcels, such as conservation areas, slope easements, access easements, etc., shown and labeled. (Recommended) Comments: 5. and 6. Scale: It appears that the numbers shown on the included scale may not align with the labeled lot dimensions (e.g., the distance shown as 240 feet in the scale nearly aligns with the 300-foot dimension labeled for the subject property’s northern boundary). Please ensure that the scale is accurate to the drawing. Supporting Analysis and Documents Submitted Missing Incomplete N/A ☒ ☐ ☐ ☐ 13. The Tax Assessor’s map for the subject property highlighting the area subject to the request (available at Lane County Assessment and Taxation). ☒ ☐ ☐ ☐ 14. The property description card(s) for the property (available at Lane County Assessment & Taxation). ☒ ☐ ☐ ☐ 15. A copy of the deed being relied upon for the lot validation process of ORS 92.177 and 92.176 (deeds are available at the Lane County Deeds & Records Office). ☐ ☐ ☒ ☐ 16. A list of applicable code sections describing lot size and dimension standards in effect when the subject property was created. ☐ ☐ ☐ ☒ 17. If the subject property is not annexed, and the request is for review under validation criterion ORS 92.176(2), a list of County building permits issued for the structure in question. ☐ ☐ ☒ ☒ 18. A preliminary title report submitted. (Recommended) Comments: 16. Lot Standards: While the provided application materials include four pages of the Lane Code in effect as of July 21, 1972, these pages do not appear to include a comprehensive list of the lot standards in effect in Lane County as of April 12, 1971. Based on the available information, it appears that the 1962 Lane County Revised Subdivision Ordinance contained the lot standards that were in effect from April 2, 1962, until February 10, 1972. Please submit a written statement that addresses the lot standards in said ordinance. 18. Preliminary Title Report: The legal description included in the provided preliminary title report (issued December 2025) does not appear to describe Tax Lot 02900 in its current configuration. While an updated title report is not necessary at this time, please note that an updated preliminary title report will likely be required at the time of Lot Validation plat submittal. Other requirements Submitted Missing Incomplete N/A ☐ ☐ ☐ ☒ 19. ☐ ☐ ☐ ☒ 20. ☐ ☐ ☐ ☒ 21. For Staff Use Only - Referral Information Yes No ☐ ☒ 22. Does the resulting change create or eliminate a split zone or split overlay zone? If Yes, please send referral to Thea Evans or Planning GIS Specialist