HomeMy WebLinkAboutPerformance AgreementPDF 25-01
SDR 25-02
MEMORANDUM OF FINAL PLANNED UNIT DEVELOPMENT AND STANDARDS REVIEW
PERFORMANCE AGREEMENT
KNOW ALL BY THESE PRESENTS: That Piculell Properties, LLC, hereinafter referred to as
"Developer," and the City of Eugene, a municipal corporation of the State of Oregon, hereinafter
referred to as "City," have entered into a Performance Agreement governing a Final Planned Unit
Development (PUD) (PDF 25-01) approval to create 38 residential lots, public and private streets,
and associated infrastructure improvements, as well as a Standards Review (SDR 25-02) for the
required extension of a public street (Randy Lane) through a Water Resource Conservation Area.
on Tax Lot 00200 of Assessor's Map 18-04-11-12. A legal description of the subject property is
attached as Exhibit "A" ("Legal Description").
The use and development of the above property is governed by the terms and conditions of that
Performance Agreement and the attached plans and specifications made by and between the
parties. The agreement is on record at the City Recorder's Office, and to which reference is hereby
made for all matters and things therein contained.
DEVELOPER:
X
BY: '>?' date:' '
Al LLihdstrom; Managing Member of
Piculell Properties, LLC
CITY OF EUGENE:
BY: date: 411
Jeff ep e , rincipal I nner for City of Eugene
Page 1 of 2
After recording, return to: City of Eugene City Recorder's Office 500 E 4th Ave, Suite 302 Eugene, OR 97401
STATE OF
(FIRST PARTY)
COUNTY OF
r
On this 1 +" day of , -� () before me, the undersigned, a notary public
in and for the said county and state, personally appeared the within -named Al Lundstrom,
Managing Member of Piculell Properties, LLC, who is known to me to be the identical individual
described herein and who executed the same freely and voluntarily.
Seal: IN TESTIMONY WHEREOF, I have hereunto set my hand
and seal the day and year last above written.
Alice BoMe
Notary Public
ri Mancopa County, Arizona
* `a; My Comm. Expires 04-24-27 Notary Publicki� 4��k
Commission No. 648385
My Commission Expires:
STATE OF OREGON
(SECOND PARTY)
COUNTY OF LANE
On this Vday of , C- , before me appeared Jeff Gepper, Principal
Planner, to me personally known, who being sworn and duly authorized to act on behalf of the
City of Eugene, acknowledged that this instrument is the free act and deed of the City of Eugene.
Seal: IN TESTIMONY WHEREOF, I have hereunto set my hand
and seal the day and year last above written.
Notary Public
OFFICIALPM ell
Robed Anthony samosa My Commission Expires: � � 0 6( 3 L�
Notay Pic • Or*W
Con wftWon No. 1066245
My Cornw*Wm Mwch 00, 2030
Page 2 of 2
PDF 25-01
SDR 25-02
FINAL PLANNED UNIT DEVELOPMENT AND STANDARDS REVIEW PERFORMANCE AGREEMENT:
THIS AGREEMENT is made by and between Piculell Properties, LLC, (Developer) and the City of
Eugene, a municipal corporation of the State of Oregon, (City).
RECITALS'
A. This Agreement concerns real property identified as Tax Lot 00200 of Assessor's Map 18-04-
11-12, more particularly described in the attached Exhibit "A" (Legal Description).
B. Developer has requested Final Planned Unit Development (PUD) approval to create 38
residential lots, public and private streets, and associated infrastructure improvements. The
developer also requested a Standards Review for the required extension of a public street
(Randy Lane) through a Water Resource Conservation Area.
C. Approval by the City of Developer's request is discretionary. City's approval is given in light
of and because of the particular characteristics of the development as evidenced by the
plans and information submitted. Development of the project in strict compliance with the
plans as submitted and approved is necessary to protect the public health, safety, and
welfare. Therefore, the public interest requires that the City obtain the Developer's promise
to develop in accordance with the plans as submitted and approved. The City does not
intend to bestow a benefit on individual third parties, but rather to protect the public
interest by obtaining compliance with the laws, ordinances, resolutions, rules, and
regulations governing the development of real property within the City.
D. On September 5, 2024, the Eugene Hearings Official denied the requested Tentative PUD
and Tentative Subdivision (File numbers: PDT 24-01/ST 24-03) to create 39 residential lots.
The Hearing Official's decision was appealed to the Eugene Planning Commission, who, on
February 18, 2025, reversed the Hearings Official's decision and approved the Tentative
PUD and Subdivision, subject to 27 conditions of approval. Subsequently, on March 12,
2026, the Eugene Planning Director approved a Final PUD and Standards Review (File
Numbers: PDF 25-01/SDR 25-02) request subject to 12 conditions of approval, which was
then appealed to the Eugene Hearings Official. On June 9, 2026, the Eugene Hearings
Official denied the appeal and affirmed the Planning Director's decision, amending one
condition and adding a thirteenth condition of approval. At the time the Final PUD was
approved all of the Tentative PUD conditions had been satisfied or were otherwise
conditioned as part of the Final PUD and Standards Review decision. The twenty seven (27)
conditions of approval from the Tentative PUD and Tentative Subdivision are included in
this agreement below. The Final PUD and Standards Review decision included thirteen (13)
conditions of approval, as noted below. The approved final plans are attached to the
agreement as Exhibit "B" and incorporated herein by reference.
E. This Performance Agreement is required by section 9.7025 of the Eugene Code (EQ.
Page 1 of 8
AGREEMENT
NOW, THEREFORE, as required by EC 9.7025 and in consideration for issuance of development
permits for the Property Developer agrees as follows:
1. Scope of Work: Developer agrees to all of the following:
a. All construction, development, improvement, landscaping, lighting and design,
or construction and continuing maintenance activities conducted on the
Property in connection with the City's Tentative PUD and Tentative Subdivision
(PDT 24-01/ST 24-03) decision dated February 18, 2025 and the City's decision
approving Developer's Final PUD and Standards Review application (PDF 25-
01/SDR 25-02) (Development Activities) will be conducted in compliance with
this Agreement and its attached exhibits and will conform to applicable
provisions and requirements of the City Code.
b. All Development Activities will be conducted under the supervision of a licensed
general contractor.
c. Development of the Property and any Development Activities will comply with
the approved final site plans included as Exhibit "B" to this Agreement.
d. Development of the Property and any Development Activities will comply with
the following conditions of approval included in the Eugene Planning
Commission's decision dated February 18, 2025 approving Developer's tentative
PUD and Tentative Subdivision:
i. (1) On the final PUD site plans and final plat, the applicant shall create an
access restriction strip along the westerly boundary line of Lot 15
abutting Hawkins Lane.
ii. (2) Prior to final plat approval, the applicant shall demonstrate approval
from the regional road naming group for alternate street names to
replace "Stonehedge Way" and "Stonehedge Court".
iii. (3) The private streets shall be labeled on the final plat and final PUD site
plans as "[Approved Street Name] - Private".
iv. (4) The structural design and construction inspection for the private
streets will remain the developer's responsibility. Certification by a
licensed engineer that a structural design meeting the applicable
standards will be required at the time of the site development permit for
the private street.
v. (5) Prior to final PUD and plat approval, the applicant shall submit Private
Joint Use Access and Utility Easement and Maintenance Agreement
(JAM). The JAM will include a description defining the area of the private
street and will also identify permitted improvements, construction
expectations, rights of usage and maintenance responsibilities for the
facilities in the street. The JAM will be recorded concurrent with and
cross- referenced on the final plat.
vi. (6) Provisions for a public emergency access easement within the private
street may be included in the proposed JAM which creates the private
Page 2 of 8
street, or alternatively, may be dedicated as a Public Emergency Access
Easement on a standard City form.
vii. (7) Prior to final plat approval, the applicant shall dedicate a 14- foot
Public Utility Easement or Public Wastewater Easement that will
encumber the proposed public wastewater system. The required
easement shall also be shown on revised final PUD plans.
viii. (8) The final PUD site plans shall include the following note: " No building,
structure, tree or other obstruction shall be placed or located on or in a
Public Utility Easement, consistent with EC 9. 6500(3)".
ix. (9) The final PUD site plans shall include the following note: "Compliance
with public improvement requirements shall be demonstrated in
accordance with EC 9. 6505 as part of the permitting process for
development within the PUD including Privately Engineered Public
Improvement (PEPI) Permits, Site Development Permits and Building
Permits."
x. (10) The final PUD site plans shall include the following note: "A Privately
Engineered Public Improvement (PEPI) permit shall be issued for the
construction of public improvements prior to development."
xi. (11) Prior to final plat approval, the applicant shall provide
documentation that EWEB has received a financial guarantee, ensuring
water will be provided to each lot in the plat.
xii. (12) Prior to final PUD approval, the applicant shall submit an updated
site plan that depicts wastewater service to Lot 38. Alternatively, the
applicant may combine Lots 37 and 38 to demonstrate compliance with
the requirement for wastewater service.
xiii. (13) The applicant shall submit an Irrevocable Petition for public
improvements in Hawkins Lane to include sidewalks.
xiv. (14) The applicant shall submit an Irrevocable Petition for public
improvements in Randy Lane existing portion between Hawkins Lane and
Blacktail Drive) to include setback sidewalks and street trees.
xv. (15) The proposed Joint Access Easements, which are subject to City
review and approval prior to recording with the final plat, shall be cross-
referenced on the plat and be accompanied by a maintenance agreement
for each shared driveway, which addresses the rights and responsibilities
of each parcel relative to each shared driveway.
xvi. (16) The location of proposed Joint Access Easements shall also be clearly
shown and labeled as such on final PUD plans.
xvii. (17) Prior to final PUD approval, the applicant shall update their
stormwater memo to show how the proposed shared driveways will
satisfy EC 9.6792(3)(c•).
xviii. (18) Prior to final PUD approval, the applicant shall obtain Type I I
Standards Review approval for the proposed public street extension of
Randy Lane and any other utility crossings or other allowed
improvements within the protected /WR conservation area, subject to
the applicable standards at EC 9.4900-9.4980.
Page 3 of 8
xix. (19) All future building permits for Lots 30 through 35 shall depict the
Goal 5 resource and its 40-foot setback from top of bank and shall
include site plans showing the location of protective fencing subject to
the applicable standards at EC 9.4920- 9.4930.
xx. (20) The final PUD plans shall include the following note: "Compliance
with all applicable development standards, special use limitations, and
other general development standards for single -unit or middle housing
residential dwelling types shall be demonstrated at the time of future
building permit on each individual lot."
xxi. (21) The final PUD plans shall be revised to remove any references to
middle housing lots to be created on land above 901- foot elevation. The
final PUD plans shall also include a note stating that: "No development of
middle housing, single -unit dwellings, or any other development,
including but not limited to land divisions, may occur on any land above
901-feet in elevation."
xxii. (22) The final PUD plans shall include the following note: "No site
alteration is allowed prior to final PUD approval. This prohibition includes
site grading and the removal of trees and other vegetation, as well as any
impacts to wetlands and the protected stream on the subject property
including changes to the existing drainage pattern. Any such alterations
shall only be allowed subject to permit review and approval, and erosion
control measures as required for the proposed work."
xxiii. (23) Prior to final PUD approval, the applicant shall submit an updated
site plan depicting that portion of Randy Lane now shown as a proposed
private street on Sheet L2.0 of the applicant's site plans, as a public street
instead. The revised site plan shall show that portion of Randy Lane will
be designed and constructed to City standards as a public street meeting
the standards for an Access Lane in accordance with EC 9.6505(3)(a) and
the Local Street Design Standards of the Design Standards and Guidelines
for Eugene Streets, Sidewalks, Bikeway and Accessways, as well as the
City' s Public Improvement Design Standards (PIDS) Manual.
xxiv. (24) On the final plat, the applicant shall dedicate a 40-foot-wide right-
of-way extending the public right- of -way for Randy Lane from its existing
intersection with Blacktail Drive westerly (toward the western terminus
of Randy Lane) to the proposed terminus of Randy Lane as currently
depicted on Sheet L2.0 of the applicant's site plans. The right- of -way
shall also encompass the required turnaround area at the end of the
street and include a reserve strip in accordance with EC 9.6840(1).
xxv. (25) Prior to final PUD approval, the applicant shall submit an updated
site plan that depicts that Lot 38 will have frontage on a public street or
having access to a public street over a private street or proposed private
access easement. Alternatively, the applicant may combine Lots 37 and
38 to demonstrate compliance with the requirement for public street
access.
Page 4 of 8
xxvi. (26) Prior to final PUD approval, the applicant shall submit updated
application materials that demonstrate compliance with EC 9.6796.
xxvii. (27) Prior to final PUD approval, the applicant shall submit an updated
site plan that includes the following notes:
1. The approved stormwater system shall be designed and sized by a
civil engineer for the full build -out of the project including 20% of
each lot assumed to be impervious surface area. If a lot is
proposed to be developed with more than 20% impervious
surface area, then additional on -site detention is required.
Stormwater runoff from private facilities may also be combined
with runoff from the public street (Randy Lane), so long as the
public detention system is sized and designed in accordance with
applicable Public Improvement Design Standards."
2. In addition to the on -site detention requirements noted above,
all subsequent site development permits, building permits, and
Privately Engineered Public Improvement (PEPI) permits for
development of the PUD shall demonstrate compliance with
applicable stormwater standards at EC 9.6791 through 9.6797 and
requirements of the Stormwater Management Manual.
e. Development of the Property and any Development Activities will comply with
the following conditions of approval included in the Eugene Hearings Official
decision dated June 9, 2026, approving Developer's Final PUD and Standards
Review:
i. (1) The applicant shall obtain an Erosion Prevention permit prior to the
initiation of any development activities in the Conservation Setback as
shown on the site plans.
ii. (2) Prior to final site plan approval, the applicant shall submit a revised
final site plan that identifies the Conservation Area in between the
southern property line and the southern edge of the road and sidewalk.
The revised site plans shall also show replanting details consistent with
the requirement at EC 9.4980(2)(c).
iii. (3) Prior to site plan approval, the applicant shall submit a revised final
site plan that includes tree and plant species that are selected from the
Native and Non -Native Plant List, Exhibit F to Ordinance No. 20351.
iv. (4) Prior to Final PUD approval, the following note shall be added to the
final site plans: "Any disturbed -areas within the Conservation Setback
shall be replanted within 90 days of any clearing or vegetation removal
activities, unless otherwise approved by the Eugene Planning Director."
v. (5) Prior to final site plan approval, the applicant shall submit a revised
site plan that shows staging area(s) for heavy machinery. Alternatively,
the applicant may include a note on the final site plan stating, "No staging
areas for heavy equipment will be located within a Conservation Area."
vi. (6) Prior to final site plan approval, the applicant shall submit a revised
site plan that shows the location of access for and use of heavy
Page 5 of 8
machinery within the extent of the Conservation Area impacted by the
construction of the road.
vii. (7) Prior to final site plan approval, the following note shall be added to
the final site plans: "Heavy machinery may only be used in the /WR
conservation areas between June 15 and September 30, unless otherwise
approved by the planning director. Heavy machinery may only be used in
the staging area, access area and the construction impact area."
viii. (8) Prior to final site plan approval, the applicant shall add a note to the
final site plans that states, "Petroleum products, chemicals, or other
deleterious materials used in the construction process shall not be
allowed to enter a stream or wetland that is within a /WR conservation
area."
ix. (9) Prior to final plat approval, the applicant shall add a note to the final
site plans that states, "All lighting within the /WR Conservation Area shall
meet the lighting standards under EC 9.4980(8)(b) and EC 9.4980(8)(c)."
x. (10) Prior to final site plan approval, the applicant shall submit a revised
Private Joint Use Access and Utility Easement and Maintenance
Agreement (JAM) that includes referencing Tambour Lane and Tambour
Court as part of Lot A, and the Permitted Improvements and Construction
Expectations section shall be revised to either define a blanket PUE with a
private utility corridor or a blanket private utility easement with a PUE
corridor.
A. (11) Prior to final site plan approval, the final site plans shall be revised
to either define a blanket PUE with a private utility corridor or a blanket
private utility easement with a PUE corridor.
xii. (12) Prior to final site plan approval, the final plans shall be revised so
that all public stormwater facilities are located in either public right-of-
way, public utility easements, or public stormwater easements in
compliance with EC 9.6796.
xiii. (13) Prior to final site plan approval, the applicant shall submit an
updated site plan that includes a profile view of Tambour Court. The
updated profile view of Tambour Court shall comply with EC 9.6875 and
not exceed 20% slope.
2. Signs: All permanent signs which may be erected hereafter and which are associated
with the Development Activities shall conform to the applicable provisions of the
Eugene Code.
3. Financing: Developer agrees, upon request of the City, to provide to the Building
Division the name and address of Developer, together with the designation of a
particular responsible official and any lending institution participating in the
Development Activities, contemporaneously with any request to issue any building
permit associated with the Development Activities.
4. Amendments and Modifications: No portion of this Agreement or any of its attached
exhibits may be amended or modified without the written consent of the Developer and
the Planning Director or the Planning Director's designee.
Page 6 of 8
5. Breach: Developer understands and agrees that Developer's failure to comply with any
of the terms of this Agreement shall constitute a breach of this Agreement, and upon
breach of this Agreement City may refuse to issue or may revoke development and/or
occupancy permits associated with the Development Activities.
6. Liquidated Damages: As a separate remedy apart from any remedy otherwise allowed
under this Agreement or otherwise allowed under Oregon law, the City may, within its
sole discretion, determine to seek damages from the Developer for a breach of this
Agreement. If the City elects to pursue this remedy, it shall first notify the Developer
with reasonable particularity of the nature of the breach and shall afford the Developer
a reasonable time within which to cure. It is mutually understood and agreed between
the parties that damages in the event of Developer's breach will be difficult to ascertain
with reasonable certainty because one of City's primary interest in this Agreement is the
protection of the public health, safety, and welfare of its citizens -- a measure that is
inherently difficult to calculate. The amount of City's damages being difficult to
ascertain, it is thus mutually agreed that damages shall be computed on the basis of
$250 per day for each day each breach continues. It is further recognized and agreed
between the parties that the damages of $250 per day are in the nature of liquidated
damages and are not construed as a penalty.
7. Specific Performance: Developer understands and agrees that in addition to and not in
lieu of any other remedies provided by this Agreement and applicable state and local
laws, the City may, within its sole discretion, seek specific performance by way of suit in
equity against any of the parties to this Agreement in the Circuit Court of the State of
Oregon for Lane County.
8. Attorney Fees: In any suit or action brought upon this Agreement, the prevailing party
shall be entitled to a reasonable attorney's fee to be assessed by the trial or appellate
court as the case may be.
9. Successors in Interest: This Agreement is binding upon the heirs, executors,
administrators, and assigns of both parties and is a condition and covenant running with
the land and binding upon the above -described areas of real property. The parties shall
execute a memorandum of this Agreement suitable for recording with the Lane County
Deeds and Records Office. City shall record the memorandum and provide Developer
with a copy of the recorded document.
THIS AGREEMENT is NOT authorization to begin operation or to begin construction. An
application for authorization to begin operation or to begin construction (a building permit)
may be made at the City Building Division.
DEVELOPER:
CITY OF EUGENE:
Date: 116 Date:
By: Al Lundstrom, Managing Member of B . eff Gepper, Principal Planner for City of
Piculell Properties, LLC Eugene
Page 7 of 8
STATE OF
COUNTY OF
On this day of . before me, the undersigned, a notary public
in and for the said county and state, personally appeared the within -named Al Lundstrom,
Managing Member of Piculell Properties, LLC, who is known to me to be the identical individual
described herein and who executed the same freely and voluntarily.
Seal:
- V .' V� oq"c' -,
�' Notary Public Signature
Alice Borge
Notary Public
Maricopa County, Arizona /
My Comm. Expires04-24-27 My Commission Expires:
Commission No. 648385
Page 8 of 8
MEMORANDUM OF AUTHORIZATION - INTERNAL USE
Upon receipt of this authorization form, the City Recorder's Office will approve the document
for recording. For time -sensitive requests or questions, please contact the City Recorder's
Office at record ing@eugene-or.gov.
• To obtain written approval, this completed authorization form must be presented
by City staff to the City Recorder's Office via interoffice mail or in person
appointment.
• For in person appointments, it is required that you contact the City Recorder's Office
recordingeugene-or.gov at least 48 hours in advance. To avoid delays, please
contact the City Recorder's Office as soon as possible to make necessary
arrangements.
• PLEASE NOTE THAT AN ORIGINAL MEMORANDUM OF AUTHORIZATION IS
REQURIED to submit City documents for recording approval. The original memo will
be retained by the City Recorder's Office.
• All fields of this Memo of Authorization must be completed prior to approval, if any fields
are left blank the documents will be returned to staff to complete and resubmit.
Who will submit this recording to Lane County Deeds & Records [Check one option]:
® City Recorder's Office — CRO will send to Lane County Deeds & Records
❑ City of Eugene Staff — CRO will return to staff
❑ External Member of the Public — CRO will return to staff
CITY OF EUGENE RECORDING AUTHORIZATION
To the City Recorder's Office:
The attached Performance Agreement PDF 25-01 / SDR 25-02 has been
reviewed by a City of Eugene staff person and is accepted for the City of Eugene.
Please approve this document for recording.
City Staff Signature:--e----
Printed Name: ROBERT SARSOZA Date: 07/02/26
Dept/Div: PDD/Planning
Account Code for Recording Charge:
011-4314-302-61892
(If being recorded directly by a member of the public, enter N/A)
THIS FORM TO BE RETAINED BY THE CITY RECORDER'S OFFICE
Planning
4-Apl*-kh
AVE STE 290
EUGENE, OR 97402
July 2, 2026
CAROL SCHIRMER
SCHIRMER CONSULTING, LLC
PO BOX 10424
EUGENE, OR 97440
AL LUNDSTORM
PICULELL PROPERTIES LLC
3104 E. CAMELBACK ROAD #116
PHOENIX, AZ 85016
PERFORMANCE AGREEMENT FOR:
Braewood Hills 3rd Addition (PDF 25-01 / SDR 25-02)
Enclosed for your records is a fully executed copy of your agreement and approved plans.
Copies of the agreement and approved plans are on file with the Eugene Building Division for
your convenience when applying for building permits related to this project.
For more information regarding the building permit process, please contact staff at the Permit
and Information Center between 12 p.m and 4 p.m. at the address listed above or by telephone
at (541) 682-5086.
If you have questions regarding this agreement, please contact Nick Gioello at
NGioello@eugene-or.gov or (541) 682-5453.
Sincerely,
City of Eugene Planning Staff
City of Eugene • 99 W. 10th Ave Suite 290 . Eugene, OR 97401 • (541) 682-5377 • (541) 682-5572 (Fax)
www.eugene-or.gov/planning
/46
ATTACHMENT y
Legal Description 4
A parcel of land being a portion of the Northeast quarter of Section 11, Township 18 South,
Range 4 West of the Willamette Meridian, being more particularly described as follows:
Commencing at a found 1 inch iron rod marking the North quarter corner of said Section 11;
thence following along the North -South midsection line of said Section 11, South 00' 08' 13"
West, 389.75 feet; thence leaving said North -South midsection line, South 630 25' 30" East,
16.65 feet; thence South 890 52' 31" East 12.30 feet to a point of curvature; thence following
along the arc of a 127.50 foot radius curve to the right, through a central angle of 480 20' 30",
an arc distance of 107.57 feet, (the long chord of which bears South 65' 42' 16" East, 104.41
feet) to a point of tangency; thence South 410 32' 01" East 410.17 feet; thence South 480 27'
59" West 55.00 feet; thence South 410 32' 01" East, 81.72 feet to a point of curvature; thence
following along the arc of a curve to the right, through a central angle of 20' 10' 42", an arc
distance of 25.53 feet (the long chord of which bears South 310 26' 39" East, 25.40 feet) to a
point of tangency; thence South 210 21' 18" East, 25.19 feet to a point of curvature; thence
following along the arc of a curve to the left, through a central angle of 670 38' 49", an arc
distance of 321.73 feet (the long chord of which bears South 550 10' 43" East, 303.37 feet) to a
point of tangency; thence South 890 00' 07" East, 203.98 feet to a point of curvature; thence
following along the arc of a curve to the right, through a central angle of 210 58' 47", an arc
distance of 27.81 feet (the long chord of which bears South 780 00' 43" East, 27.64 feet) to a
point of tangency; thence South 670 01' 20" East, 167.47 feet, to a point of curvature; thence
following along a curve to the left, through a central angle of 360 25' 18', an arc distance of
81.05 feet (the long chord of which bears South 850 13' 59" East, 79.69 feet) to a point of
tangency; thence North 760 33' 22" East, 38.06 feet, to a point of curvature; thence following
along the arc of a curve to the right, through a central angle of 140 16' 02", an arc distance of
18.05 feet (the long chord of which bears North 830 41' 22" East, 18.01 feet) to a point of
tangency; thence South 890 12' 39" East, 145.09 feet to a point on the West line of the
REPLAT OF LOT 64, BRAEWOOD HILLS 2ND ADDITION P.U.D., as platted and recorded in
File 75, Slides 1125 and 1126, Lane County Oregon Plat Records, Eugene, Lane County,
Oregon; thence following along the exterior boundary of said Plat, North 030 01' 16" West,
146.50 feet; thence North 550 06' 19" West, 84.78 feet to the most Southerly corner of Lot 9,
BRAEWOOD NORTH P.U.D. as platted and recorded in File 75, Slides 384 through 386, Lane
County Oregon Plat Records, Eugene, Lane County, Oregon; thence following along the
exterior boundary of said Plat, North 63' 13' 20" West, 272.85 feet; thence North 680 10' 07"
West, 233.91 feet; North 350 41' 55" West, 168.86 feet; thence North 180 54' 40" West, 168.76
feet; thence North 050 14' 11" West, 104.98 feet; thence North, 324.76 feet to a point on the
North line of Section 11; thence following said North line, North 890 33' 50" West, 641.67 feet
to the point of beginning, all in said Section 11, Township 18 South, Range 4 West of the
Willamette Meridian, Eugene, Lane County, Oregon.
SCHIRMER CONSULTING, LLC
Landscape Architecture + Land Use Planning
PO Box 10424
Eugene, Oregon 97440
Phone:541.234.5108
SCHIRMER CONSULTING, LLC., LANDSCAPE ARCHITECTURE
AND LAND USE PLANNING EXPRESSLY RESERVE ITS COMMON
LAW COPYRIGHT AND OTHER PROPERTY RIGHTS IN THESE
PLANS. THESE PLANS ARE NOT TO BE REPRODUCED,
CHANGED, OR COPIED IN ANY FORM OR MANNER
WHATSOEVER, NOR ARE THEY TO BE ASSIGNED TO A THIRD
PARTY WITHOUT FIRST OBTAINING THE WRITTEN PERMISSION
AND CONSENT OF SCHIRMER CONSULTING, LLC.
IN THE EVENT OF UNAUTHORIZED REUSE OF THESE PLANS BY
A THIRD PARTY, THE THIRD PARTY SHALL HOLD SCHIRMER
CONSULTING, LLC. HARMLESS.
PROJECT NAME
BRAEWOOD HILLS THIRD
ADDITION PUD
STANDARDS REVIEW
Phases 5 and 6
z
rJ 0
� I
aNi- o�L
a.
REVISIONS
# Date Description
1 6.26.26 Performance Agreement
Scale: 1 " = 60' - 0"
0 30 60 120
PROJECT NAME Braewood Hills Third Add. PUE
PROJECT ADDRESS Randy Lane
PROJECTADDRESS Eugene, OR
PHASE
Standards Review
DATE
9.5.25
DRAWN BY CHECKED BY
ces ces
SHEET TITLE
COVER SHEET
SHEET NUMBER
ST 1m0
1
•
AROL E: SCHIRMER
0 ' GON
1-18-� ,,
SCHIRMER CONSULTING, LLC
Landscape Architecture + Land Use Planning
PO Box 10424
Eugene, Oregon 97440
Phone:541.234.5108
SCHIRMER CONSULTING, LLC., LANDSCAPE ARCHITECTURE
AND LAND USE PLANNING EXPRESSLY RESERVE ITS COMMON
LAW COPYRIGHT AND OTHER PROPERTY RIGHTS IN THESE
PLANS. THESE PLANS ARE NOT TO BE REPRODUCED,
CHANGED, OR COPIED IN ANY FORM OR MANNER
WHATSOEVER, NOR ARE THEY TO BE ASSIGNED TO A THIRD
PARTY WITHOUT FIRST OBTAINING THE WRITTEN PERMISSION
AND CONSENT OF SCHIRMER CONSULTING, LLC.
IN THE EVENT OF UNAUTHORIZED REUSE OF THESE PLANS BY
A THIRD PARTY, THE THIRD PARTY SHALL HOLD SCHIRMER
CONSULTING, LLC. HARMLESS.
PROJECT NAME:
BRAEWOOD HILLS THIRD
ADDITION PUD
STANDARDS REVIEW
Phases 5 and 6
swam
Uj
di
_J
LL
REVISIONS
# Date Description
1 6.24.26 Performance Agreement
N
Scale: 1" = 60' - 0"
0 30 60 120
PROJECT NAME Braewood Hills Third Add. PUD
Phases 5 and 6
PROJECT ADDRESS Randy Lane
PROJECT ADDRESS Eugene, OR
PHASE
Standards Review
DATE
9.5.25
DRAWN BY CHECKED BY
ces ces
SHEET TITLE
SITE PLAN
SHEET NUMBER
ST2mO
1
A
ARO :- SCHIRMER
C , GON
�*y
Y PROTECTIVE FENCING
INSTALL THIS PORTION OF FENCE PRIOR TO CONSTRUCTION ACTIVITIES
m \ CONSERVATION SETBACK AREA OF DISTURBANCE. APPROXIMATELY 1,020 SF
\ \ \ TYPICAL GRADING (FILL) FOR ROAD CONSTRUCTION
CONSERVATION
\ PROTECTIVE FENCING SETBACK AREA
k � • HIGHLY VISIBLE, ORANGE PLASTIC, WEBBED
FENCING 4-FEET HIGH.
\0 ATTACH SECURELY TO METAL FENCE POSTS
DRIVEN INTO THE GROUND AT 10 FOOT
EXISTING OFF SITE T E' Z \ ,�
' INTERVALS.
\ FENCING TO BE MAINTAINED ADEQUATELY UNTIL
_
PLANTING IS ESTABLISHED.
INSTALL EAST PORTION OF FENCE PRIOR TO �_ ----
CONSTRUCTION ACTIVITIES ____----
INSTALL WEST PORTION OF FENCE AFTER _-'-
PLANTING IS COMPLETE.,00
Y
00
-
-¢
PROPOSED PUBLIC ROAD O EXISTING 9 NO -NATIVE "
PEAR TREE TO BE
t REMOVED f.
PROPOSED WATER LINE / r
EXISTING 12" STORM EXISTING WETLANDS.
` DRAIN LINE TO REMAIN SEE ATTACHED
DELINEATION
\\ / '® REPORT.
00
PROPOSED WASTEWATER LINE
PROJECT INFORMATION
MAP: 18 04 11 12
TAX LOT 200
ZONING R-1 / WR / PD
AREA 15.47 ACRES (13.57 ACRES NET)
PLANT LIST
QTY. 11130TAINICAL NAME ICOMMON NAME
ISIZE ICOMMENTS
TREES
4
Pinus Ponderosa 'Willamette Valley' 7r4a_Mette
Valley Ponderosa Pine
5' - 6'
Matched. Evenly branched.
SEED
48 grams
31 grams
3 grams
Deschampsia cespitosa
Hordeum brachyantherum
Koeleria cristata
Tufted Hairgrass
Meadow Barley
Prairie June Grass
seed
seed
seed
8 grams per 100 sf
8 grams per 100 sf
1 gram per 100 sf
\ EXISTING 11" The dominant grass species is Schedonorus arundinaceus, a non-native
' NON-NATIVE PEAR TREE hay grass.
PROPOSED 4' WIDE SIDEWALK r \r TO BE REMOVED Rubus armenlacus and DI sacus fullonum dominate the area surrounding
P g
the upslope stormwater pipe. Minor components (trace) include Sidalcea
® CONSERVATION
asprella ssp. Virgata (native), Camassia leichtlinii (native), Juncus patens,
SETBACK AREA
Allium amplectens (native).
m o \ \ \ \
XISTING 1' \ \ REQUIRED SETBACK.
NON-NATIVE PEAR TREE \ \ \
TO BE REMOVED \ PROTECTIVE FENCING
\ \ INSTALL THIS PORTION OF FENCE PRIOR
I \ \ TO CONSTRUCTION ACTIVITIES
EXISTING 12" STORM \ \ PROPOSED STORMWATER
DRAIN LINE TO REMAIN \ \ \ TREATMENT FACILITY AND
\ \ \ STORMWATER PIPE APPROVED
- \ THROUGH PEPI PERMIT.
\ CONSERVATION AREA: Heavy Machinery Access n \� y y s and use
TYPICAL GRADING \
(FILL) FOR ROAD
CONSTRUCTION j
i "
SITE PLAN F 00 9z
ACCESS FOR HEAVY MACHINERY `7-
\ OE
(1), PONDEROSA PINE (WILLAMETTE VALLEY)
m , > TUFTED HAIRGRASS
240 sf 6�
\0 Broadcast seed at rate of 8 grams per 100 sf
\ \- O PONDEROSA PINE (WILLAMETTE VALLEY)
m \ \ \ HEAVY MACHINERY USE AREA DEFINED BY
40 FEET FROM TOP OF BANK
z \ r JJ _ 40 FEET FROM EXTERIOR OF EXISTING
STORMWATER PIPE.
\ _
SCALE: 1" = 20' - 0"
F \
(1) PONDEROSA PINE (WILLAMETTE VALLEY) NOTES
00 \ 1. ANY DISTURBED AREAS WITHIN THE CONSERVATION SETBACK SHALL BE REPLANTED WITHIN
90 DAYS OF ANY CLEARING OR VEGETATION REMOVAL ACTIVITIES, UNLESS OTHERWISE
APPROVED THE THE EUGENE PLANNING DIRECTOR.
MEADOW BARLEY
\ 390 sf 2. NO STAGING AREAS FOR HEAVY EQUIPMENT WILL BE LOCATED WITHIN THE CONSERVATION
m
\ • Broadcast seed at rate of 8 grams per 100 sf AREA.
(1) PONDEROSA PINE (WILLAMETTE VALLEY) 3. HEAVY MACHINERY MAY ONLY BE USED IN THE /WR CONSERVATION AREAS BETWEEN JUNE 15
AND SEPTEMBER 30 AND WILL NOT BE USED OUTSIDE OF THE AREA SHOWN ON THIS SITE
PLAN FOR STAGING AND ACCESS TO THE CONSTRUCTION IMPACT AREA.
TUFTED HAIRGRASS
• 325 sf �/ '� *\ 4. PETROLEUM PRODUCTS, CHEMICALS, OR OTHER DELETERIOUS MATERIALS USED IN THE
• Broadcast seed at rate of 8 grams per 100 sf / " \ CONSTRUCTION PROCESS SHALL NOT BE ALLOWED TO ENTER A STREAM OR WETLAND
WITHIN A /WR CONSERVATION AREA.
5. ALL LIGHTING WITHIN THE MR CONSERVATION AREA SHALL MEET THE LIGHTING STANDARDS
/
® \ UNDER EC 9.4980(8)(b) AND EC 9.4980(8)(c).
UNE GRASS
\ • 225 sf
\ Broadcast seed at rate of 1 gram per 100 sf
IRRIGATION
\ \ STORMWATER TREATMENT FACILITY
\ \0 165 sf
F \0 This portion of Goal 5 area is now a required
Stormwater Treatment Facility. 1. IRRIGATION SYSTEM TO BE INSTALLED IN ALL NEW REQUIRED PLANTING AREAS.
` \\ See attached Planting Plans for PEPI Permit.
2. IRRIGATION SYSTEM TO BE AUTOMATIC ELECTRIC SOLENOID CONTROLLED TEMPORARY ABOVE
F \ GROUND SPRINKLER SYSTEM WITH PVC PIPE AND FITTINGS, BACKFLOW PREVENTION DEVICE,
\ AUTOMATIC CONTROLLER (IRRITROL, RAINBIRD OR APPROVED), ELECTRIC REMOTE CONTROL
1 �\ ;' \ P� ) VALVES (RAINBIRD PEB-PRS SERIES OR APPROVED), WITH POP-UP SPRAY SPRINKLERS
(RAINBIRD 1800 PRS SERIES OR APPROVED). ALL VALVES TO BE LOCATED AS TEMPORARY IN A
VALVE BOX (CARSON OR APPROVED).
\ -- 3. REMOVE IRRIGATION AFTER NEW PLANTINGS ARE ESTABLISHED.
PLANTING PLAN F \\\ro
LEGEND
s s EXISTING WASTE WATER LINE PROPOSED CONTOURS
sa so EXISTING STORM SEWER LINE
w 8 DI EXISTING DEIONIZED WATER LINE
PROPOSED STORM SEWER LINE EXISTING CONTOURS
- PROPOSED WASTEWATER LINE
PROPOSED WATER LINE
----'----- PROPOSED PROPERTY LINE EXISTING WETLANDS
PROPOSED EASEMENT TO REMAIN
VISION CLEARANCE TRIANGLES
i
WETLAND BOUNDARY
EXISTING FIRE HYDRANT
tPROPOSED FIRE HYDRANT
PROPOSED FIRE TURNAROUND
EXISTING TREE
PROPOSED TREE
STORMWATER TREATMENT FACILITY
PROPOSED RESTORATION
STORMWATER TREATMENT FACILITY PLANTING
PROPOSED RESTORATION (SEED)
PROPOSED RESTORATION (SEED)
PROTECTIVE FENCING
TREE PLANTING DETAIL
TREE TIES
Grow Straight
TREE STAKE
Stake 3 sides
2" x 2" x 24"
hardwood stal
PLANT SAUC
Form 3" rim
UNDISTURBED
OR COMPACTED
2X diameter
of rootball
NOTE:
REMOVE TREE TIES AT ONE YEAR WARRANTEE.
CONIFEROUS TREE PLANTING DETAIL
7
limum
a.
r thoroughly
event settling
N.T.S.
SCHIRMER CONSULTING, LLC
Landscape Architecture + Land Use Planning
PO Box 10424
Eugene, Oregon 97440
Phone:541.234.5108
SCHIRMER CONSULTING, LLC., LANDSCAPE ARCHITECTURE
AND LAND USE PLANNING EXPRESSLY RESERVE ITS COMMON
LAW COPYRIGHT AND OTHER PROPERTY RIGHTS IN THESE
PLANS. THESE PLANS ARE NOT TO BE REPRODUCED,
CHANGED, OR COPIED IN ANY FORM OR MANNER
WHATSOEVER, NOR ARE THEY TO BE ASSIGNED TO A THIRD
PARTY WITHOUT FIRST OBTAINING THE WRITTEN PERMISSION
AND CONSENT OF SCHIRMER CONSULTING, LLC.
IN THE EVENT OF UNAUTHORIZED REUSE OF THESE PLANS BY
A THIRD PARTY, THE THIRD PARTY SHALL HOLD SCHIRMER
CONSULTING, LLC. HARMLESS.
PROJECT NAME:
BRAEWOOD HILLS THIRD
ADDITION PUD
STANDARDS REVIEW
Phases 5 and 6
r- u.
� O
N
N M
0 d
�..b 4_ h
REVISIONS
# Date Description
1 6.24.26 Performance Agreement
N
Scale: 1" = 10' - 0"
0 5 10 20
PROJECT NAME Braewood Hills Third Add. PUD
Phases 5 and 6
PROJECTADDRESS Randy Lane
PROJECTADDRESS Eugene, OR
PHASE
Standards Review
DATE
9.5.25
DRAWN BY CHECKED BY
ces ces
SHEET TITLE
SITE PLAN and
PLANTING PLAN
SHEET NUMBER
ST3mO
-Wo
AROL E. SCHIRMER
a ,GON
�SY
SHEET INDEX
PHASES 5 and 6 01
'b'RA WOOD HILLS THIRD ADDITION UD
RANDY LANE
Wo
Z�
J
U
N -a
Z o
L
yY O
in
a
Xz
1-1.0
COVER SHEET
L2.0
SITE PLAN
C1.0
WATER AND SEWER PLAN
C2.0
STORMWATER DRAINAGE PLAN
C3.0
GRADING PLAN
I DESIGN TEAM MEMBERS
OWNER/APPLICANT
PICULELL PROPERTIES, LLC
3104 E. CAMELBACK ROAD #6
PHOENIX, AZ 85016
602.418.3229
CONTACT: AI Lundstrom
al@katchmor.com
PROJECT COORDINATOR/
LANDSCAPE ARCHITECT
SCHIRMER CONSULTING, LLC
PO BOX 10424
EUGENE, OREGON 97440
541.234.5108
CONTACT: Carol Schirmer
schirmer@schirmerconsulting.com
CIVIL ENGINEER
KPFF CONSULTING ENGINEERS
800 WILLAMETTE STREET
SUITE 400
EUGENE, OREGON 97401
541.684.4902
CONTACT: ANNA BACKUS, P.E.
anna.backus@kpff.com
SCHIRMER CONSULTING, LLC
Landscape Architecture + Land Use Planning
PO Box 10424
Eugene, Oregon 97440
Phow 541.234-5108
SCHIRMER CONSULTING, LLC., LANDSCAPE ARCHITECTURE
AND LAND USE PLANNING EXPRESSLY RESERVE ITS COMMON
LAW COPYRIGHT AND OTHER PROPERTY RIGHTS IN THESE
PLANS. THESE PLANS ARE NOT TO BE REPRODUCED,
CHANGED, OR COPIED IN ANY FORM OR MANNER
WHATSOEVER, NOR ARE THEY TO BE ASSIGNED TO A THIRD
PARTY WITHOUT FIRST OBTAINING THE WRITTEN PERMISSION
AND CONSENT OF SCHIRMER CONSULTING, LLC.
IN THE EVENT OF UNAUTHORIZED REUSE OF THESE PLANS BY
A THIRD PARTY, THE THIRD PARTY SHALL HOLD SCHIRMER
CONSULTING, LLC, HARMLESS.
PROJECT NAME:
BRAEWOOD HILLS THIRD
ADDITION PUD FINAL
Phases 5 and 6
SURVEYOR I I REVISIONS
KPFF
111 SW FIFTH AVENUE
SUITE 2400
PORTLAND. OREGON 97204
503.227.3251
CONTACT TROY TETSUKA. PLS
troy.tetsuka@kpff.com
9
— N
N
H
h
# Date Description
1 6.24.26 Performance Agreement
Scale: 1" = 60' - 0"
0 30 60 120
PROJECT NAME Braewood Hills Third Add. PUD
PROJECT ADDRESS Randy Lane
PROJECTADDRESS Eugene, OR
PHASE
PUD, Final
DATE
9.5.25
DRAWN BY CHECKED BY
ces ces
SHEET TITLE
COVER SHEET
SHEET NUMBER
Ll
■
'r'011
TE-SCHIRMIER
11- 8-94
���
C
OPTION 1: T WIDE LANDSCAPE BUFFER
MEETING L-3 PLANTING STANDARDS
K\SMEt
EXISTING 7' POWER LINE & WATER EASEMENT
DOC . NO. 19 5-055845 \�\SM�� LOT 32 GFZES� LOT A LOT 33 \SM�� LOT 34 GR&S� LOT 35
EXISTING WASTE WATER
sz
DeE
330.00' 25.00' 76.68' 3400 a3EXISTING
.89' 94,18' 16.25'• PUBLIC WASTE WATER LINE
129.62' 7128.0127' 128.00' .
130-00' - - 126.07'
LOT 1 14' PUE
W 7' 5' EXISTING T POWER LINE & WATER EASEMENT ENO°°
z u I 5' i - DOC. NO. 1975-055845, RECORDED 12/22/197LD
eRP
J LOT 1 LOT 2 LOT 3 I` 10' WIDE PUBLIC VARIABLE WIDTH PRIVATE UTILITY
UTILITY EASEMENT
Z m 12,886 sf I 12,753 sf 12,829 sf ( Io LOT 4 AND JOINT ACCESS EASEMENT o
�t to m 13,081 sf LOT 5
a m �o PROPOSED FIRE HYDRA T 12,619 sf
a I� VARIABLE WIDTH 10' WIDE PUBLIC I Iti o
T PRIVATE UTILITY AND UTILITY EASEMENT N
JOINTACCESS EASEMENT _ 579°25'40"E
o N 80°32'Ol" E s' WIDE PUBLIC OPTION 1 . "WIDE LANDSCAPE BUFFER
10.10' UTILITY EASEMENT N 89°3 '
m m � 5 50" W 216.91' 0
o lo.Ds'� ___�__ _______ _ 5° MEgRpE�� L-3 PLANTING STANDARDS
129.09 _ _
128.02' r + - - - - - - -
-_w_.L 96.22' I -�
:24A C25 90.08 ' 11268T
$ I o N 89"35'50" W 353,33' o N 06°34'07" E ' R - II (I I" I` IN No 22.00' 1 C4,4
3
_44.82' 50.00,
OS°226" 8" Oak l0'WIDE PRIVATE I 412,
UTILITY EASEMENT LOT 7 LOT 8
2` ° 4.56' AS'213to n i�
12,876 sf 11,182 sf
Do I N 79°21'35' W Gry� w
F�5''WIDE PUBLIC S 82°03'49" W
5' WIDE PUBLICS I UTILITY EASEMENT 4.24' \ / 0.36' to
UTILITY EASEMENT o o I LOT 2
LOT 6 a to LOT 10 a H
"� I / LOT 9 o I° o DRjH
I 10, WIDE PUBLIC ti/ v i " Z 12,772 sf
12,956 sf I I UTILITY EASEMENT / 10,597 sf
10" Pear I - - I in '�'/ " i,� - - I Y WIDE PUBLIC
yyII I I^- i UTILITY EASEMENT
_ 128.54' `
- I� - �J L-1 J jLL -
_ 128.02' 108.63' 4/;. _ 3D.00'
- - - I I 121.76' -I 127.59'
I N 89°35'50" W 365.19'
S 8l°36'12" E r I N 89°35'S0" W- 49.35' o 26.19, -f-5' PROPOSED VARIABLE WIDTH PRIVATE m/ _' NOR�N
TV
ARIABLE WIDTH UTILITY CORRIDOR
PRIVATE UTILITY AND S 00°24' 6" W LOT 1214'WIDE PRIVATE UTILITY
JOINT ACCESS EASEMENT ?p� O.l 10`28 14,761 sf 7 / AND JOINT ACCESS EASEMENT
o h
\\` 1� �� C22 Fi u / LOT 13 o LOT 14
rD LOT 11 C1°4r S 74°24'35" E m/ lilt m
w 7 `.R > Coy � / 11,404 sf 10,873 sf 8
12,451 sf ,� Zs, rE . p 3sD' s
� rivet, 10' WIDE PUBLIC y /
�31'WIDEPUBLIC _N �,�r'+',.L,Cp��__ �UTILITYEASEMENT; T" �a/ PROPOSED PRIVATE STREET
STORMWATER EASEMENT o: --
z ' q ., 50.3;. - h N ROW: 26.5'
c1
G 6> \ C:" m7 U 146.15' 128.24'
n zs' / 4 -5.19' SIDEWALK ON ONE SIDE: 4'
.39' LOT N89°35'50" W 274PAVING WIDTH: 21'
N89°35'S0"W 127.02' -
N 89°36'24" W 3 09'26'24"WLOT 18 -
0 Cjq. 35'_ s ''�6,94O4SQ.FT. OPTION 3: 25' BUILDING SETBACK FROM
23,0
51.53' - J 1'32,830 sf
,5A9 E\ PROPERTY RTY LINE.
'E PRIVATEI P POSED FIRE HYDRANT STORMWATER EASEMENT ,
0.
LOT 15 M LOT 16
13,478 sf 14,581 sf = LOT 17 j \' I y I w a 10'PRIVATESTORMEASEMENT EXISTING STORM WATER
s 11,914sf °� i 7'PRIVATESTORMWATEREASEMENT y'°15 PER BRAEWOODNORTH P.u.D. EXISTING STORMWATER APPROVED TO BE
14' WIDE PRIVATE UTILITY,��,,
Existing 5'ANOJowrnccessEASEMENT I -T--S0W24'10"w Bike Lane 43.80' DISCHARGED TO PRIVATE PROPERTY
-� tiN I ) _
2\. 17'WIDE PRIVATE z I UTILITY ASELMENT 3.5' BRPE�pOD
Pav men _ \ STORMWATER EASEMENT I I ` '
r,n1r� -35
.'
50' O ` 10'WIDE PUBLIC-
` a tJSgR'------r.T-: 34.32' 58935'S0"E 295.90' m
Cq1�€ UTILITY EASEMENT ,c*=_d_ �,^ !yam
\ 5" Red Horse Chestnut I
N 63°26'08" W \ 10 \ w
4 41' \. - S 88°34'OS" E_110.65 - I o 130.5l130.59' F\
16.6s 35' v \ i- �� - - - - - - - - v1 zr 16s.3r PROPOSED PRIVATE STREET
N 89°53'09" W co E 7 c� ; $6 1 �- - - - }Ti \\_.-5' WIDE PUBLIC u'- OW: 26.5'
PROPOSED VARIABLE WIDTH PRIVATE
12.30' vi N \ 2js' q3'" 10' WIDE PRIVATE UTILITY CORRIDOR unuTv EASEMENT
h R \ ti / '/ N N U SIDEWALK ON ONE SIDE: 4'
STORMWATER EASEMENT 1
7O0o• \\ \ / LOT 20 0 ` LOT 21 FENCE LOT4 PAVING WIDTH: 21'
R ?8\\ �' / LOT 19 L; I 12,588 sf \ 14,954 sf �pO Pst°FPg p
13,267 sf w A3 gFzP
52.17' ' EXISTING T UTILITY EASEMENT
\ DOC. NO. 2003-114113, \
\RECORDED 11/25/2003 15 \ 1 \
5" Black Tupelo
5" Black Tupelo ODD \\ \ ti6� 1 - N 89°3259" E 155s4' \ OPTION 1: T WIDE LANDSCAPE BUFFER
- ; � \ -�
Existing Street Light \\ Qa° E 1A39 MEETING L-3 PLANTING STANDARDS
8" Red Horse ChestnutCam, \ LOT 23 N N6'I°315°
7" Red Horse Chestnut �N00 \\ LOT 22 \ \ \��11' WIDE PRIVATE 11,519 sf NDRtN
BRP \ \ \ STORMWATER EASEMENT
\ \ 11,430 sf \ \ W p
6" Red Horse Chestnut \ \\ \
EXISTING IO'SLOPE EASEMENT \\ \ \ VARIABLE WIDTH PUE N w
DOC. NO. 2003-114114, LOT 26 GOAL 5 RESOURCE and SETBACK
\ \ RECORDED 11/25/2003 ",¢'%' 13,492 sf
\ \ \ r \ w
\ � SETBACK: 40' AS REQUIRED BY GOAL 5
8" Red Oak N 82.24'00" E 133.40, N S 62°42'02" W 5.00'
RESOURCE CLASSIFICATION
PER C.S. FILE NO.46771
10" Red Oak I
Existing Street Light F9\ \ \ \ 0.$p1°° \\\ \ w wo N61°g150
ESQ \ \ LOT 24 \ LOT 25
�� a LOTS NOR�N
\ 10,440 sf \ \ \ 10,965 sf oo /4� c�o\.StoFCP OPTION 3: 25'
8" Red Oak �' \
10'WIDE PUBLIC--�"I) 12.25 3D' 2 S8 BUILDING
8., UTILITY EASEMENT I PUBLtC �'� s 9
VIDERA PARK \\ \ \1pRtpBLE EME"T LOT 27 SETBACK FROM
\ fff17' WIDE PRIVATE I CO1i - i UTILITY EAS 154.03 -7 \ ^i �O 12,700 sf
9" Red Oak \ R\\ ( STORMWATER 40'41 E M ry PROPERTY LINE.
EASEMENT I l I td i�°
t5 OG
8" Linden 47 ?3 of �� \ \ Z TH VARIABLE WIDn \ \\ 153?3
9" White Oak \ I / _ tC
\ \A 85 3?'3 W/ Z 10• W{DEP MENi. PRIVATE UTILITY AND y',� ;�\?\ 6S AA!
,,,W \ j ;'7 l U EPSE JOINT ACCESS EASEMENT
J/ slu�v �Y
8" white oak j \ •� yes \ 2 LOT 28
l/ /" LOT 29 `'s
Existing Street Light \ 01 e ,f / 12,353 sf mow° 11, 022 sf 1 a J P \3p.
PROPOSED SIGN \ " 1`a \ 14' WIDE PUBLIC 11\ ° LOT 32 eR
UTILITY EASEMENT `',.a LOT
29,169
(23.7% WR) ENCE
� Gl EFOF
5' WIDE PUBLIC 191� cR1` EPST 2.gs• 1N
UTILITY EASEMENT 5° E UTILITY EASEMENT
WIDE PUBLIC Z N�
09 i 0 68. F O
.. , 11• \\\ , N6Ct i .Lp O,,,,,y '�
Y WIDE PUBLIC 410 'b
P" .a STORMWATER ^.. / -�„r , \ S6S, (� 1 95
EASEMENT > , ti
9°6 tih 955? F >a 6,913s f ,.
5- WIDE PUBLIC LOT 316'� Q 1,437 sf
UTILITY EASEMENT 2 yti6 28" Z6Z3z•
as
14,100 sf
0
\ wo: (31.14% WR)
SEE CIVIL PLANS FOR STO.RMWATER \ \
"P 14' WIDE PRIVATE UTILITY.
AND UTILITIES \ . \ ANDJOISMENT
LOT30w� E
15,616 sf 4,391 sf NTs°3°'49' 1Tip1 65a 5,124 sf
3 Ni \\ (30.52% WR) 19Y 45A9 9�•
.D 11 Ag' 110. -, s
45 49° E 1j-I4T wLOT 33
16,171 5' WIDE PUBLIC �
FNDS86°44'24"W \\ uTi C'T'Ep,SEMENT
4,766 sf 5,373 sf F
0.19, , s M (31-69% WR) Jc,
1 9g ss3 LOT B 1
1
0o w E 1 ^ N 89°00'45' V: 192.26' ws-
gRPEw \� 41o1�14 3g2'F 1,806Sf- - - - - - - - - - - I ---
\ \ ss
sp, 3 110.00, I' 82.26
5,213 sf 7 �,
\ N 86°44'34" E
17.77' o �T '
LOT 34 I LOT 3516
UTILITYErlSE1M91T i
VICINITY MAP \ (29.4 sf (29.1 %
�\ I LOT 36� h LOT 37
�� �� 5' WIDE PUBLIC (29.4% WR) � � (29.18 % WR)
". O' \ ♦ STORMWATER EASEMENT aI 13,750 sf 31 4 41.923 sf
\\ �i
N 89°00'45" WI 22.00' N I ,..•
11.00' .1100 I I n
5 WIDE EASEMENT� UTILITY EASEMENT - PUBLIC
gl
5'WIDE PUBLIC
TWIDE
\. n
s � i ui a
UTILITY EASEMEN
L=321.73' -7 �--'VAAMSLE WIDTH
P�IIIA7E - UT&ITYAND
272 .. R=.50'
A=67°38'49" ^1'..�-. - IONT ACCESS EASEMENT
0 8 � - �L�. - - - - - - - - - - - - -1
CHD=N55'11'21"W \` 52.62'
303.37'
F �
M N 6ZST19• E
_ I tea,
., -
_ wo 46036'50°E
.' RLo�cal Street as3
END N 71°5T58" E
PROPOSED PUBLIC STREET 0.44' 7L=2781'
a ROW: 40.0' R=72.49'
PROPOSED FIRE HYDRANT A=21'58'47-
SIDEWALK ON ONE SIDE: 4' PROPOSED 1' RESERVE STRIP CHD=N78'0172'W
PAVING WIDTH: 21' 27.64'
NOTE
• PUBLIC IMPROVEMENTS TO BE CONSTRUCTED PRIVATELY.
• ALL NEW ON -SITE UTILITIES WILL BE PLACED UNDERGROUND.
• ALL PROPOSED UTILITIES TO BE CONSTRUCTED PRIVATELY.
TRANSIT FACILITIES
EXISTING TRANSIT FACILITIES:
LTD #33: STOP LOCATED 1.5 MILES NORTH OF INTERSECTION OF 28TH AND
CHAMBERS.
BENCHMARK
VERTICAL DATUM: CITY OF EUGENE.
BENCHMARK: 3 INCH BRASS DISK ON THE WEST SIDE OF HAWKINS LANE, NORTH OF
VIDERA DRIVE. BENCHMARK NO. 2046. ELEVATION = 753.57'.
RECORDED SUBDIVISIONS CONTIGUOUS
Al Rif OAKI ,y` v.LW v144Y
PAPK LSlA1(:'k w -1fH Glrl
P Ar 1 1uArl r
+'{�D Al. P6I71i
t� t W
IV ALAI IA ,TH
KZSeiEi vrLw A;JD
C dS'SI PAIR RAFT
k.Rt=if1vIEClt tit
PAPA fEW ADD
PUD li)lH
ADt? W t.
ACR
J-
a s
s
BRAE44t7QD
rivATH
Pull
SRAI"wrvfft
iND
A011
inK Kl'i4 .. AT
b! F:E F
�JF
Qjr I D I
"Ic I, BR.A "VWaor, 64
WE SF <R'dE WE,OUTL2iilt�i
fillIS
2t,E:
_ ADD.
p1lb
m
m z tcial\D
B1tA2 W W 11,)
a` BRAI W(Kyfl WEST
Z' W( " 010
I S; ACID
HYDRANT LOCATIONS
k=
St 82S
Ia.3S 224U
5 ,r
of
d
iii862 ', �
v, 3,
tJ8n2 t
�Y.9rc d
TOP OF B K n
it&A
PROJECT INFORMATION
MAP: 18 04 11 12
TAX LOT 200
ZONING R-1 / WR / PD
AREA 15.47 ACRES (13.57 ACRES NET)
PUD NOTES
1. NO BUILDING, STRUCTURE, TREE OR OTHER OBSTRUCTION SHALL BE PLACED OR
LOCATED ON OR IN A PUBLIC UTILITY EASEMENT, CONSISTENT WITH EC 9.6500(3).
2. COMPLIANCE WITH PUBLIC IMPROVEMENT REQUIREMENTS SHALL BE DEMONSTRATED IN
ACCORDANCE WITH EC 9.6505 AS PART OF THE PERMITTING PROCESS FOR
DEVELOPMENT WITHIN THE PUD INCLUDING PRIVATELY ENGINEERED PUBLIC
IMPROVEMENT (PEPI) PERMITS, SITE DEVELOPMENT PERMITS AND BUILDING PERMITS.
3. A PRIVATELY ENGINEERED PUBLIC IMPROVEMENT (PEPI) PERMIT SHALL BE ISSUED FOR
CONSTRUCTION OF PUBLIC IMPROVEMENTS PRIOR TO DEVELOPMENT.
4. COMPLIANCE WITH ALL APPLICABLE DEVELOPMENT STANDARDS, SPECIAL USE
LIMITATIONS, AND OTHER GENERAL DEVELOPMENT STANDARDS FOR SINGLE -UNIT OR
MIDDLE HOUSING RESIDENTIAL DWELLING TYPES SHALL BE DEMONSTRATED AT THE TIME
OF FUTURE BUILDING PERMIT ON EACH INDIVIDUAL LOT.
5. NO SITE ALTERATION IS ALLOWED PRIOR TO FINAL PUD APPROVAL. THIS PROHIBITION
INCLUDES SITE GRADING AND THE REMOVAL OF TREES AND OTHER VEGETATION, AS
WELL AS ANY IMPACTS TO WETLANDS AND THE PROTECTED STREAM ON THE SUBJECT
PROPERTY INCLUDING CHANGES TO THE EXISTING DRAINAGE PATTERN. ANY SUCH
ALTERATIONS SHALL ONLY BE ALLOWED SUBJECT TO PERMIT REVIEW AND APPROVAL,
AND EROSION CONTROL MEASURES AS REQUIRED FOR THE PROPOSED WORK.
6. THE APPROVED STORMWATER SYSTEM SHALL BE DESIGNED AND SIZE BY A CIVIL
ENGINEER FOR THE FULL BUILD -OUT OF THE PROJECT INCLUDING 20% OF EACH LOT
ASSUMED TO BE IMPERVIOUS SURFACE AREA. IF A LOT IS PROPOSED TO BE DEVELOPED
WITH MORE THAN 20% IMPERVIOUS SURFACE AREA, THEN ADDITIONAL ON -SITE
DETENTION IS REQUIRED. STORMWATER RUNOFF FROM PRIVATE FACILITIES MAY ALSO
BE COMBINED WITH RUNOFF FROM THE PUBLIC STREET (RANDY LANE), AS LONG AS THE
PUBLIC DETENTION SYSTEM IS SIZED AND DESIGNED IN ACCORDANCE WITH APPLICABLE
PUBLIC IMPROVEMENT DESIGN STANDARDS.
7. IN ADDITION TO THE ON -SITE DETENTION REQUIREMENTS NOTED ABOVE, ALL
SUBSEQUENT SITE DEVELOPMENT PERMITS, BUILDING PERMITS, AND PRIVATELY
ENGINEERED PUBLIC IMPROVEMENT (PEPI) PERMITS FOR DEVELOPMENT OF THE PUD
SHALL DEMONSTRATE COMPLIANCE WITH APPLICABLE STORMWATER STANDARDS AT EC
9.6791 THROUGH EC 9.6797 AND REQUIREMENTS OF THE STORMWATER MANAGEMENT
MANUAL.
8. ALL FUTURE BUILDING PERMITS FOR LOTS 30 THROUGH 35 SHALL DEPICT THE GOAL 5
RESOURCE AND ITS 40-FOOT SETBACK FROM TOP OF BANK AND SHALL INCLUDE SITE
PLANS SHOWING THE LOCATION OF PROTECTIVE FENCING SUBJECT TO THE APPLICABLE
STANDARDS AT EC 9.4920 - 9.4930.
9. COMPLIANCE WITH ALL APPLICABLE DEVELOPMENT STANDARDS, SPECIAL USE
LIMITATIONS, AND OTHER GENERAL DEVELOPMENT STANDARDS FOR SINGLE -UNIT OR
MIDDLE HOUSING RESIDENTIAL DWELLING TYPES SHALL BE DEMONSTRATED AT THE TIME
OF FUTURE BUILDING PERMIT ON EACH INDIVIDUAL LOT.
10. NO DEVELOPMENT OF MIDDLE HOUSING, SINGLE -UNIT DWELLINGS, OR ANY OTHER
DEVELOPMENT, INCLUDING BUT NOT LIMITED TO LAND DIVISIONS, MAY OCCUR ON ANY
LAND ABOVE 901-FEET IN ELEVATION.
11. NO SITE ALTERATION IS ALLOWED PRIOR TO FINAL PUD APPROVAL. THIS PROHIBITION
INCLUDES SITE GRADING AND THE REMOVAL OF TREES AND OTHER VEGETATION, AS
WELL AS ANY IMPACTS TO WETLANDS AND THE PROTECTED STREAM ON THE SUBJECT
PROPERTY INCLUDING CHANGES TO THE EXISTING DRAINAGE PATTERN. ANY SUCH
ALTERATIONS SHALL ONLY BE ALLOWED SUBJECT TO PERMIT REVIEW AND APPROVAL,
AND EROSION CONTROL MEASURES AS REQUIRED FOR THE PROPOSED WORK.
12. THE APPROVED STORMWATER SYSTEM SHALL BE DESIGNED AND SIZED BY A CIVIL
ENGINEER FOR THE FULL BUILD -OUT OF THE PROJECT INCLUDING 20% OF EACH LOT
ASSUMED TO BE IMPERVIOUS SURFACE AREA. IF A LOT IS PROPOSED TO BE DEVELOPED
WITH M ORE THAN 20% IMPERVIOUS SURFACE AREA, THEN ADDITIONAL ON -SITE
DETENTION IS REQUIRED. STORMWATER RUNOFF FROM PRIVATE FACILITIES MAY ALSO
BE COMBINED WITH RUNOFF FROM THE PUBLIC STREET (RANDY LANE), AS LONG AS THE
PUBLIC DETENTION SYSTEM IS SIZED AND DESIGNED IN ACCORDANCE WITH APPLICABLE
PUBLIC IMPROVEMENT DESIGN STANDARDS.
13. IN ADDITION TO THE ON -SITE DETENTION REQUIREMENTS NOTED ABOVE, ALL
SUBSEQUENT SITE DEVELOPMENT PERMITS, BUILDING PERMITS, AND PRIVATELY
ENGINEERED PUBLIC IMPROVEMENT (PEPI) PERMITS FOR DEVELOPMENT OF THE PUD
SHALL DEMONSTRATE COMPLIANCE WITH APPLICABLE STORMWATER STANDARDS AR EC
9.6791 THROUGH EC 9.6797 AND REQUIREMENTS OF THE STORMWATER MANAGEMENT
MANUAL.
14. ANY DISTURBED AREA WITHIN THE CONSERVATION SETBACK SHALL BE REPLANTED
WITHIN 90 DAYS OF ANY CLEARING OR VEGETATION REMOVALS ACTIVITIES, UNLESS
OTHERWISE APPROVED THE THE EUGENE PLANNING DIRECTOR.
TABULATION OF IMPERVIOUS SURFACES
SEE STORM DRAINAGE MEMORANDUM.
x 1fe
R 1US76 LEGEND
x i
= ° eewl
C
a'�. 1U:143
1U`0
>u z 10467
s s EXISTING WASTE WATER LINE
� 36'�+u4ftvrCw [lr ? � 4f14$t
SD sD EXISTING STORM SEWER LINE
8" DI
W w EXISTING DEIONIZED WATER LINE
PROPOSED STORM SEWER LINE
PROPOSED WASTEWATER LINE
EXISTING 6' CHAIN LIN ENCE TO REMAIN
P�p----- PROPOSED WATER LINE
gRP��00O PROPOSED PROPERTY LINE
z3 a8 LOT PROPOSED EASEMENT
IV
VISION CLEARANCE TRIANGLES
N 34°35'20" W
14.13' �q4 Z `
�o
88. LOT s
FH -b- EXISTING FIRE HYDRANT
N 56°16'34" W
\ PROPOSED FIRE HYDRANT
6.75' \ \ \ EXISTIP'�0' WOOD FE TO REMAIN
LOT 38 \ \ \\ 3>s, P0e��`F° OF PROPOSED FIRE TURNAROUND
73,158 sf \ \ LOT o°P5`o RAP
.rss (0.0196% WR) \ \ \
63 4g., NS- 6k
4 F \\ 0
EXISTING STREET TREE
AL \ REP
s \ 2>S \ LOT 105 LF,
F o° STORMWATER TREATMENT FACILITY
\ \
\ \ LOT 104
EXISTING 14' UTILITY EASEMENT \
s ooc. RECORDED
/18/241, \ \a 64 STORMWATER TREATMENT FACILITY
qs RECORDED 07/18/2001 \ ���
O6.w6�ZgZ N 31°58 29, 60' m eRPE�Ig°�P�\N00V N\L\-5 IILL11
\ PORTION OF LOT COMPRISED OF
ss
GOAL 5 RESOURCE and
WOOD 0OF
CONSERVATION AREA
EAST OF PB
° N EXISTING WETLANDS TO REMAIN
END N 44°21'47" E
F 0.50'
m
FND N 47°20'28" E ?2, END N 41°19'50" E END S 88°43'23" W
0.68' END N 51°59'27" E 0.64' 25.24' N N
0.63,
L=1a,01' WETLAND BOUNDARY
R=72A9LOT 103
L=81.05' A=14°1N59"
R=127.50' CHD=583° 43"W
A=36°25'18" 17.936. N
CHD=N 956194'37"W 5 76°32'44" w 900 FOOT CONTOUR
38.07' P �'
2N° p0C
EXISTING STREET LIGHT
SCHIRMER CONSULTING, LLC
Landscape Architecture + Land Use Planning
PO Box 10424
Eugene, Oregon 97440
Phone:541.234.5108
SCHIRMER CONSULTING, LLC., LANDSCAPE ARCHITECTURE
AND LAND USE PLANNING EXPRESSLY RESERVE ITS COMMON
LAW COPYRIGHT AND OTHER PROPERTY RIGHTS IN THESE
PLANS. THESE PLANS ARE NOT TO BE REPRODUCED,
CHANGED, OR COPIED IN ANY FORM OR MANNER
WHATSOEVER, NOR ARE THEY TO BE ASSIGNED TO A THIRD
PARTY WITHOUT FIRST OBTAINING THE WRITTEN PERMISSION
AND CONSENT OF SCHIRMER CONSULTING, LLC.
IN THE EVENT OF UNAUTHORIZED REUSE OF THESE PLANS BY
A THIRD PARTY, THE THIRD PARTY SHALL HOLD SCHIRMER
CONSULTING, LLC. HARMLESS.
PROJECT NAME:
BRAEWOOD HILLS THIRD
ADDITION PUD
Phases 5 and 6
66
n
P �
A
lr Sri,
.;"i �- h
e�
REVISIONS
# Date Description
1 1.21.26 Completeness Review
2 6.24.26 Performance Agreement
N
Scale: 1" = 60' - 0"
0 30 60 120
PROJECT NAME Braewood Hills Third Add. PUD
Phases 5 and 6
PROJECTADDRESS Randy Lane
PROJECTADDRESS Eugene, OR
PHASE
PUD, Final
DATE
9.5.25
DRAWN BY CHECKED BY
ces ces
SHEET TITLE
SITE PLAN
SHEET NUMBER
L2mO
4l 4W11
1
•
AN SCHIRMER
GON
.4Ily
11-1 94
_..3 [El S MH-06 : a Ej arE -- �E� [El 4� -? ' [El [EI - -
S EX-DROP-MH 01 °°
IE 4" IN=811.96 (W) c
IE 8" IN=746.92 (S) IE 4" IN=811.96 (N) Ln
IE 8" OUT=741.48 (N)
IE 6" 1N=811.88 (E) I zo `
LOT 1 I LOT 2 IE 8°our=810.80 (s) 31T 3 LOT 4 I LOT 5
( S S STUB-LOT-1
4„ I I
_ I I I
WQ I W FH-02 S STUB-LOT-5
S S STUB-LOT-2 S STUB-LOT-3 S
6"S
S S A
co41-
�u
2
1 S STUB-LOT-7 I -
kS 4„
S SSTUB-LOT 6
LOT 6 4"
LOT 7 LOT 8 LOT 9 LOT 10 -'- - - - -
I S S STUB-LOT-9
411
S STUB-LOT-8 S JJ 4"
WQ #; I 4'
I# WQ
DET ( I S 4"
STUB-LOT-14 �
1 s .
F j
W . 4�S _ �. u.�.
1 SSTUB-LOT-12 ` CID
`
S PLUG-EX-3 S MH-05 4„ S`� a'� LOT 14 `s
S IE 8"=753.75 IE 8" IN=808.39 (N) 2 LOT 13
LOT 11 IE 8" OUT=808.29 (S) I v
S STUB-LOT-13
3 Q o -µ; `__ O :5rS 6S CO-LOT-19 y LOT ZV `, �... .
co
z S MH-EX-03 _ A
IE 8"=768.38 4 LOT 19
IE 8"=768.17 10 �1.5 / bo
IE 6"=768.50 2�Vco
Fq WQ S MH-03
IE 8" IN=807.22 (N) WQ '
IE 8 OUT=807.12 (SE) \ LOT 23 \
2 LOT 22 G
S.S CO-LOT-22 '�\
6„ \\� S 4„STUB-LOT-23 LOT 26
SCALE 1 INCH = 50 FEET
i
S MH-02 WQ
IE 8" IN=806.49 (NW) S SSTUB-LOT-26 /
IE 4- IN=809.25 (E) 4
`\ IE 8" OUT=806.39 (S) /
\ S S CO-LOT-24\\ LOT 25
6„ /
d„ SSTUB -LOT-25 \
001, �\ ! SOLIT-DROP-MH-1 `y `oLIII_' S 4" 7
IE 8" IN=806.08 N 'r' \ LOT 27
\ F ` IE 6" IN=810.44 (E) I -II
IE 8" OUT=805.98 (SW) WQ
\ 6'S S SSTUB-LOT-27
e y
2 \
1 s ss \ i /
WQ S SSTUB-LOT-28 /
\_ \ 4„ /
\ S STUB-LOT-29 \ S STUB-LOT-32 sss /
\ S 411\ S 4" LOT 32
\
S OUT-DROP-MH-2 2
IE 8"=794.85 �LOT 29
IE 8"=802.00
o
S MH-EX-01 A WQ /.,. / S STUB-LOT-31
IE 8" IN=794.29 (NE) \ S 4" /co
IE 8" IN=794.23 (SE) \ \
IE 8" OUT=794.21 (NW) � � �= LOT 31 \
/ S OUT-DROP-MH-3 2 \
IE 8"=795.23 LOT 30
� IE 8"=803.08 \
S CO-LOT-30
S OUT-DROP-MH-4 �' I LOT 33 \
IE 8" IN=809.80 (SE) WQ I \
IE 6" IN=810.80 (NE) _
IE 8" OUT=805.00 (NW) . "' - - - - -- --
\ I I
- WQ I I I I S S STUB-LOT-3 6_
S MH-10 \ S CO-LOT-34 I ;o \
IE 8" IN=813.25 (SE) s.. S 6" LOT 35 I LOT 36 I III
I I
IE 8" OUT=812.75 (NW) L.OT 34 I LOT 37
\ WQ
S CO-LOT-36
. S S CO-LOT-35 S 6'
S FT-MH-09 8 S 6- - - _ I S CO-LOT-37 \
IE 8" IN=823.06 (SE) - S 8„ \
IE 6" IN=823.38 (NE) 8"kt I
IE 8" OUT=822.56 (NW) �8„S
RANDY LANE
I
vv 8„W W \
S FT-MH-08
IE 8" IN=837.98 (E)
IE 8" OUT=837.48 (NW)
W FH-03
S FT-MH-07
IE 6" IN=861.68 (N)
IE 8" IN=861.68 (E)
IE 8" OUT=861.28 (W) �
SHEET NOTES
1. WATER MAIN TO BE INSTALLED UNDER EWEB PERMIT.
O KEYNOTES
NOTE DESCRIPTION DETAIL
REF.
1 CONNECT TO 8" PUBLIC EWEB WATER MAIN.
COORDINATE WORK WITH EWEB.
2 CONNECT TO EXISTING 8' PUBLIC SANITARY MAIN.
S PROVIDE SANITARY SEWER STUB TO LOT FOR FUTURE
DEVELOPMENT.
WQ VEGETATED WATER QUALITY SWALE
DET DETENTION BASIN
UTILITY LABEL LEGEND
STRUCTURE LABEL
UTILITY TYPE (S=SANITARY SEWER, W=WATER, FP=FIRE
PROTECTION)
STRUCTURE TYPE CALLOUT
XX XX-XX ID NUMBER (WHERE APPLICABLE)
X+XX.X RT X.X' LOCATION (WHERE APPLICABLE)
RIM=
IE IN = XX.X STRUCTURE INFO (WHERE APPLICABLE)
IE OUT = XX.X
PIPE LABEL
UTILITY LENGTH
- Fr-f
SIZE
UTILITY TYPE
XXLF - XX" XX
S=X.XX% SLOPE (WHERE APPLICABLE)
STRUCTURE TYPE
CALLOUT DESCRIPTION DETAIL REF.
CO CLEANOUT TO GRADE
FH FIRE HYDRANT
MH MANHOLE
PLUG PLUG
STUB STUB
ss
1 5
r.
11 a'So
'-1� "RAPhDY lAn�
ItIpff
800 Willamette Street, Suite 400
Eugene, OR 97401
O: 541.684,4902
F: 541.684.4909
www.kpff.com
Z
0
LU
4
I N O
gr
;�
V)
STAMP
D PROFFS
G 1 N p-
88168 l
DIGITALLY SIGNED 2026.06.15
14:57:09-07'00'
OREGON
9yy yqY 10,�'�
91UTTRE0-%
EXPIRATION DATE: 12/31/2027
z
0
U
W
LLJ
0
z
0
w
of
JOB No.: 2100216
DESIGNED BY: AB/FU
DRAWN BY: AB/FU
CHECKED BY: AB
PLOT DATE: 6/15/26 2:52pm
PLOTTED BY: ABackus
DWG NAME: 2100216-01UT.dwg
TAB NAME: C1.0
Q
r
cn ry
o
N
-� w
= O
o w
}
p - cn
D
0
IM
m
1-1 z
m = �
I- L1J
Q
SHEET NO.
ti
D
i
J
J
i
_ U)
a �
cc
�m
E
-V M
Z5 �
ZD N
I")
X
N
I , ---- -c - _ rE�l ar. - - - jE _ E _ _ _ - - LU K = 5.00 c� v
z..... M., 1, V
o-
; .' > > 81
50 C
•
,..
>M
w 5 34' PVIE �
825 o w 2+43.80 PVIS
y !� s2o _ _ _ _ N
I i I LOT 3 LOT 4 r ~ o - -2.00%
I ]123� f 815 _ N °°
i, DET : 810 PROPOSED y
m __
o _ GRADE 2+10.50 GB
W Q co M °° 805 m o o N _ 818.00
co O co A o 0o co + rn - ®oo EXISTING
m I C.0 I o ti M GRADE -8.00%
co . — -- - - - 795 �� _. a .--_ �. �__ + o0
----
-®— — — co -- -® -® ®®----- -- -- ---
I Nw �� I ter`
Ile
790
-10.
785 "
� I
-
�I780
9
LOT 7 LOT a'�$ L
775
Q 4+50 4+00 3+50 3+00 2+50 2+00
I \ wQ I I RT PROFILE
' cry wQ I TAM B O U R CO U
M -, SCALE: 1" = 20' SLOPE AT 3:1 TO
MATCH EXISTING
2
L T 1 C3.o L 4
WATER QUALITY
CURB & GUTTER SWALE
I'f Y L 1 VC3.0
CURB &
N 30 4+0
i 0 SLOPE AT 3:1 TO SIDEWALK
4+
DET o� o_� TigMg� MATCH EXISTING
I i / rn ob O CO ---- -- — — —
..
Ill i
EXISTING GRADE
`d I w° �o� �o`D ow o "- 2+00 +88 '' H
co 00 co
WQ T 21'
I� 1 SHED SECTION 4' WALK
';L T 7
16
PRIVATE DRIVE SECTION
SCALE 1 INCH = 50 FEET
50 0 50 100
(2912
LOT 26
1
s
s
LO
co
LOT 27
O
1
LOT 32
\ ��s
431
rd
i
f �\
�J
it
Cb � �
ci c
LOT 36
SCALE: NTS
EXISTING GRADE
- SLOPE AT 3:1 TO
MATCH EXISTING
WATER QUALITY
l�l Imn O (1I ITT n -1.1 -
21'
SHED SECTION
3
PUBLIC I
/ SCALE: NTS
/
/
/
LOT 33
148
r- _ 4I- - L-
882:
\ 80
8781 OT a
\876
Cps
O,
O�I ,
co �00
SECTION
LOT 38
(90
896
J
ti
SHEET LEGEND
825
820
815
810
805
800
795
790
785
780
775
1+50
SLOPE AT 2.5:1
TO MATCH
EXISTING
EX. CONTOUR MINOR
EX. CONTOUR MAJOR
CONTOUR MINOR (FG)
CONTOUR MAJOR (FG)
STORMWATER WATER QUALITY FACILITY
DETENTION FACILITY
AREAS WHERE SLOPES EXCEED 15%
Q S`'
,--'�
2 $ 12 Sd
50
=�
lq3ff
800 Willamette Street, Suite 400
Eugene, OR 97401
O: 541.684.4902
F: 541.684.4909
www.kpff.com
Lu
Uj
o
LU
® o
LL
STAMP
PROFP,
�V\S I N c-
88168 l
DIGITALLY SIGNED 2026.06.15
14:57:10-07'00'
OREGON
q�y �9Y 20.
91(ITTRE1.�-�P
EXPIRATION DATE: 12/31/2027
z
0
F-
U
U)
LLI
0
LLI
F-
a
0
z
0
w
JOB No.: 2100216
DESIGNED BY: AB/FU
DRAWN BY: AB/FU
CHECKED BY: AB
PLOT DATE: 6/15/26 2:53pm
PLOTTED BY: ABackus
DWG NAME: 2100216-03GD.dwg
TAB NAME: C3.0
N
o
N
_
J
Q
O ® z
Q
uj
LU
m
� V
SHEET NO.
C3,sO