Loading...
HomeMy WebLinkAboutOpen Record memo 1 Date: May 13, 2026 To: David Doughman, Eugene Hearings Official From: Nicholas Gioello, Associate Planner, City of Eugene Planning Division Subject: Open Record Period 2 Appeal of Braewood Hill Third Addition Final PUD and Standards Review Approval (City Files PDF 25-01 and SDR 25-02) ______________________________________________________________________________ In accordance with the open record periods established following the public hearing held on April 29, 2026, staff provides this memorandum to give response to some of the submitted written testimony by the public during the first Open Record Period which ended on May 8, 2026. Staff response to testimony submitted by Julie Butler, May 6, 2026 Butler asserts that The Planning Director erred in stating that condition of approval 18 has not been met. Butler asserts that the Planning Director made a narrow interpretation of condition 18 by applying only EC 9.4980 in the decision and that the condition is subject to all applicable standards of EC 9.4900 through 9.4980. Specifically, Butler asserts that although the 40-foot conservation area for the category C stream was established and mapped during the Tentative PUD process, the 25-foot conservation area for the Category B wetland was not established and mapped following the standards in EC 9.4920(2)(b). Condition of approval 18 states the following: Prior to final PUD approval, the applicant shall obtain Type II Standards Review approval for the proposed public street extension of Randy Lane and any other utility crossings or other allowed improvements within the protected /WR conservation area, subject to the applicable standards at EC 9.4900–9.4980. It is important to note that this condition pertains only to the extension of Randy Lane and any utility crossing or other improvements within the protected /WR conservation area and does not apply to the site generally for future development of the proposed lots. Also, it appears that Butler possibly conflates her argument as applying to the entire area where the Goal 5 Memorandum The Atrium Building 99 West 10th Avenue, Eugene, Oregon 97401 Phone: 541.682.5377 | Fax: 541.682.5572 www.eugene-or.gov/planning 2 stream crosse the subject site. The condition of approval only applies to the area impacted by the extension of Randy Lane. It should also be noted that during the building permit process for individual lots adjacent to the Goal 5 resource, both the 40-foot conservation area for the category C stream and the 25-foot conservation area for the Category B wetland will need to be shown on the plans in accordance with the requirements of EC 9.4920 and EC 9.4930. As evidenced by the submitted site plans, the construction activity within the protected /WR conservation area is the Randy Lane street extension and underground utilities within the street right-of-way along the southern portion of the site. In the area where the street will cross the 40-foot conservation area for the category C stream, the mapped wetlands do not exist. As shown, the underground culvert east of the street extension area captures the water flowing through the wetlands and goes underground and daylights within Vedera Park to the west. In the area where the mapped wetlands end, the 40-foot conservation area for the category C stream creates an 80-foot-wide protected area that is far greater than the 25-foot conservation area for the Category B wetland and those conservation areas and setbacks are considered combined, as required under EC 9.4920(3). In staff’s opinion there is no need to show to the 25- foot conservation area in this location, nor anywhere other than those areas specified in the condition of approval. Staff response to testimony submitted by Dillon Thomson (Fertile Ground Conservancy), May 5, 2026 Thomson asserts that the Final PUD record does not appear to demonstrate conformance with conditions of approval 18, 19 and 22. Condition of approval 18 Regarding condition of approval 18, Thomson argues that this condition requires the Standards Review application to be approved and predated prior to the final PUD approval. Per EC 9.8005(2) an applicant may elect to have the applications reviewed concurrently, which occurred in this case. The provisions of Eugene code and respective approval criteria continue to apply to each application. In the event that the Hearings Official were to deny the Standards Review application, the final PUD would also have to be denied because the applications were elected to run concurrently and a finding of compliance with condition of approval 18 could not be made. Therefore, staff do not find that the condition of approval prohibits the decisions from being issued concurrently. Condition of approval 19 Regarding condition of approval 19, Thomson argues this condition requires the Final PUD plans to not be in conflict with the required 40-foot protective setback from top of bank. Thomson requests the Hearings Official confirm that the Final PUD plans are consistent with Condition 19 and that the Goal 5 resource and 40-foot setback are correctly depicted and not contradicted. However, condition of approval 19 specifically requires that all future building permits for Lots 30 through 35 show the protective Goal 5 setback on the submitted building plans. Thomson’s argument does not indicate how the Final PUD record does not appear to demonstrate 3 conformance with this condition; instead, Thomson requests the Hearings Official confirm the Final PUD plan in the record is consistent with condition of approval 19 and that the 40-foot setback is correctly depicted. This argument seems to imply that the Hearings Official should be able to confirm that the Final PUD plan that exists in the record is consistent with condition 19; however, condition 19 requires future building permits to demonstrate accuracy with the final PUD plan. It is noted that should the Hearings Official approve the Final PUD and Standards Review, the Final PUD plan set would also be approved, which would confirm the location of the 40-foot Goal 5 setback. Future building permits submitted for Lots 30 through 35 would be compared with the approved Final PUD plans for accuracy regarding the Goal 5 setback as intended by condition of approval 19. Condition of approval 22 This condition prohibits site alteration prior to final PUD approval, which includes site grading, the removal of trees and other vegetation, impacts to wetlands and the protected stream, and changes to the existing drainage pattern. Thomson requests that this prohibition be addressed in the record and that the applicant be notified of condition 22's continued applicability during the pendency of this appeal. Staff notes that the applicant had submitted a permit for site development (permit #25-05775) to include clearing of trees and vegetation, installation of utilities, paving of new private roads and grading on all the lots. This permit is currently under review and cannot be issued until the Final PUD and Standards Review applications are approved in accordance with condition 22. Additionally, per EC 9.7025, a Performance Agreement is required for final planned unit developments and EC 9.7025(2) states that, “the performance agreement binding the applicant, and the applicant’s successors in interest, assuring construction and performance in accordance with the approved final plans shall be executed by the applicant and city and notarized in a manner suitable for recording prior to issuance of a development permit.” A Performance Agreement is a signed agreement between the property owner or developer and the City which describes the scope of work, requires compliance with the approved final site plans, which are included as an exhibit to the agreement, and lists all the conditions of approval from the Tentative PUD, Final PUD and Standards Review decisions. The Performance Agreement also includes remedies for Breach and Liquidated Damages and is binding on all successors in interest. In accordance with Eugene Code, the applicant is provided with a copy of all decision documents and notices. Based on these facts, the applicant has been provided clear information regarding the prohibitions for onsite work prior to permit issuance and, in staff’s opinion, no additional statements in the record or notices to the applicant are necessary.