Loading...
HomeMy WebLinkAboutOpen Record 1 all testimony to 5-6-26From:julieb17@comcast.net To:GIOELLO Nick R Subject:Additional comments PDF 25-01 Date:Wednesday, May 6, 2026 4:52:36 PM Attachments:Appeal supplement PDF 25-01.pdf [EXTERNAL ] Hi Nick, Please include my attached comments to the record for the appeal and first open comment period. Thanks, Julie Butler Regarding the appeal of SDR 25-02 with WR/Resources Overlay and PDF 25-01. In addition to my earlier written comments and verbal testimony, I’d like to add the following to the record: The Planning Director erred in stating that Condition 18 of the Planning Commission’s decision had been met. According to Condition 18 of Planning Commission’s decision on PDT-24-01: "Prior to final PUD approval, the applicant shall obtain Type II Standards Review approval for the proposed public street extension of Randy Lane and any other utility crossings or other allowed improvements within the protected /WR conservation area, subject to the applicable standards at EC 9.4900–9.4980." The pertinent portion of the condition is highlighted. It states that the condition is subject to the /WR Overlay standards EC 9.4900-9.4980. It does not state that the condition is subject to just EC 9.4980 as has been interpreted by the Planning Director. As it is a stated and signed condition, it is binding under EC 9.8365(1) "The final PUD plan conforms with the approved tentative PUD plan and all conditions attached thereto." It must be upheld as written and not interpreted narrowly. For this reason, I reassert my position that the /WR conservation area setback required has not been properly determined as per EC 9.4920 (3): 3) To determine the /WR conservation area for sites in which wetlands exist along with either an upland wildlife habitat site or a riparian site, the /WR conservation area for each of the individual water features shall be calculated and mapped separately, and the total footprint of all the individual /WR conservation areas combined shall be the /WR conservation area for that site. While the conservation area for E35A, the Category C stream, was established and mapped during the PDT process, no conservation area was established for the Goal 5 Category B Wetland (AMA 5B), or as per the U.S. Army Corps of Engineers determination letter of 25 July 2025 labels it, Wetland 2B, a jurisdictional Water of the U.S. The conservation area for the Category B wetland must be established and mapped following the standards in EC 9.4920(2)(b). Additionally, as per EC 9.4920(3) the total footprint of both the wetland and stream /WR Conservation areas must be combined, with accurate setbacks of the combined areas mapped on the Final Site Plan. Any continued disallowance of the inclusion and mapping of the Goal 5 wetland setback is a direct noncompliance with not only the PDT conditions placed by the Planning Commission, but also the Eugene land use codes and therefore grounds for reversal. Thank you, Julie Butler 3234 Jayhawk Ct. Eugene, OR 97405 From:Keri Green To:GIOELLO Nick R Subject:May 6 PDF 25-01 and SDR 25-02 Date:Wednesday, May 6, 2026 3:32:16 PM Attachments:May 6 Appeal PDF 25-01 SDR 25-02.pdf [EXTERNAL ] Mr. Gioello: Please see attached comments in the ongoing matter of Braewood Hills 3rd Addition. Sincerely, Keri Green May 6, 2026 2225 McLean Blvd. Eugene, OR 97405 Mr. Nicholas Gioello, Planning and Development City of Eugene via email to: NGioello@eugene-or.gov Reference: PDF 25-01 and SDR 25-02 / Braewood Hills 3rd Addition Mr. Gioello: Following the public hearing held on April 29, 2026, I wish to provide comment into the public record regarding the goal of the neighborhood group known as Save Videra Oak Meadow (SVOM). SVOM has consulted with Eugene Parks and Open Space regarding the suitability of the property to be entered into Parks inventory and the interest the Department might have in acquiring this property. Parks and provided an affirmative response to both questions of suitability and interest. Since there is no city budget to purchase this land from the owner, SVOM is conducting a capital campaign to raise the funds necessary to purchase the property. It is likely that SVOM will be aided in this endeavor by Eugene Parks Foundation which recognizes the value of the property as an addition to city inventory. The intention for this property as a park is to preserve it in as much of its existing natural state as possible, and to restore and or enhance any areas that have been degraded by previous human activity. Eugene Parks would utilize the property as an “Interpretive Park” for educational and contemplative purposes. Development would be kept to a minimum, for the purposes of installing educational signage, interactive nature displays, walking paths of natural materials, and seating. Additionally, potential exists to link the property into Eugene’s Ridgeline Trail System. The property, as has been copiously documented throughout this proceeding, comprises one of the last remaining remnants of oak savanna, once a dominate ecosystem in the Willamette Valley, but now reduced to less than 2% of its original landmass. The property contains a multitude of naturally occurring wetlands that offer quality habitat for wildlife, flora and fauna, and provide water filtering services to Videra Creek which flows into the water quality limited Amaz on Creek. The hydrology and climate- adapted oaks serve as a natural firebreak. This property holds greater value to the community as a park that all can enjoy versus altering it forever into high-end housing. A significant reason the property hasn’t been developed to date is due to the challenges presented by draining the wetlands and installing complex stormwater systems. Doing so will require great expense and will be limited by seasonal time constraints and environmental restrictions imposed and monitored by Oregon DEQ and the City of Eugene. My hope is that Mr. Lundstrom and his representatives will understand the greater good this property serves as a park, and thus, will engage in negotiation with SVOM to reach price and terms. If the intent to develop for housing goes forward, it will take years and deep financial outlay before costs are recovered, with profit only following long afterward if at all. Mr. Lundstrom may easier and more quickly realize the Piculell Foundation’s goal of supporting the Crossroads Academy by entering into an agreement to purchase with SVOM, who will then enact a property transfer to Eugene Parks and Open Space. Sincerely, Keri Green From:dillon@fertilegroundconservancy.org To:GIOELLO Nick R Cc:Eugene Planning Subject:Supplemental Written Testimony — Fertile Ground Conservancy — PDF 25-01 / SDR 25-02 Date:Tuesday, May 5, 2026 4:18:40 PM Attachments:Exhibit_A.pdf FGC_Supplemental_Testimony_PDF25-01(1).docx You don't often get email from dillon@fertilegroundconservancy.org. Learn why this is important [EXTERNAL ] Nick, Please find attached supplemental written testimony submitted on behalf of Fertile Ground Conservancy in the above-referenced proceedings. The submission raises additional arguments arising from FGC's review of the Planning Commission's February 18, 2025 Final Order on PDT 24-1 / ST 24-3, and from newly received regulatory documentation from the U.S. Army Corps of Engineers. Attachments: 1. FGC Supplemental Written Testimony (PDF 25-01 / SDR 25-02) 2. Exhibit A — U.S. Army Corps of Engineers Approved Jurisdictional Determination, CENWP-ODG, NWP-2022-30, dated July 25, 2025 Please confirm receipt and that both attachments have been added to the record. FGC previously requested notice of the Hearings Official's decision; that request stands. Thank you. Dillon Thomson Executive Director, Fertile Ground Conservancy PO Box 11262, Eugene, OR 97440 dillon@fertilegroundconservancy.org 541-515-7747 SUPPLEMENTAL WRITTEN TESTIMONY OF FERTILE GROUND CONSERVANCY In the Matter of: Appeal of Planning Director's Decision Applications: PDF 25-01 (Final PUD) and SDR 25-02 (Standards Review) Braewood Hills 3rd Addition — Tax Lot 18-04-11-12 / 00200 Eugene, Oregon Submitted to: David Doughman, Hearings Official Via: Nick Gioello, Associate Planner (ngioello@eugene-or.gov) Date: May 6, 2026 I. INTRODUCTION AND STANDING Fertile Ground Conservancy (FGC) is a 501(c)(3) land trust dedicated to the protection and defense of wild places in the Cascadia region, with a specific conservation focus on waterways, wetlands, riparian corridors, and associated listed-species habitat. FGC submitted written testimony in this proceeding on April 29, 2026, and has standing as an organization that submitted written comments in the original proceeding (EC 9.7605(1)(d)) and is adversely affected by the proposed development's impacts on Videra Creek, a tributary of Amazon Creek and the Long Tom River within FGC's primary conservation area (EC 9.7605(1)(f)). This supplemental submission raises additional arguments based on FGC's review of the Planning Commission's Final Order on the Tentative PUD appeal (PDT 24-1 / ST 24-3, February 18, 2025) and newly received regulatory documentation from the U.S. Army Corps of Engineers, attached as Exhibit A. II. THE FINAL PUD RECORD DOES NOT DEMONSTRATE CONFORMANCE WITH BINDING TENTATIVE PUD CONDITIONS Under EC 9.8365(1), the final PUD plan must conform with the approved tentative PUD plan and all conditions attached thereto. The Planning Commission's February 18, 2025, Final Order imposed 27 conditions of approval on the Tentative PUD. FGC submits that the Final PUD record does not appear to demonstrate conformance with at least three of those conditions. Condition 18 (verbatim): "Prior to final PUD approval, the applicant shall obtain Type II Standards Review approval for the proposed public street extension of Randy Lane and any other utility crossings or other allowed improvements within the protected /WR conservation area, subject to the applicable standards at EC 9.4900–9.4980." Condition 18 is a condition precedent: it requires that the Type II Standards Review approval — subject to the EC 9.4900–9.4980 /WR Water Resources Conservation Overlay standards, for the Randy Lane extension and any other crossings or allowed improvements within the /WR conservation area — be obtained before the Planning Director could issue Final PUD approval. The operative question is binary: is the Type II Standards Review approval decision in the record, and is it dated prior to the Final PUD approval? If the Final PUD record does not contain the Standards Review decision, conformance with Condition 18 has not been established. FGC's understanding from the April 22, 2026, staff memorandum is that /WR construction-practice compliance for the /WR-area improvements was not fully demonstrated on the public record at this stage and instead was anticipated to be addressed through a Performance Agreement. Regardless, the dispositive question for Condition 18 is whether the Type II Standards Review decision exists in the record and predates the Final PUD decision. Condition 19 (verbatim): "All future building permits for Lots 30 through 35 shall depict the Goal 5 resource and its 40-foot setback from top of bank and shall include site plans showing the location of protective fencing subject to the applicable standards at EC 9.4920–9.4930." Condition 19 fixes the operative protective setback for the Goal 5 stream resource at 40 feet from the top of bank for Lots 30–35 — the lots closest to the protected stream corridor — at the building permit stage. This is consistent with EC 9.4920(1)(c), which establishes a 40-foot conservation setback from the top of high bank for Category C streams. The Final PUD plans must not conflict with this setback treatment. FGC requests the Hearings Official confirm that the Final PUD plans are consistent with Condition 19 and that the Goal 5 resource and 40-foot setback are correctly depicted and not contradicted. Condition 22 (verbatim): "No site alteration is allowed prior to final PUD approval. This prohibition includes site grading and the removal of trees and other vegetation, as well as any impacts to wetlands and the protected stream on the subject property including changes to the existing drainage pattern. Any such alterations shall only be allowed subject to permit review and approval, and erosion control measures as required for the proposed work." Condition 22 prohibits site grading, vegetation removal, wetland impacts, and drainage alteration prior to final PUD approval. EC 9.7630(3) provides that the action of the appeal review authority is final. Because the Hearings Official has not yet issued a decision on this appeal, the final city-level action on the Final PUD is not yet complete. There is a strong argument that "prior to final PUD approval" in Condition 22 means prior to the Hearings Official's ruling. FGC recognizes the City portal may display an effective date for the Planning Director's decision; Condition 22 is keyed to "final PUD approval," and EC 9.7630(3) makes the appeal review authority's action the final city-level action. Any site grading, clearing, wetland disturbance, or drainage alteration before that ruling may violate a binding condition of the Tentative PUD approval, depending on how 'final PUD approval' is interpreted in Condition 22. FGC requests that this question be addressed on the record and that the applicant be notified of Condition 22's continued applicability during the pendency of this appeal. III. GOAL 5 WETLAND SETBACKS UNDER EC 9.4920 — AMA-5A AND AMA-5B The City's adopted Goal 5 Water Resources Conservation Plan ESEE Conclusions Summary Table identifies wetland sites in the Videra Creek and Hawkins vicinity. Specifically: AMA-5A ("West Eugene Uplands wetland at Videra Ck," 0.16 acres) is designated Category B Wetland, Limit Conflicting Uses, with a 25-foot conservation setback. AMA-5B ("West Eugene Uplands wetland at Videra Ck," 1.00 acres) carries the same designation. AMA-4 ("West Eugene Uplands wetland at Hawkins," 1.44 acres) is designated Fully Allow Conflicting Uses with no setback. To the extent any of the delineated wetland features on Tax Lot 18-04-11-12 / 00200 correspond to AMA- 5A or AMA-5B — or any other Category B wetland designation under the City's adopted Goal 5 program — EC 9.4920(2)(b) requires a 25-foot conservation setback measured from the jurisdictional wetland boundary. This setback operates independently of the stream setback established by Condition 19. Where a Category B wetland setback applies, the /WR conservation area is the union of the stream setback footprint and the wetland setback footprint, consistent with the combined-footprint framework of EC 9.4920(3): any area within 25 feet of the AMA-5A or AMA-5B boundary is within the /WR conservation area regardless of its distance from the stream. FGC requests that the record confirm which, if any, of the delineated on-site wetland features correspond to AMA-5A, AMA-5B, or AMA-4, and that the Final PUD plans reflect the applicable setbacks accordingly. The record does not appear to include a combined setback analysis — specifically, a plan sheet or exhibit showing both the 40-foot stream setback line and any applicable Category B wetland setback line(s) — addressing both the Goal 5 stream setback and any applicable Goal 5 wetland setbacks independently. IV. USACE APPROVED JURISDICTIONAL DETERMINATION — WETLAND 2B FGC recently received an Approved Jurisdictional Determination (AJD) issued by the U.S. Army Corps of Engineers, Portland District, dated July 25, 2025 (reference: CENWP-ODG, NWP-2022-30), attached as Exhibit A. The AJD identifies Wetland 2B on the subject property as a federally jurisdictional Waters of the United States. According to the AJD, all other delineated wetland features on the property were determined to be non-jurisdictional. This AJD post-dates the City's Tentative PUD approval process and was not part of the analytical baseline on which prior approvals relied. The federal jurisdictional status of Wetland 2B means that any fill or disturbance of that feature requires a Section 404 permit from the Corps of Engineers. FGC has not located evidence in the City record that the applicant has obtained a Section 404 authorization for any proposed disturbance of Wetland 2B, and requests the applicant and City identify whether such authorization exists and how the jurisdictional status of Wetland 2B is being incorporated into the project's avoidance, minimization, and permitting posture. V. REQUESTS FGC respectfully requests that the Hearings Official: (1) Confirm on the record whether a Type II Standards Review approval under EC 9.4900–9.4980 was obtained and is documented in the record prior to the Planning Director's Final PUD decision. If it is not, reverse or remand the decision on that basis. (2) Confirm whether any on-site wetland features are designated Category B wetlands under the City's adopted Goal 5 program, and if so, confirm that the 25-foot conservation setback required by EC 9.4920(2)(b) is reflected in the Final PUD plans and does not conflict with them. (3) Address on the record whether Condition 22's site alteration prohibition applies during the pendency of this appeal, and if so, notify the applicant accordingly. (4) Accept Exhibit A (USACE Approved Jurisdictional Determination, CENWP-ODG, NWP-2022-30, July 25, 2025) into the record and direct the applicant and City to confirm the permitting posture with respect to Wetland 2B. Respectfully submitted, Dillon Thomson Executive Director, Fertile Ground Conservancy PO Box 11262, Eugene, OR 97440 info@fertilegroundconservancy.org 541-515-7747 Exhibit A: U.S. Army Corps of Engineers Approved Jurisdictional Determination, CENWP-ODG, NWP- 2022-30, dated July 25, 2025 (attached) DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, PORTLAND DISTRICT P.O. BOX 2946 PORTLAND, OR 97208-2946 CENWP-ODG 25 July 2025 MEMORANDUM FOR RECORD SUBJECT: U.S. Army Corps of Engineers (Corps) Approved Jurisdictional Determination in accordance with the “Revised Definition of ‘Waters of the United States’”; 88 FR 3004 (18 January 2023) as amended by the “Revised Definition of ‘Waters of the United States’; Conforming” 88 FR 61964 (8 September 2023) ,1 NWP- 2022-30 2 BACKGROUND. An Approved Jurisdictional Determination (AJD) is a Corps document stating the presence or absence of waters of the United States on a parcel or a written statement and map identifying the limits of waters of the United States on a parcel. AJDs are clearly designated appealable actions and will include a basis of JD with the document.3 AJDs are case-specific and are typically made in response to a request. AJDs are valid for a period of five years unless new information warrants revision of the determination before the expiration date or a District Engineer has identified, after public notice and comment, that specific geographic areas with rapidly changing environmental conditions merit re-verification on a more frequent basis.4 On 18 January 2023, the Environmental Protection Agency (EPA) and the Department of the Army (“the agencies”) published the “Revised Definition of ‘Waters of the United States,’” 88 FR 3004 (18 January 2023) (“2023 Rule”). On 8 September 2023 the agencies published the “Revised Definition of ‘Waters of the United States’; Conforming”, 88 FR 61964 (8 September 2023) which amended the 2023 Rule to conform to the 2023 Supreme Court decision in Sackett v. EPA, 598 U.S. 651, 143 S. Ct. 1322 (2023) (“Sackett”). This Memorandum for Record (MFR) constitutes the basis of jurisdiction for a Corps AJD as defined in 33 CFR § 331.2. For the purposes of this AJD, we have relied on Section 10 of the Rivers and Harbors Act of 1899 (RHA),5 the 2023 Rule as amended, 1 While the Revised Definition of “Waters of the United States”; Conforming had no effect on some categories of waters covered under the CWA, and no effect on any waters covered under RHA, all categories are included in this Memorandum for Record for efficiency. 2 When documenting aquatic resources within the review area that are jurisdictional under the Clean Water Act (CWA), use an additional MFR and group the aquatic resources on each MFR based on the TNW, the territorial seas, or interstate water that they are connected to. Be sure to provide an identifier to indicate when there are multiple MFRs associated with a single AJD request (i.e., number them 1, 2, 3, etc.). 3 33 CFR § 331.2. 4 Regulatory Guidance Letter 05-02. 5 USACE has authority under both Section 9 and Section 10 of the Rivers and Harbors Act of 1899 but for convenience, in this MFR, jurisdiction under RHA will be referred to as Section 10. CENWP-ODG SUBJECT: 2023 Rule, as amended, Approved Jurisdictional Determination in Light of Sackett v. EPA, 143 S. Ct. 1322 (2023), NWP-2022-30 as well as other applicable guidance, relevant case law, and longstanding practice in evaluating jurisdiction. 1. SUMMARY OF CONCLUSIONS. a. Provide a list of each individual feature within the Review Area and the jurisdictional status of each one (i.e., identify whether each feature is/is not a water of the United States and/or a navigable water of the United States). i. Wetland 1, non-jurisdictional ii. Wetland 2, non-jurisdictional iii. Wetland 2B, jurisdictional iv. Wetland 2C, non-jurisdictional v. Wetland 3, non-jurisdictional vi. Wetland 4, non-jurisdictional vii. Wetland 5, non-jurisdictional 2. REFERENCES. a. “Revised Definition of ‘Waters of the United States,’” 88 FR 3004 (18 January 2023) (“2023 Rule”) b. “Revised Definition of ‘Waters of the United States’; Conforming” 88 FR 61964 (8 September 2023) c. Sackett v. EPA, 598 U.S. 651, 143 S. Ct. 1322 (2023) d. “Memorandum on LRB-2021-01386. U.S. Environmental Protection Agency and the Office of the Assistant Secretary of the Army for Civil Works at the U.S. Department of the Army (16 February 2024).” e. “Memorandum To The Field Between The U.S. Department Of The Army, U.S. Army Corps Of Engineers And The U.S. Environmental Protection Agency Concerning The Proper Implementation Of ‘Continuous Surface Connection’ Under The Definition Of “Waters Of The United States” Under The Clean Water Act” (March 12, 2025) 2 CENWP-ODG SUBJECT: 2023 Rule, as amended, Approved Jurisdictional Determination in Light of Sackett v. EPA, 143 S. Ct. 1322 (2023), NWP-2022-30 3. REVIEW AREA. The Review Area is 15.50 acres (ac) and includes Tax Lot 1804111200200 in Eugene, Lane County, Oregon, Latitude / Longitude: 44.0239850°, -123.1358888°. 4. NEAREST TRADITIONAL NAVIGABLE WATER (TNW), THE TERRITORIAL SEAS, OR INTERSTATE WATER TO WHICH THE AQUATIC RESOURCE IS CONNECTED. The nearest TNW to which waters from the Review Area is connected is the Willamette River located approximately 28 miles north of the Review Area at River Mile (RM) 146. The Willamette River has been determined to be a TNW to RM 183.2 by Portland District Corps of Engineers as described in the October 1993 District list of Navigable Riverways within the State of Oregon.6 5. FLOWPATH FROM THE SUBJECT AQUATIC RESOURCES TO A TNW, THE TERRITORIAL SEAS, OR INTERSTATE WATER. Wetland 2B flows south and west through the Review Area and extends west outside of the Review Area where it directly abuts and flows into Videra Creek, an RPW, 1.86 miles to Amazon Creek, an RPW, and continues 27 miles to the Willamette River, a TNW. 6. SECTION 10 JURISDICTIONAL WATERS 7: Describe aquatic resources or other features within the Review Area determined to be jurisdictional in accordance with Section 10 of the Rivers and Harbors Act of 1899. Include the size of each aquatic resource or other feature within the Review Area and how it was determined to be jurisdictional in accordance with Section 10.8 N/A 7. SECTION 404 JURISDICTIONAL WATERS: Describe the aquatic resources within the Review Area that were found to meet the definition of waters of the United States in accordance with the 2023 Rule as amended at 33 CFR § 328.3(a)(1) through 6 This MFR should not be used to complete a new stand-alone TNW determination. A stand-alone TNW determination for a water that is not subject to Section 9 or 10 of the Rivers and Harbors Act of 1899 (RHA) is completed independently of a request for an AJD. A stand-alone TNW determination is conducted for a specific segment of river or stream or other type of waterbody, such as a lake, where upstream or downstream limits or lake borders are established. 7 33 CFR § 329.9(a) A waterbody which was navigable in its natural or improved state, or which was susceptible of reasonable improvement (as discussed in § 329.8(b) of this part) retains its character as “navigable in law” even though it is not presently used for commerce, or is presently incapable of such use because of changed conditions or the presence of obstructions. 8 This MFR is not to be used to make a report of findings to support a determination that the water is a navigable water of the United States. The district must follow the procedures outlined in 33 CFR § 329.14 to make a determination that a water is a navigable water of the United States subject to Section 10 of the RHA. 3 CENWP-ODG SUBJECT: 2023 Rule, as amended, Approved Jurisdictional Determination in Light of Sackett v. EPA, 143 S. Ct. 1322 (2023), NWP-2022-30 (a)(5), consistent with the Supreme Court’s decision in Sackett. List each aquatic resource separately, by name, consistent with the naming convention used in section 1, above. Include a rationale for each aquatic resource, supporting that the aquatic resource meets the relevant category of “waters of the United States” in the 2023 Rule as amended. The rationale should also include a written description of, or reference to a map in the administrative record that shows, the lateral limits of jurisdiction for each aquatic resource, including how that limit was determined, and incorporate relevant references used. Include the size of each aquatic resource in acres or linear feet and attach and reference related figures as needed. a. Traditional Navigable Waters (TNWs) (a)(1)(i): N/A b. The Territorial Seas (a)(1)(ii): N/A c. Interstate Waters (a)(1)(iii): N/A d. Impoundments (a)(2): N/A e. Tributaries (a)(3): N/A f. Adjacent Wetlands (a)(4): Wetland 2B: Wetlands 2 (East) and 2b were delineated and reported as two wetlands in the April 2025 wetland delineation report. Wetlands 2 (East) and 2b have no discernable division separating the two features in the Review Area. For the purposes of the Corps review and determination, Wetlands 2 (East) and 2b are evaluated as one-wetland under Wetland 2B. Wetland 2B is classified as palustrine scrub shrub (PSS) Cowardin class wetland totaling 0.536-acre near the center of the Review Area. Wetland 2B flows south into an 8-inch corrugated culvert and flows 100-feet outside of the Review Area where it exists into a channel in an offsite wetland with similar vegetation directly adjacent to and abutting Videra Creek. Flow was visible during the 30 May 2025 site visit through the adjacent wetland and into Videra Creek (RPW). Wetland 2B maintains a continuous surficial connection to a requisite (a)(1), (a)(2), or (a)(3) water. Therefore, the Corps has determined Wetland 2B is a water of the U.S. g. Additional Waters (a)(5): N/A 8. NON-JURISDICTIONAL AQUATIC RESOURCES AND FEATURES 4 CENWP-ODG SUBJECT: 2023 Rule, as amended, Approved Jurisdictional Determination in Light of Sackett v. EPA, 143 S. Ct. 1322 (2023), NWP-2022-30 a. Describe aquatic resources and other features within the Review Area identified in the 2023 Rule as amended as not “waters of the United States” even where they otherwise meet the terms of paragraphs (a)(2) through (5). Include the type of excluded aquatic resource or feature, the size of the aquatic resource or feature within the Review Area and describe how it was determined to meet one of the exclusions listed in 33 CFR 328.3(b).9 N/A b. Describe aquatic resources and features within the Review Area that were determined to be non-jurisdictional because they do not meet one or more categories of waters of the United States under the 2023 Rule as amended (e.g., tributaries that are non-relatively permanent waters; non-tidal wetlands that do not have a continuous surface connection to a jurisdictional water). Wetland 1: Wetlands 1 and 1b were delineated and reported as two wetlands in the April 2025 wetland delineation report. Wetlands 1 and 1b have no discernable division separating the two features in the Review Area. For the purposes of the Corps review and determination, Wetlands 1 and 1b are evaluated as one-wetland under Wetland 1. Wetland 1 is classified as a slope Hydrogeomorphic (HGM) class and a seasonally saturated palustrine emergent (PEME) Cowardin class wetland with small patches of scrub-shrub (PSS) totaling 3.21 acres within the northern most portion of the Review Area. Wetland 1 occurs in a sloped and previously disturbed area and is separated from the nearest relatively permanent water (RPW) (Videra Creek) by uplands. Wetland 1 does not extend offsite beyond the Review Area and is not located within a mapped floodplain. Based on a review of light detection and ranging (LiDAR) data, available topographic mapping, wetland delineation report and delineation data forms, and ground level photographs, the Corps found no evidence that Wetland 1 has a continuous surficial connection to a requisite (a)(1), (a)(2), or (a)(3) water. Therefore, the Corps has determined Wetland 1 is not a water of the U.S. Wetland 2 is classified as palustrine scrub shrub (PSS) Cowardin class wetland totaling 0.34-acre within the upper center of the Review Area. Wetland 2 occurs in a sloped and previously disturbed area and is separated from Wetland 2B and the nearest RPW (Videra Creek) by uplands. Wetland 2 does not extend offsite beyond the Review Area and is not located within a mapped floodplain. Based on a review of LiDAR data, available topographic mapping, wetland delineation report and delineation data forms, and ground level photographs, the Corps found no evidence that Wetland 2 has a continuous surficial connection to a 9 88 FR 3004 (18 January 2023) 5 CENWP-ODG SUBJECT: 2023 Rule, as amended, Approved Jurisdictional Determination in Light of Sackett v. EPA, 143 S. Ct. 1322 (2023), NWP-2022-30 requisite (a)(1), (a)(2), or (a)(3) water. Therefore, the Corps has determined Wetland 2 is not a water of the U.S. Wetland 2c is classified as palustrine scrub shrub (PSS) Cowardin class wetland totaling 0.01-acre within the center of the Review Area. Wetland 2c occurs in a sloped and previously disturbed area and is separated from Wetland 2 and the nearest RPW (Videra Creek) by uplands. Wetland 2c does not extend offsite beyond the Review Area and is not located within a mapped floodplain. Based on a review of LiDAR data, available topographic mapping, wetland delineation report and delineation data forms, and ground level photographs, the Corps found no evidence that Wetland 2c has a continuous surficial connection to a requisite (a)(1), (a)(2), or (a)(3) water. Therefore, the Corps has determined Wetland 2c is not a water of the U.S. Wetland 3 is classified as PSS Cowardin class wetland totaling 0.44-acre within the center of the Review Area. Wetland 3 occurs in a sloped and previously disturbed area and is separated from Wetland 2 and the nearest RPW (Videra Creek) by uplands. Wetland 3 extends offsite beyond the Review Area, but the Corps determined from the 30 May 2025 onsite meeting, as well as review of LiDAR data, available topographic mapping, wetland delineation report and delineation data forms, and ground level photographs, that Wetland 3 has no continuous surficial connection to a requisite (a)(1), (a)(2), or (a)(3) water. Therefore, the Corps has determined Wetland 3 is not a water of the U.S. Wetland 4 is classified as a slope HGM class and a PEME Cowardin class wetland totaling 0.01-acre south of Wetland 2c in the Review Area. Wetland 4 occurs in a sloped and previously disturbed area and is separated from Wetland 2 and the nearest RPW (Videra Creek) by uplands. Wetland 4 does not extend offsite beyond the Review Area and is not located within a mapped floodplain. Based on a review of LiDAR data, available topographic mapping, wetland delineation report and delineation data forms, and ground level photographs, the Corps found no evidence that Wetland 4 has a continuous surficial connection to a requisite (a)(1), (a)(2), or (a)(3) water. Therefore, the Corps has determined Wetland 4 is not a water of the U.S. Wetland 5 is classified as a slope HGM class and a PEME Cowardin class wetland totaling 0.01-acre west of Wetland 4 in the Review Area. Wetland 5 occurs in a sloped and previously disturbed area and is separated from Wetland 2 and the nearest RPW (Videra Creek) by uplands. Wetland 5 does not extend offsite beyond the Review Area and is not located within a mapped floodplain. Based on a review of LiDAR data, available topographic mapping, wetland delineation report and delineation data forms, and ground level photographs, the 6 CENWP-ODG SUBJECT: 2023 Rule, as amended, Approved Jurisdictional Determination in Light of Sackett v. EPA, 143 S. Ct. 1322 (2023), NWP-2022-30 Corps found no evidence that Wetland 5 has a continuous surficial connection to a requisite (a)(1), (a)(2), or (a)(3) water. Therefore, the Corps has determined Wetland 5 is not a water of the U.S. 9. DATA SOURCES. List sources of data/information used in making determination. Include titles and dates of sources used and ensure that information referenced is available in the administrative record. a. A field visits were conducted on 04 April 2025 and on 30 May 2025 by Corps’ staff. b. A desktop evaluation was completed on 07 April 2025. c. Wetland Delineation Report for Tax Lot 1804111200200, Eugene, Lane County, Oregon. Prepared by Wetlands and Wildlife LLC, dated April 11, 2025. d. Oregon Department of State Lands Local Wetlands Inventory, Accessed 07 April 2025. e. Oregon Department of State Lands Statewide Streams, Accessed 07 April 2025. f. U.S. Geological Survey National Hydrography Dataset, Accessed 07 April 2025. g. Corps Portland District October 1993 list of Navigable Riverways within the State of Oregon, Accessed 07 April 2025. h. Oregon DOGAMI LiDAR imagery, Accessed 07 April 2025. 10.OTHER SUPPORTING INFORMATION. N/A 11.NOTE: The structure and format of this MFR were developed in coordination with the EPA and Department of the Army. The MFR’s structure and format may be subject to future modification or may be rescinded as needed to implement additional guidance from the agencies; however, the approved jurisdictional determination described herein is a final agency action. 7 WETLANDS AND WILDLIFE LLC 5HYLVLRQV LQFK IHHW 'DWH 'HVFULSWLRQ 0 500 1,000 Feet SOURCE 7KHLQIRUPDWLRQRQWKLVPDSZDVGHULYHGIURP PXOWLSOHVRXUFHV$HULDO3KRWRVFRXUWHV\RI /DQH&RXQW\VWUHDPLQJGDWD *RRJOH(DUWK  5RDGFHQWHUOLQHVWD[ORWVDQG$3,FRXUWHV\RI/&2* &RQWRXUVGHULYHGIURP'2*$0,/L'$5'DWD 1$9' *HRLG$ 4XHVWLRQVUHJDUGLQJSURGXFWLRQRIWKLVPDS FDQEHVHQWWR%ULDQ0HLHULQJ EULDQ#ZHWODQGVDQGZLOGOLIH//&FRP )HDWXUHVDUHPDSSHGWRZLWKLQPHWHURIWKHLU WUXHORFDWL RQ Legend REVIEW $5($ R$ 3URMHFW1XPEHU  32%R[ (XJHQH25 :HWODQGVDQG:LOGOLIH//& VICINITY MAP-EUGENE EAST QUAD 'UDZQ%\ %70 City of Eugenel, OR KWWSZZZZHWODQGVDQGZLOGOLIH//&FRP  Map and Taxlots 1804111200200 REUSE OF THESE PLANS BY A THIRD PARTY, THE THIRD PARTY SHALL HOLD WETLANDS AND WILDLIFE LLC HARMLE SS. Eugene, OR 'DWHUHY WETLANDS AND W ILDLIFELLC, © 2018 WETLANDS AND WILDLIFE LLC N ° EXPRESSLY RESERVE ITS COMMON LAW COPYRIGHTAND OTHER PROPERTY RIGHTS IN THESE PLANS. THESE PLANS ARE NOT TO BE REPRODUCED, CHANGED, OR COPIED IN ANY FORM OR MANNER WHATSOEVER, NOR ARE THEY TO BE ASSIGNED TO A THIRD PARTY WITHOUT FIRST OBTAINING THE WRITTEN PERMISSION AND CONSENT OFWETLANDS ANDWILDLIFE LLC. INTHE EVENTOF UNAUTHORIZED Figure &KHFNHG 1 ¬¬¬¬¬¬¬¬¬¬¬¬1025 1015 1005 995 9 85 975 965 ---------------------------------------------------------------------------------------------------------------------------Wetlands extend from offsite Wetlands extend from offsite road cut concentrates hydrology supporting W3 Wetlands extend offsite Wetland 1a is a swale intercepting upslope hydrology ALL PLOTS AND WETLAND BOUNDARIES ARE ACCURATE TO 1-METER BASED ON REAL TIME ARROW 100 GPS PROCESSING AND 2024/2025 GROUND TRUTHING. 4152 4600 445 3100 3200 3300 3400 3500 3900 1300 5801 5600 5700 5800 6600 202 203 204 205 206 207 208 209 210 223 300 HAWKINSLN BLACKTAILDR RANDY LN 29TH A V E MYSTICLN RIDGEMONTDRRAN D Y LN SUNCRESTAVE 955 945 935 925 915 905 895 885 875 865 855 84 5 835 825 815 80 5 795 785 775 765 755 745 1035 1015 965 955 835 805 775 75 5 735 WETLAND 1 3.202 ACRES WETLAND 2 (EAST) 0.52 ACRES WETLAND 3 0.428 ACRES WETLAND 2 (WEST) 0.34 ACRES WETLAND 4 0.009 ACRESWETLAND 5 0.009 ACRES WETLAND 2C 0.013 ACRES WETLAND 1B 0.012 ACRES WETLAND 2B 0.016 ACRES Lot 200 «4 «2 «3 «10 «5 «7«6 «8 «11 «9 «1 «12 SP 24(W) SP 21(U) SP 22(W) SP 42(W) SP 43(U) SP 47(U) SP 46(W) SP 35(W) SP 03(W) SP 29(U)SP 30(W) SP 39(U) SP 50(U) SP 37(U) SP 31(U) SP 45(U) SP 44(W) SP 38(W) SP 36(W) SP 49(W) SP 51(W) SP 33(W) SP 34(U) SP 01(U) SP 02(W) SP 04(U) SP 07(W) SP 08(U) SP 27(U) SP 28(W) SP 23(U) SP 20(W) SP 11(U) SP 10(W) SP 12(W) SP 18(W) SP 19(W) SP 06 (W) SP0 5(U) SP 13(U) SP 48(U) Name acres wetland 1 3.202 wetland 1b 0.012 wetland 2 (east) 0.52 wetland 2 (west) 0.34 wetland 2b 0.016 wetland 2c 0.013 wetland 3 0.428 wetland 4 0.009 wetland 5 0.009 Wetland Acreage Summary 0 10050 Feet Legend RA Removed from 2024 SA (probable wetland) Adjacent taxlots Wetlands and Other Waters ---Resampled Points "V¸ Ground Photo Points and Direction 2018 !P Culvert 5 ft contour SOURCE The information on this map was derived from multiple sources. Aerial Photos courtesy of Lane County streaming data (Google Earth, 2014). Road centerlines, taxlots and API courtesy of LCOG. Contours derived from DOGAMILiDAR Data (NAVD88, Geoid 12A).Questions regarding production of this map can be sent to Brian Meiering: brian@wetlandsandwildlifeLLC.com Features are mapped to within 1 meter of their true location. Revisions # Date Description Project Number:Drawn By© 2025 WETLANDS AND WILDLIFE LLC Checked BTM PICULELL WETLAND DELINEATION MAPCity of Eugenel, OR Map and Taxlot 1804111200200 (part) Eugene, OR 0078Date rev5: 6/30/2025 Wetlands and Wildlife LLC P.O. Box 50878Eugene, OR 97405541.214.6051http://www.wetlandsandwildlifeLLC.comWETLANDS AND W ILDLIFELL C,EXPRE SSLY RE SERVE ITS COMMON LAW COPYRIGH T AN D OTHER PROPE RTY RIGHTS IN THESE PLAN S.THESE PL ANS A RE N OT TO BE RE PRODUC ED, CHANGED, OR COPIE D IN ANY FORM OR MANNERWHATSOEVER, NOR ARE THEY TO BE ASSI GNED TO A THIRD PARTY WITHOUT FIRST OBTAI NING THE WRITTEN PERMISSI ON AND C ONS ENT OF WETLAND S A ND WILDLI FE LLC. IN THE EVENT OF UNAUTHORIZEDREUSE OF THES E PLANS BY A THIRD PARTY, TH E THIRD PA RTY SHALL HOLD WETLANDS AND WILDLIFE L LCHAR MLE SS. WETLANDS AND WILDLIFE LLC ¹ Figure 6