HomeMy WebLinkAboutDecisionBraewood Hils Third Addition (SDR 25-02 and PDF 25-01)
Applicant: Piculell Properties, LLC
Applicant's Representative: Carol Schirmer, Schirmer Consulting, LLC
Lead City Staff: Nicholas Gioello, Associate Planner
Relevant Dates: Application Submitted: September 5, 2025
Application Complete: January 29, 2026
Decision Issued: March 15, 2026
Map No. / Tax Lot(s): 18-04-11-12 / 00200
Zoning: R-1/WR Low -Density Residential with /PD Planned Unit
Development and /WR Water Resources Conservation
Overlays
Development Area: Approximately 15.47 Acres
Location: Located on the east side of Hawkins Lane and northeast
of Randy Lane
Application Details
The applicant is requesting approval of a Final Planned Unit Development (PUD) application,
which received tentative PUD approval on DATE (City File: PDT 24-01). The Tentative PUD
approved the creation of 39 residential lots, the extension of Randy Lane, private streets, and
other associated infrastructure improvements and was subject to 27 conditions of approval.
The tentative approval was run concurrently with the Tentative Subdivision (City File: ST 24-3).
A Final Subdivision application (City File: SF 25-3) was also submitted, but is not being reviewed
concurrently with these applications.
In order to facilitate infrastructure improvements, the applicant is also requesting concurrent
approval of a Standards Review application. Specifically, the scope of the Standards Review
application is the construction and extension of Randy Lane across Videra Creek, a Goal 5
protected riparian resource. The project will include grading and construction of a public road
across the resource and the removal of existing plants and vegetation to be replaced with
March 2026 Findings & Decision of the Planning Director Page 1 of 28
Braewood Hill 3r1 Addition (SDR 25-2 and PDF 25-1)
native vegetation. The project area spans a small section of the resource in the southwest
portion of the property.
Specifically, the project is within the area of Upland Resource E35 A and Wetland Resource
AMA-513. Videra Creek is a Category B stream. While the protected creek crosses the entire
property in the southern portion of the site, the scale of impact within the conservation area is
limited to approximately 1,105 square feet of disturbance.
In accordance with Eugene Code Sections (EC) 9.4930(2)(c), the removal of non-native and
invasive plants and the planting of native plants are an allowed use. In accordance with EC
9.4930(3)(b), the construction of public streets is subject to a Standards Review (EC 9.8460 —
9.8472) and the standards at EC 9.4980 /WR Water Resources Conservation Overlay Zone
Development Standards (1) through (11). While there are other protected resources within the
remainder of the subject property, at this time, the only activity that requires a Standards
Review is the construction of Randy Lane. All other protected riparian and wetland resources
will be protected and reviewed with individual development applications over time.
Additional details of the proposal are included in the applicant's written statement, on
proposed site plans and in other supporting documentation, all of which are included as part of
the public record and located in the application file for reference.
Procedure, Public Notice, and Agency Referrals
Application Submitted September 5,. 2025
Application Complete
Public notice of the subject application was mailed in accordance with EC 9.7210. Twenty-two
concerned citizens submitted testimony during the public comment period, all of which are
available in the file record for reference. Many of the comments submitted shared the same or
very similar concerns regarding several key issues. The following testimony summary and
review will focus on the general topics of concern or application deficiency as expressed
throughout the various testimonies received rather than a review of each individual piece of
testimony. Testimony concerns, questions or statements of application deficiencies will be
listed in bold font and staff analysis will be in regular font.
• Increased traffic and limited ability for emergency services response.
Eugene Springfield Fire Marshal's Office reviewed the proposed plans for both this current
application and the approved tentative planned unit development (PUD) and tentative
subdivision (City File # PDT 24-1 and ST 24-3) and expressed no concerns related to emergency
service access to the site. Fire Marshal's Office comments dated February 25, 2026 (included as
Attachment A), will require "No parking -Fire Lane" signage on both sides of the private streets
in the development to ensure adequate widths for emergency vehicular movements within the
March 2026 Findings & Decision of the Planning Director Page 2 of 28
Braewood Hills Third Addition (SDR 25-02 & PDF 25-01)
site. As indicated in the July 2024 tentative PUD staff report, Public Works staff confirmed that
safe and adequate transportation systems are found in the vicinity and adjoining public streets
including Hawkins Lane and Randy Lane are already built to applicable street standards.
Therefore, as this proposal is the finalization of the previously approved PUD, this proposal will
not general any additional concerns related to this topic that were not previously argued during
the Tentative PUD process.
• Land is not stable on the hillside.
As discussed in the July 2024 tentative PUD staff report the site is exempt from the standards of
EC 9.6710 Geological and Geotechnical Analysis due to the status of the subject property being
on the City's adopted Goal 5 inventory and exempted from the standards per EC 9.6710(3)(f).
However, geotechnical analysis will be required during future permitting processes, including
but not limited to the Privately Engineered Public Improvement permit process, site
development permits, and building permits to the extent that public improvement standards
and building code requirements apply in subsequent stages of development. Therefore, as this
proposal is the finalization of the previously approved PUD, this proposal will not general any
additional concerns related to this topic that were not previously argued during the Tentative
PUD process.
• The site should include a park area, also walking trails that connect Melvin Miller Park,
Skyview City Park, and Videra Park.
The tentative PUD approval was approved under the Housing/Clear and Objective standards of
EC 9.8325, which do not require the inclusion of parks or walking trails within the development.
This application for final PUD requires substantial conformance with the tentative PUD
approval. Therefore, there is no ability to require a park within the site as part of this approval
process.
• The Final PUD does not conform to the tentative PUD approval concerning the Joint
Access Management agreement and the various Joint Access Easements, Conditions 5,
6, 15 and 16. The Final PUD does not conform to the tentative PUD Condition 7, Public
Utility Easement. The Final PUD does not conform to the tentative PUD Condition 26 —
stormwater compliance with EC 9.6796.
Section 2 of this decision provides full analysis of how this final PUD application is in
conformance with each of the above listed conditions of approval of the tentative PUD. The
findings for Condition of Approval 5 include an additional condition for compliance prior to final
plat. Condition 26 required the applicant to submit updated application materials that
demonstrate compliance with EC 9.6796. The findings for Condition of Approval 6 include an
additional condition for compliance prior to final plat.
March 2026 Findings & Decision of the Planning Director Page 3 of 28
Braewood Hills Third Addition (SDR 25-02 & PDF 25-01)
• Concerns with shared driveways with and cars parked in a single driveway, the Joint
Access & Maintenance Agreement (JAM) for the shared driveways, the variable widths
and the maintenance responsibilities. The driveways that are too narrow for
emergency vehicle access and is a risk to public safety.
Section 2 of this decision provides full analysis of how this final PUD application is in
conformance with each of the above listed conditions of approval of the tentative PUD. The
findings for Condition of Approval 5 regarding the JAM include an additional condition for
compliance prior to final site plan approval. The Fire Marshal's Office has reviewed the plans
and provided referral comments, which did not express concerns with the driveway widths or
indicate a risk to public safety. These referral comments are included in the record materials.
Further, as this proposal is the finalization of the previously approved PUD, this proposal will
not generally add any additional or new concerns related to this topic that were not previously
argued during the Tentative PUD process.
• Compliance with the required 25-foot buffer established at EC 9.4920(2)(b) has not
been clearly demonstrated. EC 9.4920(3) Combined conservation footprint for wetland
and stream Natural resource identification requirements under the /WR Overlay.
No development is currently proposed within the Conservation Area identified above that is not
already being considered as part of this Standards Review application. Other development, such
as the development of individual lots over time will be required to demonstrate compliance
with the applicable setbacks for protected riparian resources located through the development
site. This approval process does include any approval criteria that would warrant or otherwise
mandate the mapping of the 25-foot buffer as part of this specific process.
• Violates Eugene Code 9.4930(3)(e)(3), which requires that all excavated areas be
backfilled with existing native soil.
This code section applies to new underground utility lines within conservation areas and
requires backfilling to the existing grade with native soil to minimize the impact to the
conservation area. However, EC 9.4930(3)(b) allows for the construction of public streets and
public utilities subject to the standards at EC 9.4980, which are addressed in Section 1 of this
Decision, therefore EC 9.4930(3)(e)(3) would not be applicable.
• Did not adequately identify wetlands within 50 feet of property lines.
All known, existing wetlands are shown on the plans and in relation to proposed lot lines. Most
of the wetlands on the site are listed as unprotected. The only wetland identified for protection
exists in the same area as the protected Videra stream. When it comes to the Goal 5 riparian
March 2026 Findings & Decision of the Planning Director Page 4 of 28
Braewood Hills Third Addition (SDR 25-02 & PDF 25-01)
resources, it is common for a stream to also have related wetlands in nearly the same location.
The site plans show the top of bank of the stream as it begins on the east boundary of the site
and travels towards the west boundary of the site where it enters an existing underground
culvert under the areas where Randy Lane is proposed and exits in the City's Videra Park.
• Does not identify trees by species and dimension or map critical root zones for trees
within conservation areas and how these trees and their root zones will be protected.
Th applicant has identified three trees located within the area of proposed disturbance and
identified for removal as it relates to the Standards Review application. All trees on the site are
shown on sheet ST2.0. The closest tree to the area of disturbance within the steam setback is
located in Lot 33, south of the steam, and is approximately 270 feet from the edge of proposed
disturbance. This tree would need to have a diameter at breast height that well exceeds 180
inches to have any possibility of impact to its critical root zone. Trees of this extreme size are
not known to exist in the area. Therefore, unless evidence is provided to the contrary, it is not
possible for the critical root zone of this tree to be affected by the proposed street and area of
disturbance.
• The site plan does not properly identify/indicate all trees by species and dimension.
There needs to be a complete and comprehensive inventory of all trees on the
property. Native Willamette White Oaks on the property should be identified and
protected. Deny the applications because there is less than 2% of the Willamette
Valley's oak woodlands remaining and this ecosystem is critically endangered.
The site plans do identify the location of existing trees on the site. There are no criteria with
final PUD approval that requires an inventory of all trees on the property. As discussed in the
tentative PUD staff report (PDT 24-1 and ST 24-3) the Tree Preservation and Removal Standards
at EC 9.6885 will apply directly at the time of future development on individual lots. Depending
on the timing and scope of tree removal, lot size, and other factors, a separate tree removal
permit may be required per EC Chapter 6, which will be reviewed at the time of building
permits on each individual lot.
• Has not demonstrated compliance with construction practices within conservation
areas per EC 9.4980(4).
This standard is addressed in Section 1 of the Decision, and two additional conditions of
approval are required to ensure consistency with this standard.
• Concern with impacts to Videra Park, no mapped combined conservation footprint
extending across the shared boundary, no tree identification and critical root zone
mapping near the property line, and no hydrological analysis of how the Randy Lane
extension and associated swales may alter water flow affecting park -side trees.
March 2026 Findings & Decision of the Planning Director Page 5 of 28
Braewood Hills Third Addition (SDR 25-02 & PDF 25-01)
The applicant is required to analyze trees within the Conservation Area on their property, which
they have performed as required. No off -site tree analysis is required under the land use code.
As noted in Section 1 of the decision, the applicant does need to include and replant any
Conservation Area to the south of the road, in between the property line and the southern
edge of the sidewalk/road. This small strip is within a Conservation Area. There are no trees
identified within the southern edge of the sidewalk/road impacted area of the proposed
standards review and off -site trees are not part of the review for this application. The applicant
proposes stormwater management in accordance with the requirements of Eugene Code, as
was evaluated during the Tentative PUD process. the Videra stream will continue to utilize the
existing stormwater drainage pipe that existed prior to this proposal. The road area subject to
this standards review will not reroute water flowing through this existing stormwater drainage
pipe. Stormwater from the street will be managed by the designed stormwater management
areas consistent with Eugene Code.
• No specifics about how chemical products, harmful substances and other materials are
prevented from infiltrating the wetland, stream and Videra Park.
In Section 1 of the Decision, EC 9.4980(4)(b) addresses this issue and a new condition of
approval is required to ensure consistency with this standard.
• The extension of Randy Lane, as well as the swales to the north of it, must be
prevented from denying critical water for the trees on the other side of the property
line in Videra Park.
There are no approval criteria in the Final PUD or the Standards Review that would require the
applicant to monitor the health of trees not located on their property.
• The map labels the wetland as Wetland 2B and shows clearly that the wetland is wider
than the conservation setback on the developer's site map and thus the setback does
not meet the 25-foot setback requirement. The proper /WR conservation area has not
been determined, as the /WR conservation area for the wetlands was not calculated
or mapped at all. Nor was the total footprint combined. The City should insist that a
25-foot setback for the wetland be combined with the 40-foot setback for the
Category C stream. In some places, this revised setback will be more than that in the
current the site plan.
This Standards Review is looking only at the impacted area of the Conservations Area where it is
impacted by the construction and extension of Randy Lane. When it comes to the Goal 5
riparian resources, it is common for a stream to also have related wetlands in nearly the same
location. The extent of the construction is limited to the southern portion of the creek, where
March 2026 Findings & Decision of the Planning Director Page 6 of 28
Braewood Hills Third Addition (SDR 25-02 & PDF 25-01)
the wetlands closely overlay the banks of the creek. The Conservation Area for the creek is 40
feet on either side, whereas the wetland setback is 25 feet. At this impacted location (i.e. the
extent of Standards Review), the 40-foot setback is greater than the extent of the 25-foot
setback and therefore, it receives the same level of protection. The mapped 25-foot buffer
around the remaining wetland is not something that can be required under the approval
criteria for these applications. However, staff understands that it would be helpful for the
future development of the individual lots to know where the 25-foot buffer is located, as
opposed to remapping it for every permit. Therefore, staff recommends that the applicant
include this buffer on their final site plan, though we lack the direct approval criteria to
mandate the inclusion of the buffer on their site plan.
• How will snow removal be coordinated. What happens if the designated responsible
lot does not sell. What enforcement mechanism exists if maintenance lapses?
Snow removal on the private streets and driveways would be the responsibility of individual lot
owners. Once the final plat is approved and recorded with Lane County and the State of
Oregon, the lots would then become legal lots owned initially by the developer and could be
sold either individually or in whole to another developer. Enforcement of maintenance
responsibilities for private accessways and streets would be through civil actions between
private parties and not the responsibility of the City.
• Condition of Approval 11, EWEB documentation has not been provided.
This condition of approval is required to be met during the Final Subdivision process and
approval of the final plat and not required at this stage of approval.
• The Removal/Fill wetland removal in Lot 38 should be disallowed per EC 9.6715.
This code section restricts heights in the Skinner Butte area and is not applicable to this site.
• EC 9.8055 requires that access points for proposed lots must be shown on site maps
and development maps, and many of the lots on these maps do not show how access
points will be sited after setbacks and conservation areas have been created.
This code section is the General/Discretionary approval criteria for Cluster Subdivisions and is
not applicable to this site.
The Planning Division also provided information concerning the application to other
appropriate City departments, and neighborhood services. Any referrals received may be
discussed and summarized in the evaluation below and are incorporated herein by reference. A
copy of any referrals and public comments are included in the application file for reference.
March 2026 Findings & Decision of the Planning Director Page 7 of 28
Braewood Hills Third Addition (SDR 25-02 & PDF 25-01)
Evaluations
This concurrent request includes two applications, a Standards Review and Final Planned Unit
Development. Both the Standards Review and Final Planned Unit Development applications are
subject to the Type II land use application procedures, which are primarily addressed at EC
9.7200-9.7230.
Section 1 of this decision addresses the Standards Review application. In accordance with the
Standards Review process beginning at EC 9.8460, the Planning Director shall approve,
conditionally approve, or deny this application. The Planning Director's decision is based on the
following evaluation of the proposal in the context of determining the uses subject to Standards
Review at EC 9.4930(3) and compliance with the applicable approval criteria and related
standards listed at EC 9.8470 and EC 9.4980 /WR Water Resources Conservation Overlay Zone -
Development Standards.
Section 2 of this decision addresses the Final Planned Unit Development application. In
accordance with the Final Planned Unit Development (PUD) process beginning at EC 9.8350 the
Planning Director shall approve, conditionally approve, or deny this application. The Planning
Director's decision for Final PUD is based on the evaluation of the proposal and compliance
with the applicable approval criteria at EC 9.8365, which include conformance with the
approved Tentative PUD and its conditions of approval.
In each of the evaluations below, the applicable standards and criteria for the Standards Review
and the Final PUD are provided below (in bolded text) in two sections and include findings
addressing compliance with each.
SECTION 1 STANDARDS REVIEW EVALUATION
The areas subject to a Standards Review are those impacted portions of a Conservation Area,
when an activity explicitly requires a Standards Review approval in accordance with EC 9.4930.
This proposal includes the extension of Randy Lane and associated infrastructure, which
includes construction activities within the Conservation Area of a protected riparian resource.
The proposed construction of a public street is permitted subject to a Standards Review in
accordance EC 9.4930(3)(b).
EC 9.4930(3): Uses Subject to Standards Review Within /WR Conservation Areas. Except as
prohibited by subsection (4), or as excepted under subsection (5), within /WR conservation
areas, the following uses are permitted, subject to the standards review process beginning
with EC 9.8460 in which consistency with the specific standards referenced for each use
below shall be used as the criteria for approval.
(b) Construction of public improvements (including but not limited to streets, bridges,
paved bikeways and pedestrian paths, and public utilities) required by this land use
March 2026 Findings & Decision of the Planning Director Page 8 of 28
Braewood Hills Third Addition (SDR 25-02 & PDF 25-01)
code or specified in adopted plans. Subject to EC 9.4980 /WR Water Resources
Conservation Overlay Zone Development Standards (1) through (11).
The above code section allows for the applicant to apply for a Standards Review approval for
the construction of a public street through the Standards Review process. The applicant's
submitted materials also indicate that their proposal includes several other uses subject to
standard review; the construction of new underground utility lines, restoration of impacted
conservation areas and construction of stormwater facilities. The public improvements are
associated with public streets which were required as part of their approved Tentative Planned
Unit Development, in accordance with the land use code. As such, this proposal includes public
improvements required by the land use code, consistent with EC 9.4930(3)(b). It is worth noting
that the code section above requires a review of all development standards for the /WR overlay
zone. With a wide scope, and improvements required by the land use code, staff believes that it
is appropriate for the applicant to seek approval for the public street, private utilities,
restoration of impacted conservation areas and construction of stormwater facilities under EC
9.4930(3).
The proposed extension of Randy Lane impacts one conservation area in the southern portion
of the site where Videra Creek crosses the site and is channeled into an existing underground
12-inch storm drain that empties into abutting Videra Park southeast of the site. The street,
utility and storm drainage construction will occur over the area where the existing drainage
pipe is buried. No alteration or construction will occur within the above ground portion of the
creek located on the site.
Based on the available information, the proposed project is subject to approval of a standards
review in accordance with EC 9.8470 and the /WR Water Resource Conservation Overlay Zone
development standards EC 9.4980(1) through (11), which are provided below (in bolded text)
followed by findings.
EC 9.8470 Standards Review Approval Criteria
The decision -maker shall determine whether the application is in compliance with the
standards setout in the code section that calls for standards review.
In this case, as noted above, the proposed project is subject to the /WR Water Resource
Conservation Overlay Zone Development Standards EC 9.4980(1) through (11), which are
provided below (in bolded text) followed by findings.
EC 9.4980 /WR Water Resources Conservation Overlay Zone Development Standards
(1) Enhancement. Where the /WR conservation area is reduced, or uses are approved
within the /WR conservation area, the remaining /WR conservation area shall be
enhanced consistent with this subsection and by removing non-native plant species
and planting native plant species consistent with subsections (2) and (3) below.
March 2026 Findings & Decision of the Planning Director Page 9 of 28
Braewood Hills Third Addition (SDR 25-02 & PDF 25-01)
(a) All refuse, toxic materials and any fill that limits or decreases the capacity of the
conservation setback area to filter pollutants from runoff that flows across the
conservation setback area shall be removed (not including stormwater collected
and discharged from impervious surfaces).
In their application materials, the applicant acknowledges and states that any refuse or toxic
materials found during construction will be removed. All required fill material for the street
construction will be kept to a minimum. A stormwater treatment facility is proposed along the
eastern side of the street and is considered an area of fill within the conservation easement. As
indicated in the applicant's written narrative, the stormwater treatment facility will filter
various pollutants that flow across it and will enhance the setback area and is consistent with
this standard.
(b) Where practicable, finished grades shall encourage sheet flow of runoff across
conservation setback areas to maximize filtering and infiltration of precipitation
and runoff within conservation setback areas (not including stormwater collected
and discharged from impervious surfaces).
The applicant states and site plans show that finished grades will intentionally direct runoff
from the conservation setback area as sheet flow into a swale on the northeast side of Randy
Lane (See applicant's Sheet ST3.0). Also, as noted by the applicant, the conservation area sits at
a higher elevation and runoff naturally flows downhill into the swale. The swale is designed to
enhance pollutant filtration and promote infiltration more effectively than the current sheet
flow conditions and is consistent with this standard. Staff review of the applicant's analysis
finds their proposal to be consistent with this standard.
(c) On sites where the slope within the conservation setback area exceeds 15 percent,
measures (e.g., planting and contouring) shall be taken to slow the flow of runoff
to the maximum extent practicable (not including stormwater collected and
discharged from impervious surfaces).
In this case, the stormwater treatment facility is designed to intercept and collect existing
runoff. As designed, the gradual slopes of the stormwater treatment facility and vegetative
plantings will slow the flow of the runoff, enhancing opportunities for infiltration and pollutant
removal. Based on the applicant's proposal, their design is consistent with this standard.
(d) Non-native plants shall be permanently removed to the maximum extent
practicable and replaced with native plant species in accordance with subsection
(3) below.
The applicant notes that the area within the extent of the construction will be cleared of
vegetation. As discussed in more detail in subsection (3) below and incorporated herein by
reference, all areas impacted by this construction will be revegetated with native plant species,
consistent with this standard.
March 2026 Findings & Decision of the Planning Director Page 10 of 28
Braewood Hills Third Addition (SDR 25-02 & PDF 25-01)
(e) Except as required by EC 9.4980(2)(c), EC 9.4980(3)(d) and EC 9.4980(3)(e), site
work to enhance the conservation setback area shall be completed prior to or
concurrent with other site development, unless appropriate native plant species
are not available within that time frame.
Site work to enhance the conservation setback area will occur in conjunction with the street
construction project. The applicant notes that the installation of replacement vegetation will
occur after the street and stormwater facility are constructed as discussed in more detail at EC
9.4980(3)(d) and is consistent with this standard.
Based on the materials in the record and the above findings, the standards at EC 9.4980(1) are
met.
(2) Vegetation Removal. Vegetation removal within the /WR conservation area and
within areas removed from the /WR conservation area shall comply with the
following standards:
(a) Vegetation removal shall be limited to:
1. Plant species that are non-native and invasive;
2. Dead or dried native plants or grasses only when they constitute an imminent
fire hazard;
3. Living native or non-native vegetation, when its removal is necessary to
facilitate or encourage the growth of other native species (e.g., native wet
prairie plant species) consistent with adopted plans or policies; or
4. The minimum area of native vegetation removal necessary to accommodate
uses approved in accordance with EC 9.4930(3)(a) through EC 9.4930(3)(k), and
uses approved through an adjustment approved in accordance with EC
9.8030(21).
The applicant indicates that three non-native fruit trees and other native and non-native
vegetation will be removed only to the extent necessary to facilitate the construction of the
street and stormwater facility. The site plans and description of work demonstrate consistency
with this standard.
(b) Clearing of more than 500 square feet of vegetation must comply with Erosion
Prevention regulations for sensitive areas in EC 6.645.
The street construction will require approximately 1,015 square feet of vegetation clearing;
therefore, the following condition of approval is warranted:
1. The applicant shall obtain an Erosion Prevention permit prior to the initiation of any
development activities in the Conservation Setback as shown on the site plans.
March 2026 Findings & Decision of the Planning Director Page 11 of 28
Braewood Hills Third Addition (SDR 25-02 & PDF 25-01)
Based on the available information and condition above, this standard will be met.
(c) Any clearing of vegetation that is not within the footprint of uses approved in
accordance with EC 9.4930(3)(a) through EC 9.4930(3)(k), or uses approved
through an adjustment approved under EC 9.8030(21), must be followed by
replanting in accordance with the requirements of subsection (3) below.
All clearing of vegetation occurring outside of the footprint of the proposed scope of work will
be replanted in accordance with the standards in EC 9.4980(3), which is discussed in detail
below consistent with this standard.
The applicant's site plans only indicate that the impacted Conservation Area is located where
the road is being constructed and the area north of the road. This does not take into account
that there is Conservation Area also located on the south side of the finished road between the
road/sidewalk and the property line. As this small strip is also located within a Conservation
Area and warrants replanting consistent with this standard, the following condition is
warranted:
2. Prior to final site plan approval, the applicant shall submit a revised final site plan that
identifies the Conservation Area in between the southern property line and the
southern edge of the road and sidewalk. The revised site plans shall also show
replanting details consistent with the requirement at EC 9.4980(2)(c).
Based on the materials in the record and the above findings and condition of approval, the
standards at EC 9.4980(2) are met.
(3) Planting and Replanting. Planting or replanting within the /WR conservation area
shall comply with the following standards:
(a) Areas of existing bare soil and areas which have been cleared or graded in
accordance with subsection EC 9.4980(2) or EC 9.4980(5) shall be planted with
native plant species. Except as required in (b) and (c) below, plant species and
plant spacing used for such plantings shall be appropriate to increasing to the
greatest extent practicable the capacity of the conservation setback area to filter
pollutants from runoff that flows across the conservation setback area (not
including stormwater collected and discharged from impervious surfaces). Where
existing native vegetation already serves this function to some extent, additional
native plants shall be planted in order to augment native vegetation already
existing. Plant species selected for all plantings shall be appropriate to the site
given its topography, hydrology, soil, and existing native plant species.
The applicant has proposed revegetating the area of disturbance with vegetation identified on
the site plan by plant species, rate of application and size. The site plan lists Tuffed Hairgrass,
Meadow Barley and Prairie June Grass ground covers and four Pacific Northwest Crabapple
March 2026 Findings & Decision of the Planning Director Page 12 of 28
Braewood Hills Third Addition (SDR 25-02 & PDF 25-01)
trees for replanting. However, only Meadow Barley is listed in the City's adopted Goal 5 plant
list (Native and Non -Native Plant List, Exhibit F to Ordinance No. 20351) as appropriate for this
area. To ensure that grass and tree species are selected in accordance with the Goal 5 plant list,
the following condition is warranted:
3. Prior to site plan approval, the applicant shall submit a revised final site plan that
includes tree and plant species that are selected from the Native and Non -Native Plant
List, Exhibit F to Ordinance No. 20351.
Based on the above findings and condition of approval above, this standard will be met. For
ease of reference, Exhibit F to Ordinance No. 20351 is included as Attachment B.
(b) Planting or replanting within 25 feet of a Category B, C, or D stream within the
/WR conservation area shall include native tree or large shrub species and located
so as to provide substantial shading of the channel during times of peak solar
input.
As discussed above and conditioned at 3(a), only native plants and trees will be planted in the
conservation area. The area for proposed tree planting is to the immediate west where the
stream channel enters the existing underground culvert and will provide shade to a portion of
the channel during the afternoon hours. The small strip of Conservation Area between the
property line and the south edge of the public improvements does not warrant planting of trees
given that the extent of the channel at this location is within a culvert. Based on these findings,
the proposal is consistent with this standard.
(c) Where non-native or damaged trees are removed within 25 feet of a Category B, C,
or D stream within the /WR conservation area, they shall be replaced with native
tree or large shrub species and located so as to achieve equal or greater shading of
the channel during times of peak solar input as the trees removed.
The three existing non-native trees that were removed were located between 35 and 45 feet
from the actual stream. The four proposed replacement trees will be located approximately 10
to 20 feet closer to the stream. The increase in the number of trees, location and closer
proximity to the Goal 5 resource will increase the amount of shade to the stream and
conservation setback area during afternoon hours. Based on these findings, the proposal is
consistent with this standard.
(d) Replanting of areas cleared of existing vegetation must be completed within 90
days following the removal or clearing, unless otherwise approved by the planning
director.
The applicant indicates planting will be scheduled based on seasonal timing and plant
availability to ensure optimal restoration success. If this schedule cannot be accommodated
March 2026 Findings & Decision of the Planning Director Page 13 of 28
Braewood Hills Third Addition (SDR 25-02 & PDF 25-01)
within the 90-day timeline, a request for an extension will be submitted to the Planning
Director. To ensure this standard I met, the following condition is warranted:
4. Prior to Final PUD approval, the following note shall be added to the final site plans:
"Any disturbed areas within the Conservation Setback shall be replanted within 90 days
of any clearing or vegetation removal activities, unless otherwise approved by the
Eugene Planning Director."
Based on the above findings and condition of approval, this standard will be met.
(e) Plantings shall not adversely affect adjacent protected water resources or existing
native vegetation through shading or invasion by plant species introduced into the
setback.
The applicant's statement indicates that the selected plant species will enhance the area by
replacing non-native plants with native plants and will not adversely impact the water resource.
With the condition suggested above at EC 9.4980(3)(a) for a revised planting list, incorporated
herein by reference, the applicant's proposal will comply with the standard above due to the
existing methodology for selecting plants provided by the City's adopted Goal 5 native plant list
Based on the materials in the record and the above findings and conditions of approval, the
standards at EC 9.4980(3) are met.
(4) Construction Practices. Construction within the /WR conservation area, and within
areas removed from the /WR conservation area shall comply with the following
standards:
(a) For purposes of this subsection, heavy machinery is defined as motorized or
mechanized machinery or equipment capable of deliberately or inadvertently
damaging vegetation, or damaging or compacting soil. The following standards
shall apply to use of heavy machinery within the /WR conservation area:
1. On sites where soils are susceptible to severe compaction or structural damage
when wet or saturated, use of heavy machinery shall be limited to the period
between June 15 and September 30, unless otherwise approved by the
planning director.
2. Use of heavy machinery shall be the minimum necessary for the use or activity
and shall be restricted to those areas where its use is necessary.
The applicant states that machinery, tools, supplies and other construction materials will not be
stockpiled or stored in the /WR conservation areas. The applicant states that machinery use will
be limited to the period between June 15 and September 30 and be the minimum necessary to
complete construction.
The applicant's site plans show an area of construction within the protective setback and
includes protective fencing along the perimeter of the Conservation Area north of the road to
March 2026 Findings & Decision of the Planning Director Page 14 of 28
Braewood Hills Third Addition (SDR 25-02 & PDF 25-01)
delineate the extent of the construction impact area. The above standards are concerned with
minimizing the impact of machinery needed for the construction of a use allowed by Standards
Review approval. The applicant's plan does not show staging locations for machinery, and
provides no explanation in the written statement, likely due to the fact that the construction
will utilize the proposed road as the access for the site which is mostly located outside of any
Conservation Area. However, without that clarity in the record, the following conditions are
warranted to minimize impacts to areas that do not need to be impacted by heavy machinery
to construct the street and stormwater facility:
5. Prior to final site plan approval, the applicant shall submit a revised site plan that shows
staging area(s) for heavy machinery. Alternatively, the applicant may include a note on
the final site plan stating, "No staging areas for heavy equipment will be located within a
Conservation Area."
6. Prior to final site plan approval, the applicant shall submit a revised site plan that shows
the location of access for and use of heavy machinery within the extent of the
Conservation Area impacted by the construction of the road.
7. Prior to final site plan approval, the following note shall be added to the final site plans:
"Heavy machinery may only be used in the /WR conservation areas between .tune 15
and September 30 and will not be used outside of the area shown on this site plan for
staging and access to the construction impact area.
Based on these findings and conditions, the above standards are met.
(b) Petroleum products, chemicals, or other deleterious materials used in the
construction process shall not be allowed to enter a stream or wetland that is
within a /WR conservation area.
The applicant provides a statement that agrees to the above criterion, however evidence to
demonstrate how their plan will comply is not provided. To ensure compliance with this
standard, the following condition is warranted:
8. Prior to final site plan approval, the applicant shall add a note to the final site plans that
states, "Petroleum products, chemicals, or other deleterious materials used in the
construction process shall not be allowed to enter a stream or wetland that is within a
/WR conservation area."
Based on the materials in the record and the above findings and conditions of approval, the
standards at EC 9.4980(4) are met.
(5) Filling, Grading and Excavating. Filling, grading and excavating within the /WR
conservation area and within areas removed from the /WR conservation area shall
comply with the following standards:
March 2026 Findings & Decision of the Planning Director Page 15 of 28
Braewood Hills Third Addition (SDR 25-02 & PDF 25-01)
(a) Filling, grading or excavating of more than 500 square feet must comply with
Erosion Prevention regulations for sensitive areas in EC 6.645.
As proposed, because more than 500 square feet of grading or excavating is required as part of
this project, consistency with the applicable regulations of EC 6.645 are required. As discussed
above at EC 9.4980(2)(b) and incorporated herein by reference, a condition of approval was
required to ensure the applicant will obtain an Erosion Prevention permit, therefore this
standard is met.
(b) Grading and excavating conducted as part of restoration or enhancement projects,
and bank and channel reconfiguration shall result in topography that resembles
landscapes shaped only by natural processes, for example, incorporating the
undulations, meanders and slopes found in such landscapes. For purposes of this
standard, straight lines and geometric or angular shapes are not acceptable.
Channel and stream bank slopes shall not exceed 25 percent at elevations of 500
feet or less.
The applicant states that natural slopes, grades and contours will be established and straight
lines and geometric shapes will not occur. A proposed swale runs parallel to the north side of
the road extension that will exceed 25% slope due to the existing terrain. The side slopes of the
swale that exceed 25% are oriented perpendicular to the stream's flow direction and located
above the existing culvert where the stream flows in to. The swale will have no effect on the
existing stream channel or its banks. Based on the applicant's statement and site plan that
shows contouring lines, this standard is met.
Based on the materials in the record and the above findings, the standards at EC 9.4980(5) are
met.
(6) Impervious Surfaces. Within the /WR conservation area, construction of new
impervious surfaces shall comply with the following standards:
(a) Impervious surfaces are prohibited within the /WR conservation area unless they
are part of a use approved in accordance with EC 9.4930(3).
(b) Impervious surfaces that are part of a use approved in accordance with EC
9.4930(3) shall be no larger than the minimum necessary for the approved use. For
sites with wetlands, impervious surfaces shall be located as far from the
boundaries of locally significant wetlands as practicable. For riparian and upland
wildlife habitat sites, impervious surfaces shall be located as far from the line of
ordinary high water as practicable.
(c) Durable porous paving treatments or other infiltration devices approved by the
planning director or decision -maker shall be used in lieu of standard impervious
paving surfaces to increase infiltration of stormwater where practicable. This
standard shall apply only to low volume parking areas, foot paths or lightly used
access roads, where porous soils and flat topography will facilitate infiltration of
March 2026 Findings & Decision of the Planning Director Page 16 of 28
Braewood Hills Third Addition (SDR 25-02 & PDF 25-01)
runoff. For the purposes of this subsection, gravel surfaces are not acceptable as
porous paving or as an infiltration device.
This standard is met because any impervious surfaces being added will be permitted in
accordance with EC 9.4930(3)(b), which allows for the construction of public streets when
required by the land use code.
(7) Site Layout. On sites where the /WR conservation area is reduced, high intensity uses
within the entire development site, including high volume traffic lanes and truck
loading docks, shall be designed and located so that adverse impacts to wetland and
riparian habitats within the /WR conservation area are minimized to the greatest
extent practicable.
This application is for a public road required under the land use code, as found during the
Tentative PUD approval. The design and layout of the proposed impacts will be limited to what
is necessary and placed as far from the resource area as feasible. Both horizontal and vertical
alignments will be designed to follow existing grades as closely as possible. The road is located
as approved and the narrowest right of way dimension (40 feet) was approved through the PUD
process. This narrower right of way served to lessen the impact. Sidewalks are only required on
one side instead of 2 sides. No high intensity uses, high volume traffic lanes or truck loading
docks are proposed.
The applicant states that the design and layout is the minimum necessary, and notes that finish
grades will follow existing grades as much as possible. While certainly features worth
mentioning, the above standard appears to be related to high intensity uses which by the
standard's own context does not include the street required to serve this residential
development. The applicant's plan could have included a wider street crossing the riparian
area, but the applicant proposed constructing an access lane site layout is the minimum
necessary in the event it is found that the above standard should apply to the applicant's
request.
Based on these findings, the standard at EC 9.4980(7) is met.
(8) Lighting. Within the /WR conservation area, and within areas removed from the /WR
conservation area, outdoor area lighting shall be prohibited, except to illuminate
walkways, bike paths, pedestrian gathering areas, and parking areas, where these
facilities are intended to be used after dark. Outdoor area lighting is lighting designed
to illuminate an outdoor activity area, trail or bicycle path. Where lighting is to be
provided within the /WR conservation area and within areas removed from the /WR
conservation area, the following standards shall apply:
(a) Illumination for walkways, pathways or pedestrian gathering areas shall be no
more than an average maintained luminance of 0.5 foot-candle at grade.
March 2026 Findings & Decision of the Planning Director Page 17 of 28
Braewood Hills Third Addition (SDR 25-02 & PDF 25-01)
(b) Output from all other light sources shall be no more than an average maintained
luminance of 0.9 foot-candle at grade.
(c) All lighting fixtures shall be designed to direct light downward to areas intended
for human use after dark, and shall be shielded such that light shining toward /WR
conservation areas is minimized to the maximum extent practicable.
The applicant states that only required street lighting is proposed, and all fixtures will be
directed downward and away from the /WR resource. Street lighting is required to illuminate
the area for human use of the street and sidewalk after dark (i.e. pedestrian, cyclists, and
vehicle parking). The standard uses the term "outdoor area" providing the context that the
areas are intended to be used for activities, trails and bicycle paths which further reinforces the
notion that the standard does not contemplate street lighting. Because the proposed street is
allowed, subject to the Standards Review approval, the street lighting in the /WR conservation
area is subject to the above standards. While street lighting is not directly addressed, it does
not fall under the purview of (8)(a) above, but does warrant compliance with (8)(b) and (8)(c).
To ensure the applicant provides lighting that complies with the standards above, the following
condition is warranted:
9. Prior to final plat approval, the applicant shall add a note to the final site plans that
states, "All lighting within the /WR Conservation Area shall meet the lighting standards
under EC 9.4980(8)(b) and EC 9.4980(8)(c)."
Based on the above findings and condition of approval, this standard will be met.
(9) Trails. Within the /WR conservation area, trails shall be constructed of gravel, wood
chips or other pervious material, unless otherwise approved by the city manager or
decision -maker. Trail construction shall involve the least removal of native vegetation
practicable for the area and the minimum amount of fill or excavation practicable.
This standard does not apply to the applicant's request because the proposal does not include
any trails.
(10) Stream and Channel Crossings. Bridges or other structures that cross streams or
wetlands within the /WR conservation area or areas removed from the /WR
conservation area shall be constructed so that water flow, vegetation growth and
movement of aquatic animals and water dependent wildlife are impeded to the least
extent practicable. To meet this standard, bridges and crossings shall include, but are
not limited to, applicable items from the following list:
(a) Bridges across Category A or Category B streams as identified in the Goal 5 Water
Resources Conservation Plan shall, where practicable, be designed to avoid
channel constriction when flows reach the top of high bank. Where practicable,
bridges shall span a distance 1.2 times the width of the stream channel from top of
March 2026 Findings & Decision of the Planning Director Page 18 of 28
Braewood Hills Third Addition (SDR 25-02 & PDF 25-01)
high bank to top of high bank to help prevent scouring within the structure or at
the outlet during less frequent floods.
N Crossings over Category A or Category B streams as identified in the Goal 5 Water
Resources Conservation Plan shall utilize bridges or natural substrate culverts
where possible. Where practicable, the lower lip of any natural substrate culvert
shall be embedded at least 1 foot for box culverts and pipe arches, and at least
25% of the pipe diameter for pipe culverts. The substrate within the structure shall
match the composition of the substrate in the natural stream channel at the time
of construction. The substrate shall either resist displacement during flood events
or the structure shall be designed to maintain an appropriate bottom through
natural bed load transport.
(c) Bridges and culverts on Category A or Category B streams as identified in the Goal
5 Water Resources Conservation Plan shall be constructed so that the "openness
ratio" of the structure is equal to or greater than 0.25. The "openness ratio" is the
cross -sectional area of the passage area under or within the structure divided by
the length of the stream segment it crosses over. For a box culvert, the openness
ratio shall be (height x width)/length.
(d) Culverts shall not substantially increase or decrease water depth or flow rate
conditions upstream or downstream from the culvert.
(e) The lower lip of all culverts shall meet the stream or channel bed at or below
grade.
(f) Culverts shall be the minimum length practicable, and fill on top of the culvert shall
have the minimum footprint practicable.
An underground 12-inch storm drain line existed in this location prior to this application and
development proposal. The drainage line spans beyond the area of road construction,
conveying runoff from the Goal 5 stream north of the street into Videra Park and Videra Creek
to the south. The existing culvert will remain intact without modification beneath the proposed
public roadway. To the extent that it is relevant, the applicant has sited the road location over
this drainage line, limiting the impact to non -piped portions of the water resource.
Based on the existing culvert, which appears to function as intended by conveying stream
runoff to Videra Park, and that the prosed road construction will not alter the existing culvert or
have any impact on the stream channel, the proposal is consistent with the requirements of
this standard. T
(11) Interpretive Facilities. Within the /WR conservation area, boardwalks, viewing
platforms, interpretive information kiosks, trail and interpretive signs shall be
constructed in a manner that involves the least removal of native vegetation
March 2026 Findings & Decision of the Planning Director Page 19 of 28
Braewood Hills Third Addition (SDR 25-02 & PDF 25-01)
practicable. Signs shall be no more than 5 feet tall, and 16 square feet per face in
surface area, except for signs intended to be read from moving automobiles, such as
site entrance signs, which shall be no more than 8 feet tall and 32 square feet per face
in surface area. Kiosks shall be no more than 8 feet tall and 16 square feet per face in
surface area. The number of signs shall be the minimum necessary to accomplish
project objectives.
This standard does not apply because no interpretive facilities are proposed or required as part
of the project.
Based on the findings and conditions of approval, this proposal is consistent with the standards
at EC 9.4980(1)-(11).
SECTION 2 FINAL PLANNED UNIT DEVELOPMENT EVALUATION
EC 9.8365(1): The final PUD plan conforms with the approved tentative PUD plan and all
conditions attached thereto.
The applicant submitted revised site plans as part of their Final PUD application. These plans
conform to the approved Tentative PUD plans as required.
The following conditions (also in bolded text) were attached to the Hearings Official's approval
of the Tentative PUD and are further addressed below with findings of compliance addressing
each.
1. On the final PUD site plans and final plat, the applicant shall create an access restriction
strip along the westerly boundary line of Lot 15 abutting Hawkins Lane.
Sheet L2.0 of the Final PUD plans depicts an access restriction strip along the west boundary
line of Lot 15. Therefore, this condition has been met.
2. Prior to final plat approval, the applicant shall demonstrate approval from the regional
road naming group for alternate street names to replace "Stonehedge Way" and
"Stonehedge Court".
Public Works staff have confirmed that the proposed street names of Tambour Lane and
Tambour Court are unique names not duplicated within Lane County and are approvable.
Therefore, this condition is met.
3. The private streets shall be labeled on the final plat and final PUD site plans as
March 2026 Findings & Decision of the Planning Director Page 20 of 28
Braewood Hills Third Addition (SDR 25-02 & PDF 25-01)
"[Approved Street Name] - Private".
Sheet L2.0 of the final PUD plans have been revised and include the label "Private" at the end
of proposed private streets. Therefore, this condition has been met.
4. The structural design and construction inspection for the private streets will remain the
developer's responsibility. Certification by a licensed engineer that a structural design
meeting the applicable standards will be required at the time of the site development
permit for the private street.
This condition of approval will be further reviewed during the site development permit process.
S. Prior to final PUD and plat approval, the applicant shall submit Private Joint Use Access
and Utility Easement and Maintenance Agreement (JAM). The JAM will include a
description defining the area of the private street and will also identify permitted
improvements, construction expectations, rights of usage and maintenance
responsibilities for the facilities in the street. The JAM will be recorded concurrent with
and cross-referenced on the final plat.
A JAM was submitted with the application materials that defines the private street area,
identifies permitted improvements, construction expectations, rights of usage and
maintenance responsibilities for the facilities in the street. However, Public Works review has
found that the Recitals section describes Lot A as only Tambour Lane — Private, however, the
JAM will need to be revised and include Tambour Court as part of Lot A. Additionally, in the
Permitted Improvements and Construction Expectations section, the creation of a blanket
Public Utility Easement (PUE) and a blanket Private Utility Easement in the same area is not
allowed. The JAM will need to be revised to either define a blanket PUE with a private utility
corridor or a blanket private utility easement with a PUE corridor.
Based on the identified issues above and the requirement that the JAM will be recorded
concurrent with and cross-referenced on the final plat, the following condition of approval is
warranted:
10. Prior to final site plan approval, the applicant shall submit a revised Private Joint Use
Access and Utility Easement and Maintenance Agreement (JAM) that includes
referencing Tambour Lane and Tambour Court as part of Lot A, and the Permitted
Improvements and Construction Expectations section shall be revised to either define a
blanket PUE with a private utility corridor or a blanket private utility easement with a
PUE corridor.
Based on the above findings and condition of approval, this condition will be met.
6. Provisions for a public emergency access easement within the private street may be
March 2026 Findings & Decision of the Planning Director Page 21 of 28
Braewood Hills Third Addition (SDR 25-02 & PDF 25-01)
included in the proposed JAM which creates the private street, or alternatively, may be
dedicated as a Public Emergency Access Easement on a standard City form.
The proposed JAM includes provisions for public emergency access. Therefore, this condition
has been met.
7. Prior to final plat approval, the applicant shall dedicate a 14-foot Public Utility Easement
or Public Wastewater Easement that will encumber the proposed public wastewater
system. The required easement shall also be shown on revised final PUD plans.
The plans depict a variable width PUE over the entirety of Lot A. As discussed above and under
condition of approval 5, the JAM will need to be revised to either define a blanket PUE with a
private utility corridor or a blanket private utility easement with a PUE corridor, therefore the
following condition of approval is warranted:
11. Prior to final site plan approval, the final site plans shall be revised to either define a
blanket PUE with a private utility corridor or a blanket private utility easement with a
PUE corridor.
Based on the above findings and condition of approval, this condition will be met.
8. The final PUD site plans shall include the following note: "No building, structure, tree or
other obstruction shall be placed or located on or in a Public Utility Easement, consistent
with EC 9.6500(3)".
The required note is shown on Sheet L2.0 of the site plans. Therefore, this condition has been
met.
9. The final PUD site plans shall include the following note: "Compliance with public
improvement requirements shall be demonstrated in accordance with EC 9.6505 as part
of the permitting process for development within the PUD including Privately Engineered
Public Improvement (PEPI) Permits, Site Development Permits and Building Permits."
The required note is shown on Sheet L2.0 of the site plans. Therefore, this condition has been
met.
10. The final PUD site plans shall include the following note: "A Privately Engineered Public
Improvement (PEPI) permit shall be issued for the construction of public improvements
prior to development."
The required note is shown on Sheet L2.0 of the site plans. Therefore, this condition has been
met.
11. Prior to final plat approval, the applicant shall provide documentation that EWEB has
March 2026 Findings & Decision of the Planning Director Page 22 of 28
Braewood Hills Third Addition (SDR 25-02 & PDF 25-01)
received a financial guarantee, ensuring water will be provided to each lot in the plat.
This condition of approval will be required to be met during the Final Subdivision process and
approval of the final plat.
12. Prior to final PUD approval, the applicant shall submit an updated site plan that depicts
wastewater service to Lot 38. Alternatively, the applicant may combine Lots 37 and 38 to
demonstrate compliance with the requirement for wastewater service.
Sheet L2.0 of the site plans depicts previously numbered lots 37 and 38 have been combined
into one lot 37. Therefore, this condition has been met.
13. The applicant shall submit an Irrevocable Petition for public improvements in Hawkins
Lane to include sidewalks.
The applicant has submitted an Irrevocable Petition for public improvements in Hawkins Lane.
Therefore, this condition has been met.
14. The applicant shall submit an Irrevocable Petition for public improvements in Randy Lane
(existing portion between Hawkins Lane and Blacktail Drive) to include setback sidewalks
and street trees.
The applicant has submitted an Irrevocable Petition for public improvements in Randy Lane.
Therefore, this condition has been met.
15. The proposed Joint Access Easements, which are subject to City review and approval prior
to recording with the final plat, shall be cross-referenced on the plat and be accompanied
by a maintenance agreement for each shared driveway, which addresses the rights and
responsibilities of each parcel relative to each shared driveway.
Joint Access Easements for each shared driveway have been submitted for review. Therefore,
this condition has been met.
16. The location of proposed Joint Access Easements shall also be clearly shown and labeled
as such on final PUD plans.
All proposed Joint Access Easements are clearly shown on the final PUD plans. Therefore, this
condition has been met.
17. Prior to final PUD approval, the applicant shall update their stormwater memo to show
how the proposed shared driveways will satisfy EC 9.6792(3)(c).
March 2026 Findings & Decision of the Planning Director Page 23 of 28
Braewood Hills Third Addition (SDR 25-02 & PDF 25-01)
An updated stormwater report (dated August 2025) was submitted and demonstrates how the
shared driveways will satisfy EC9.6792(3)(c). Therefore, this condition has been met.
18. Prior to final PUD approval, the applicant shall obtain Type II Standards Review approval
for the proposed public street extension of Randy Lane and any other utility crossings or
other allowed improvements within the protected /WR conservation area, subject to the
applicable standards at EC 9.4900-9.4980.
A Standards Review application for the street extension of Randy Lane was submitted
concurrent with this Final Planned Unit Development application and reviewed and approved in
section 1 of this decision. Therefore, with concurrent approval of the Standards Review, this
condition is met.
19. All future building permits for Lots 30 through 35 shall depict the Goal 5 resource and its
40-foot setback from top of bank and shall include site plans showing the location of
protective fencing subject to the applicable standards at EC 9.4920-9.4930.
This requirement will be assessed with each future building permit for lots 30 through 35,
Therefore, this condition will be met.
20. The final PUD plans shall include the following note: "Compliance with all applicable
development standards, special use limitations, and other general development
standards for single -unit or middle housing residential dwelling types shall be
demonstrated at the time of future building permit on each individual lot."
The required note is shown on Sheet L2.0 of the site plans. Therefore, this condition is met.
21. The final PUD plans shall be revised to remove any references to middle housing lots to
be created on land above 901-foot elevation. The final PUD plans shall also include a note
stating that: "No development of middle housing, single -unit dwellings, or any other
development, including but not limited to land divisions, may occur on any land above
901-feet in elevation."
The required note is shown on Sheet L2.0 of the site plans. Therefore, this condition has been
met.
22. The final PUD plans shall include the following note: "No site alteration is allowed prior to
final PUD approval. This prohibition includes site grading and the removal of trees and
other vegetation, as well as any impacts to wetlands and the protected stream on the
subject property including changes to the existing drainage pattern. Any such alterations
shall only be allowed subject to permit review and approval, and erosion control
measures as required for the proposed work."
March 2026 Findings & Decision of the Planning Director Page 24 of 28
Braewood Hills Third Addition (SDR 25-02 & PDF 25-01)
The required note is shown on Sheet L2.0 of the site plans. Therefore, this condition has been
met.
23. Prior to final PUD approval, the applicant shall submit an updated site plan depicting that
portion of Randy Lane now shown as a proposed private street on Sheet L2.0 of the
applicant's site plans, as a public street instead. The revised site plan shall show that
portion of Randy Lane will be designed and constructed to City standards as a public
street meeting the standards for an Access Lane in accordance with EC 9.6505(3)(a) and
the Local Street Design Standards of the Design Standards and Guidelines for Eugene
Streets, Sidewalks, Bikeway and Accessways, as well as the City's Public Improvement
Design Standards (PIDS) Manual.
Public Works confirms that sheets L2.0 and C3.0 depict Randy Lane as being designed in
accordance with EC9.6505(3) and the PIDS manual. Therefore, this condition has been met.
24.On the final plat, the applicant shall dedicate a 40-foot-wide right-of-way extending the
public right-of-way for Randy Lane from its existing intersection with Blacktail Drive
westerly (toward the western terminus of Randy Lane) to the proposed terminus of
Randy Lane as currently depicted on Sheet L2.0 of the applicant's site plans. The right-of-
way shall also encompass the required turnaround area at the end of the street and
include a reserve strip in accordance with EC 9.6840(1).
The right-of-way dedication for the extension of Randy Lane will be reviewed during the future
Final Subdivision process. Therefore, this condition will be met.
25. Prior to final PUD approval, the applicant shall submit an updated site plan that depicts
that Lot 38 will have frontage on a public street or having access to a public street over a
private street or proposed private access easement. Alternatively, the applicant may
combine Lots 37 and 38 to demonstrate compliance with the requirement for public street
access.
Sheet L2.0 depicts all lots having frontage on a public street or having access to a public street
via private easements. In addition, previously numbered lots 37 and 38 have been combined
into one lot 37. Therefore, this condition is met.
26. Prior to final PUD approval, the applicant shall submit updated application materials that
demonstrate compliance with EC 9.6796.
The applicant submitted an updated stormwater report (updated October 2025), which notes
that all proposed stormwater facilities will be publicly owned. However, no public stormwater
easements are proposed. Because these stormwater facilities will be publicly owned and
maintained, public stormwater easements are required for all facilities that are not located
within public right-of-way, therefore the following condition of approval is warranted:
March 2026 Findings & Decision of the Planning Director Page 25 of 28
Braewood Hills Third Addition (SDR 25-02 & PDF 25-01)
12. Prior to final site plan approval, the final plans shall be revised so that all public
stormwater facilities are located in either public right-of-way, public utility easements,
or public stormwater easements in compliance with EC 9.6796.
Based on the above findings and condition of approval, this condition will be met.
27. Prior to final PUD approval, the applicant shall submit an updated site plan that includes
the following notes:
"The approved stormwater system shall be designed and sized by a civil engineer for
the full build -out of the project including 20% of each lot assumed to be impervious
surface area. If a lot is proposed to be developed with more than 20% impervious
surface area, then additional on -site detention is required. Stormwater runoff from
private facilities may also be combined with runoff from the public street (Randy
Lane), so long as the public detention system is sized and designed in accordance with
applicable Public Improvement Design Standards."
"In addition to the on -site detention requirements noted above, all subsequent site
development permits, building permits, and Privately Engineered Public Improvement
(PEPI) permits for development of the PUD shall demonstrate compliance with
applicable stormwater standards at EC 9.6791 through 9.6797 and requirements of the
Stormwater Management Manual."
Both required notes are included as notes 6 and 7 on sheet L2.0. Therefore, this condition is
met.
Based on the above findings and conditions of approval, EC 9.8365(1) is met.
(2) For final PUDs not associated with a land division, public improvements as required by
this land use code or as a condition of tentative plan approval will be completed prior to
issuance of a development permit, or:
(a) A performance bond or suitable substitute as agreed upon by the city has been
filed with the city finance officer in an amount sufficient to assure the completion of
all required public improvements; or
(b) A petition for public improvements and for the assessment of the real property for
the improvements has been signed by the property owner seeking the subdivision,
and the petition has been accepted by the city engineer.
This final PUD includes a land division. Therefore, this criterion does not apply.
March 2026 Findings & Decision of the Planning Director Page 26 of 28
Braewood Hills Third Addition (SDR 25-02 & PDF 25-01)
Decision
Based on the available information and evidence, and based on the preceding findings of
compliance with applicable approval criteria and standards, the Standards Review and Final
Planned Unit Development are APPROVED with the following conditions:
Conditions related to Standards Review (SDR 25-02)
1. The applicant shall obtain an Erosion Prevention permit prior to the initiation of any
development activities in the Conservation Setback as shown on the site plans.
2. Prior to final site plan approval, the applicant shall submit a revised final site plan that
identifies the Conservation Area in between the southern property line and the southern
edge of the road and sidewalk. The revised site plans shall also show replanting details
consistent with the requirement at EC 9.4980(2)(c).
3. Prior to site plan approval, the applicant shall submit a revised final site plan that
includes tree and plant species that are selected from the Native and Non -Native Plant List,
Exhibit F to Ordinance No. 20351.
4. Prior to Final PUD approval, the following note shall be added to the final site plans:
"Any disturbed 'areas within the Conservation Setback shall be replanted within 90 days of
any clearing or vegetation removal activities, unless otherwise approved by the Eugene
Planning Director."
5. Prior to final site plan approval, the applicant shall submit a revised site plan that
shows staging area(s) for heavy machinery. Alternatively, the applicant may include a note
on the final site plan stating, "No staging areas for heavy equipment will be located within
a Conservation Area."
6. Prior to final site plan approval, the applicant shall submit a revised site plan that
shows the location of access for and use of heavy machinery within the extent of the
Conservation Area impacted by the construction of the road.
7. Prior to final site plan approval, the following note shall be added to the final site
plans: "Heavy machinery may only be used in the /WR conservation areas between .tune 15
and September 30 and will not be used outside of the area shown on this site plan for
staging and access to the construction impact area.
8. Prior to final site plan approval, the applicant shall add a note to the final site plans
that states, "Petroleum products, chemicals, or other deleterious materials used in the
construction process shall not be allowed to enter a stream or wetland that is within a /WR
conservation area."
9. Prior to final plat approval, the applicant shall add a note to the final site plans that
states, "All lighting within the /WR Conservation Area shall meet the lighting standards
under EC 9.4980(8)(b) and EC 9.4980(8)(c)."
March 2026 Findings & Decision of the Planning Director Page 27 of 28
Braewood Hills Third Addition (SDR 25-02 & PDF 25-01)
Conditions related to planned Unit Development (PDF 25-01)
10. Prior to final site plan approval, the applicant shall submit a revised Private Joint Use
Access and Utility Easement and Maintenance Agreement (JAM) that includes referencing
Tambour Lane and Tambour Court as part of Lot A, and the Permitted Improvements and
Construction Expectations section shall be revised to either define a blanket PUE with a
private utility corridor or a blanket private utility easement with a PUE corridor.
11. Prior to final site plan approval, the final site plans shall be revised to either define a
blanket PUE with a private utility corridor or a blanket private utility easement with a PUE
corridor.
12. Prior to final site plan approval, the final plans shall be revised so that all public
stormwater facilities are located in either public right-of-way, public utility easements, or
public stormwater easements in compliance with EC 9.6796.
Jeff Gepp4r,Yr(ncipal'Plann//, for the Eugene Planning Director Date
Attachments
Attachment A: Fire Marshal's Office comments (February 25, 2026)
Attachment B: Exhibit F to Ordinance No. 20351-Native and Non -Native Plant List
Post Approval & Expiration
Pursuant to EC 9.7220(4), the Planning Director's decision regarding this Type II application is
effective on the 13t" day after notice of the decision is mailed, unless appealed according to the
procedures in EC 9.7605. Per EC 9.7230, the applicant shall submit an application for a
development permit within 36 months of the approval effective date, or the approval shall
expire. A performance agreement in accordance with EC 9.7025 is required.
The Standards Review shall remain effective for 18 months following the effective date of
approval, in accordance with EC 9.7230. Within that time period, the applicant must submit a
final plan meeting the applicable conditions of approval and execute a performance agreement
in accordance with EC 9.7025.
It is also noted that this approval does not relieve the applicant of complying with other
applicable provisions of the Eugene Code or Oregon Revised Statutes, which may otherwise
govern the development of the subject property.
March 2026 Findings & Decision of the Planning Director Page 28 of 28
Braewood Hills Third Addition (SDR 25-02 & PDF 25-01)
Eugene Office
1320 Willamette Street
Eugene, OR 97401
(541) 682-5411
(541) 682-6882 FAX
Fire
Attachment A
FIRE DEPARTMENT ('.OMMENTS FOR EUG"'ENE, OR
SP1tI\'GFIIiLD PLA\'\TIN( DEPARTMENTS
Date: February 25, 2026
Project: Braewood Hills 3rd Addition
File Number: PDF-25-01
Address: not yet assigned; east of Hawkins Lane -Eugene
Existing Use: Vacant
Proposal: Final Planned Unit Development to create 38 residential lots,
streets, and associated infrastructure improvements.
Planner: Nick Gioello, Associate Planner
Fire Department Comments/Conditions
Access:
1. The maximum street profile slope for Tambour Court has changed from the
PDF-24-01 to the PTF-25-01 from a maximum slope of 19% to 24%. This is
not acceptable for fire apparatus access. Show a revied profile with
maximum slope of 20% with transitions to 10% on each side.
2. Street widths of 21 feet with parking on one side appear to meet City of Eugene
engineering standards for local public access. However, Eugene Springfield Fire
strongly recommends following the 2022 Eugene Fire Code, Section 503.2.1
which requires 20 feet clear width with no parking allowed on both sides within
that 20 foot width for these private streets. "NO PARKING -FIRE LANE"
signage shall be posted on both sides of the Randy Lane, Tambour Lane
and Tambour Court (2022 Eugene Fire Code Section D103.6).
3. Since there is only one access to this 38 lot subdivision, all dwellings in this
development shall be equipped with approved automatic fire sprinkler systems
meeting NFPA requirements (2022 EFC, Appendix D107.1, exception 1).
SPRftdGrirLD
A shared service of the cities of Eugene and Springfield, Oregon
4. Several lots show access to be provided by 10 and 14 foot wide utility and
access easements. This width will not be adequate for the required fire
apparatus access requirements of 20' minimum. Access requirements for these
houses will be evaluated at the time of building permit submittal, when such
access is proposed (2022 Eugene Fire Code 503.2.1).
5. Fire will review the building permit applications for all lots within this subdivision
to ensure proper fire department apparatus access is provided and fire sprinklers
meeting NFPA standards are applied to new houses. Fire apparatus turnarounds
may be required in certain instances to the distance from Randy Lane and
Tambour Lane &Court (2022 Eugene Fire Code 503.1 & D103.4).
Water Supply:
This proposal shows fire hydrants being proposed.
1. The spacing of the proposed fire hydrants does not meet the average spacing
requirements of EFC C105.1 and table C105.1. Randy Lane and Stonehenge
Way are both private dead end streets. As such the maximum average hydrant
spacing is 400 feet, and maximum distance from any point on street or road
frontage to a hydrant is 200 feet. Add an additional hydrant in the vicinity of the
hammerhead turnaround of Tambour Ct. In order to meet fire hydrant spacing
requirements FH-3 (at the end of Randy Lane) should be moved to the west.
2. The size of the dwelling units may dictate additional fire hydrants be installed
depending on the square footage. Anything over 3,600 sq. ft. of fire area (which
includes garages) will usually require additional fire hydrants with a minimum flow
of 1,500 gpm at 20 psi residual pressure per 2022 EFC Appendix B. Again, this
required fire flow can be reduced with the installation of fire sprinkler systems.
Comments provided by Deputy Fire Marshal Eric Phillips -Meadow
SPRINGFIELD
A shared service of the cities of Eugene and Springfield, Oregon
Attachment B
Exhibit F to Ordinance No. 20351
Native and Non -Native Plant List
Exhibit F to Ordinance No. 20351
Native and Non -Native Plant List
Part 1
NATIVE PLANT SPECIES FOR SITES AT OR ABOVE 425 FEET IN ELEVATION WITHIN
THE EUGENE UG B
The plant species included in this list are species that grow and propagate themselves in the Eugene
area through natural processes, are adapted to the weather, soils and hydrology of the area, and have
evolved in the area or been introduced to the area by natural causes. These native plant species are
distinguished from plant species that have been deliberately or accidentally imported or introduced
from other areas by humans or human activities.
This list applies to all habitat types, including riparian, upland and wetland areas, above 425 feet in
elevation. To meet Eugene Code requirements for native plants, these species are to be used within the
specified geographic area or elevation. Do not substitute alternate species. You must use the specific
species, subspecies or variety listed.
Wetland Indicator Status and Site Suitability information in the table below is intended as a guideline
for identifying suitable locations for plant species based on additional site characteristics, such as soils
and hydrology.
Common Name
grand fir
vine maple
Oregon bigleaf maple
red alder
Pacific madrone
incense cedar
Pacific dogwood
Oregon ash
Ponderosa pine
black cottonwood
Douglas fir
Oregon white oak
California black oak
Pacific willow
Scouler's willow
Sitka willow
Pacific yew
Scientific Name
Wetland
Indicator
Status
Abies grandis
NOL
Acer circinatum
FACU+
Acer macrophyllum
FACU
Alnus rubra
FAC
Arbutus menziesii
NOL
Calocedrus decurrens
NOL
Corms nuttallii
NOL UB
Fraxinus latifolia
FACW
Pinus ponderosa
FACU
Populus trichocarpa
FAC
Pseudotsuga menziesii var. menziesii NOL
Quercus garryana var. garryana NOL
Quercus kelloggii
NOL
Salix lucida ssp. lasiandra
FACW+
Salix scouleriana
FAC
Salix sitchensis
FACW
Taxus brevifolia
FACU-
Site
Suitability
UB
UB
UB
LB, UB
UB
UB
LB, UB
UB
LB
UB
UB
UB
WE, LB
LB, UB
WE, LB
UB
Exhibit F to Ordinance No. 20351 Page 1
Shrubs and Vines
Common Name
serviceberry
tall Oregon grape
common buckbrush
redstem ceanothus
wild clematis
Suksdorf s hawthorn
red -osier dogwood
California hazel
salal
ocean spray
orange honeysuckle
hairy honeysuckle
osoberry/indian plum
mock -orange
Pacific ninebark
chokecherry
cascara buckthorn
straggly gooseberry
red currant
baldhip rose
Nootka rose
thimbleberry
salmon berry
dewberry
blue elderberry
red elderberry
Douglas spiraea
snowberry
red huckleberry
viburnum
Scientific Name
Amelanchier alnifolia
var. semiintegrifolia
Berberis aquifolium
Ceanothus cuneatus
Ceanothus sanguineus
Clematis ligusticifolia
Crataegus suksdorfii FAC
Corms sericea
Corylus cornuta
var. californica
Gaultheria shallop
Holodiscus discolor
Lonicera ciliosa
Lonicera hispidula
Oemleria cerasiformis
Philadelphus lewisii
Physocarpus capitatus
Prunus virginiana
var. demissa
Rhamnus purshiana
Ribes divaricatum
Ribes sanguineum
Rosa gymnocarpa
Rosa nutkana var. nutkana
Rubus parviflorus
Rubus spectabilis
Rubus ursinus
Sambucus mexicana
Sambucus racemosa
var. arborescens
Spiraea douglasii
var. douglasii
Symphoricarpos albus
var. laevigatus
Vaccinium parviflorum
Viburnum ellipticum
Wetland
Indicator Site
Status Suitability
FACU UB
NOL
NOL
NOL
FACU
UB
FACW
NI
NOL
NOL
NOL
NOL
NOL
NOL
FAC+
FACU
FAC-
NI
NOL
NI
NI
FACU+
FAC
NOL
FAC-
FACU
WE, LB
UB
UB
UB
UB
UB
UB
UB
WE, LB
UB
UB
UB
UB
UB
LB, UB
UB
LB, UB
UB
UB
UB
FACW
WE, LB
FACU
UB
NOL
UB
NOL
UB
Exhibit F to Ordinance No. 20351 Page 2
Herbaceous Plants
Common Name
Scientific Name
Wetland
Indicator Site
Status Suitability
vanilla -leaf
Achlys triphylla
NOL
UB
baneberry
Actaea rubra
NOL
UB
pathfinder
Adenocaulon bicolor
NOL
UB
red columbine
Aquilegia formosa
FAC
LB, UB
wild ginger
Asarum caudatum
NOL
UB
wild aster
Eurybia radul ina (Aster radul inus)
NOL
UB
lady -fern
Athyrium fil ix fem ina
FAC
WE, LB, UB
American wintercress
Barbarea orthoceras
FACW+
LB
elegant brodiaea
Brodiaea elegans
FACU
UB
harvest Brodiaea
Brodiaea coronaria
NOL
UB
wood bittercress
Cardamine angulata
FACW
LB, UB
spring beauty
Cardamine nuttallii var. nuttallii
NOL
UB
miner's lettuce
Claytonia perfoliata
FAC
UB
candyflower
Claytonia sibirica
FACW
UB
tall larkspur
Delphinium trolliifolium
NOL
UB
bleeding heart
Dicentra formosa
NOL
UB
Hooker's fairy bells
Prosartes hookeri
NOL
UB
Watson's willow herb
Epilobium ciliatum var. watsonii
FACW-
WE, LB
Oregon fawn lily
Erythronium oregonum
NOL
UB
large -leaf avens
Geum macrophyllum
FACW+
LB, UB
lowland cudweed
Gnaphalium palustre
FAC+
WE
Willamette valley gumweed
Grindelia integrifolia
FACW
WE, LB
cow -parsnip
Heracleum lanatum
FAC
UB
Pacific waterleaf
Hydrophyllum tenuipes
NOL
UB
bog St. John's -wort
Hypericum anagalloides
OBL
SW, WE
tiger lily
Lilium columbianum
FAC
UB
miniature lupine
Lupinus polycarpus
NOL
UB
riverbank lupine
Lupinus rivularis
FAC
LB, UB
skunk cabbage
Lysichiton americanus
OBL
SW, WE
big smilacina
Maianthemum racemosum
FAC-
UB
little smilacina
Maianthemum stellatum
FAC-
UB
Oregon bigroot
Marah oreganus
NOL
UB
western bluebell
Mertensia platyphylla
NOL
UB
water montia
Montia fontana
OBL
SW, WE
aquatic caytonia
Montia linearis
NOL
LB, UB
small forget-me-not
Myosotis laxa
OBL
SW, WE
small flowered nemophila
Nemophila parviflora
var. nemophylla
NOL
UB
water -parsley
Oenanthe sarmentosa
OBL
SW, WE
sweet cicely
Osmorhiza berteroi
NOL
UB
w. yellow wood sorrel
Oxalis suksdorfii
NOL
UB
sweet colt's-foot
Petasites frigidus var. palmatus
FACW
LB
Exhibit F to Ordinance No. 20351 Page 3
woodland phacelia
Phacelia nemoralis
FACU
UB
swordfern
Polystichum munitum
NOL
UB
bracken fern
Pteridium aquilinum
FACU
UB
self -heal
Prunella vulgaris var. lanceolata
FACU+
UB
white water buttercup
Ranunculus aquatil is
OBL
S W, WE
woods buttercup
Ranunculus uncinatus
FAC
UB
willow leaved dock
Rumex salicifolius
FACW
WE
Pacific sanicle
Sanicula crassicaul is
NOL
UB
yerba buena
Satureja douglasii
NOL
UB
Idaho blue-eyed grass
Sisyrinchium idahoense
var. idahoense
FACW
WE, LB
beautiful blue eyed grass
Sisyrinchium bellum
FACW-
UB
hedge -nettle
Stachys mexicana
FACW
LB, UB
spring queen
Synthyris reniformis
NOL
UB
fringecups
Tellima grandiflora
NOL
UB
western meadowrue
Thalictrum occidentale
FACU UB
tall western meadowrue
Thalictrum polycarpum
NOL
UB
piggy -back plant
Tolmiea menziesii
FAC
LB
star -flower
Trientalis latifolia
FAC-
UB
sessile trillium
Trillium albidum
NOL
UB
western trillium
Trillium ovatum ssp. ovatum
NOL
UB
inside -out flower
Vancouveria hexandra
NOL
UB
American vetch
Vicia americana
NI
WE, LB
woodland violet
Viola glabella
FACW+
UB
Grasses, Sedges, Rushes
Wetland
Indicator
Site
Common Name
Scientific Name
Status
Suitability
Sitka brome
Bromus sitchensis
NOL
UB
Dewey's sedge
Carex deweyana var. leptopoda
FAC+
UB
Henderson's sedge
Carex hendersonii
NI
LB
slough sedge
Carex obnupta
OBL
SW, WE
sawbeak sedge
Carex stipata var. stipata
NOL
WE, LB
needle spikerush
Eleocharis acicularis
OBL
SW, WE
creeping spikerush
Eleocharis palustris
OBL
SW, WE
blue wild -rye
Elymus glaucus ssp. glaucus
FACU
UB
tall manna grass
Glyceria striata
FACW+
WE, LB
meadow barley
Hordeum brachyantherum
FACW
WE, LB
common rush
Juncus effusus var. gracil is
FACW+
S W, WE
spreading rush
Juncus patens
FACW
SW, WE
lacquered rush
Juncus laccatus
?
SW, WE
onion grass
Mellica subulata
NOL
UB
Exhibit F to Ordinance No. 20351 Page 4
Key to Wetland Indicator Status
OBL = Obligate Wetland Plants. Under normal conditions, these plants almost always occur in
wetlands (estimated probability of wetland occurrence 99%).
FACW = Facultative Wetland Plants. Under normal conditions these plants are usually found in
wetlands, but also may be found outside wetlands (estimated probability of wetland occurrence
67-99%)
FAC = Facultative Plants. Under normal conditions, these plants are found equally in wetlands and
non -wetlands (estimated probability of wetland occurrence 33-66%).
FACU = Facultative Upland Plants. Under normal conditions, these plants are most likely to be found
in non -wetlands (estimated probability of wetland occurrence 1-33%).
UPL = Obligate Upland Plants. These plants are almost always found in non -wetlands, and are
expected to be found in wetlands less than 1 % of the time.
NOL = Not on U.S.F.W.S. wetland plant list.
Key to Site Suitability
SW = Shallow water
WE = Water's edge
LB = Lower bank
UB = Upper bank and terraces above the ordinary high water line
Wetland indicator status information is taken from:
"National List of Plant Species That Occur In Wetlands: Northwest (Region 9)," U.S. Fish and
Wildlife Service, May 1988; 1993 supplement.
Exhibit F to Ordinance No. 20351 Page 5
Part 2
NATIVE PLANT SPECIES FOR SITES AT OR BELOW 500 FEET IN ELEVATION WITHIN
THE E UGENE UG B
The plant species included in this list are species that grow and propagate themselves in the Eugene
area through natural processes, are adapted to the weather, soils and hydrology of the area, and have
evolved in the area or been introduced to the area by natural causes. These native plant species are
distinguished from plant species that have been deliberately or accidentally imported or introduced
from other areas by humans or human activities.
This list applies to all habitat types, including riparian, upland and wetland areas, below 500 feet in
elevation within the UGB, except within the West Eugene Wetlands Plan area, and within seasonal wet
prairie habitats (see Part 3). To meet Eugene Code requirements for native plants, these species are to
be used within the specified geographic area and elevation. Do not substitute alternate species. You
must use the specific species, subspecies or variety listed.
Wetland Indicator Status and Site Suitability information in the table below is intended as a guideline
for identifying suitable locations for plant species based on additional site characteristics, such as soils
and hydrology.
Common Name
Scientific Name
Wetland
Indicator Site
Status Suitability
grand fir
Abies grandis
NOL
UB
vine maple
Acer circinatum
FACU+
UB
Oregon bigleaf maple
Acer macrophyllum
FACU
UB
white alder
Alnus rhombifolia
FACW
LB, UB
red alder
Alnus rubra
FAC
LB, UB
incense -cedar
Calocedrus decurrens
NOL
UB
Pacific dogwood
Cornus nutallii
NOL
UB
Oregon ash
Fraxinus latifolia
FACW
LB, UB
ponderosa pine
Pinus ponderosa
FACU
UB
black cottonwood
Populus balsamifera
FAC
LB
ssp. trichocarpa
Douglas -fir
Pseudotsuga menziesii
var. menziesii
NOL
UB
Oregon white oak
Quercus garryana var. garryana
NOL
UB
California black oak
Quercus kelloggii
NOL
UB
Pacific willow
Salix lucida
FACW+
WE, LB
ssp. lasiandra
western yew
Taxus brevifolia
FACU-
UB
western redcedar
Thuja plicata
FAC
UB
Exhibit F to Ordinance No. 20351 Page 6
Shrubs
Wetland
Indicator
Site
Common Name
Scientific Name
Status
Suitability
serviceberry
Amelanchier alnifolia FACU
UB
var. semiintegrifolia
tall Oregon grape
Berberis aquifolium
NOL
UB
common buckbrush
Ceanothus cuneatus
NOL
UB
Suksdorf s hawthorn
Crataegus suksdorfii FAC
UB
var. suksdorfii
red -osier dogwood
Cornus sericea
FACW
WE, LB
California hazel
Corylus cornuta
NI
UB
var. californica
ocean spray
Holodiscus discolor
NOL
UB
osoberry/indian plum
Oemleria cerasiformis
NOL
UB
mock -orange
Philadelphus lewisii
NOL
UB
Pacific ninebark
Physocarpus capitatus
FAC+
WE, LB
chokecherry
Prunus virginiana
FACU
UB
var. demissa
cascara buckthorn
Rhamnus purshiana
FAC?
UB
straggly gooseberry
Ribes divaricatum
NI
UB
red currant
Ribes sanguineunz
NOL
UB
baldhip rose
Rosa gynznocarpa
NI
UB
Nootka rose
Rosa nutkana
NI
LB, UB
blackcap
Rubus leucodermis
NOL
UB
thimbleberry
Rubus parviflorus
FACU+
UB
salmonberry
Rubus spectabilis
FAC
LB, UB
dewberry
Rubus ursinus
NOL
UB
Columbia River willow
Salix fluviatilis
OBL
SW, WE
Piper's willow
Salix hookeriana (piperi)
FACW
LB
Scouler's willow
Salix scouleriana
FAC
LB, UB
Sitka willow
Salix sitchensis
FACW
WE, LB
blue elderberry
Sambucus mexicana (cerulea)
FAC-
UB
red elderberry
Sambucus racemosa
FACU
UB
var. arborescens
Douglas spiraea
Spiraea douglasii var. douglasii
FACW
WE, LB
snowberry
Symphoricarpos albus
var. laevigatus
FACU
UB
oval -leaved viburnum
Viburnum ellipticum
NOL
UB
Exhibit F to Ordinance No. 20351 Page 7
Vines
Wetland
Indicator
Site
Common Name
Scientific Name
Status
Suitability
wild clematis
Clematis ligusticifolia
FACU
UB
orange honeysuckle
Lonicera cil iosa
NOL
UB
hairy honeysuckle
Lonicera hispidula
NOL
UB
Herbaceous Plants
Wetland
Indicator
Site
Common Name
Scientific Name
Status
Suitability
vanilla -leaf
Achlys triphylla
NOL
UB
baneberry
Actaea rubra
NOL
UB
pathfinder
Adenocaulon bicolor
NOL
UB
red columbine
Aquilegia formosa
FAC
LB, UB
wild ginger
Asarum caudatum
NOL
UB
lady -fern
Athyrium filix femina
FAC
WE, LB, UB
American wintercress
Barbarea orthoceras
FACW+
LB
camas
Camassia leichtlinii
FACW-
LB, UW
wood bittercress
Cardamine angulata
FACW
LB, UB
spring beauty
Cardamine nuttallii var. nuttallii
NOL
UB
small -flowered claytonia
Claytonia pare flora
NOL
UB
miner's lettuce
Claytonia perfoliata
FAC
UB
candyflower
Claytonia sibirica
FACW
UB
tall larkspur
Delphinium trolliifolium
NOL
UB
bleeding heart
Dicentra formosa
NOL
UB
coastal shield fern
Dryoptera arguta
NOL
UB
Watson's willow herb
Epilobium ciliatum (watsonii)
FACW-
LB
Oregon fawn lily
Erythronium oregonum
NOL
UB
large -leaf avens
Geum macrophyllum
FACW+
LB, UB
lowland cudweed
Gnaphalium palustre
FAC+
UB
Willamette valley gumweed
Grindelia integrifolia
FACW
WE, LB
cow -parsnip
Heracleum lanatum
FAC
UB
Pacific waterleaf
Hydrophyllum tenuipes
NOL
UB
bog St. John's -wort
Hypericum anagalloides
OBL
SW, WE
tiger lily
Lilium columbianum
FAC
UB
miniature lupine
Lupinus polycarpus
NOL
UB
riverbank lupine
Lupinus rivularis
FAC
UB
skunk cabbage
Lysichiton americanus
OBL
SW, WE
big smilacina
Maianthemum racemosa
FAC-
UB
little smilacina
Maianthemum stellaum
FAC-
UB
Oregon bigroot
Marah oreganus
NOL
UB
western bluebell
Mertensia platyphylla
NOL
UB
water montia
Montia fontana
OBL
SW, WE
Exhibit F to Ordinance No. 20351 Page 8
aquatic claytonia
Montia l inearis
NOL
LB, UB
small forget-me-not
Myosotis laxa
OBL
SW, WE
small -flowered nemophila
Nemophila pare flora
var. nemophylla
NOL
UB
water -parsley
Oenanthe sarmentosa
OBL
SW, WE
sweet cicely
Osmorhiza berteroi
NOL
UB
w. yellow wood sorrel
Oxalis suksdorfii
NOL
UB
sweet colt's-foot
Petasites frigidus
FACW
LB
var. palmatus
woodland phacelia
Phacelia nemoralis
FACU
UB
swordfern
Polystichum munitum
NOL
UB
Hooker's fairy bells
Prosartes hookeri
NOL
UB
self -heal
Prunella vulgaris var. lanceolata
FACU+
UB
white water buttercup
Ranunculus aquatil is
OBL
S W, WE
woods buttercup
Ranunculus uncinatus
FAC
UB
western dock
Rumex occidentalis
FAC-
UB
var. procerus
willow leaved dock
Rumex salicifolius
FACW
WE
Pacific sanicle
Sanicula crassicaulis
NOL
UB
yerba buena
Satureja douglasii
NOL
UB
small -fruited bulrush
Scirpus microcarpus
OBL
WE
Hitchcock's blue-eyed grass
Sisyrinchium hitchcockii
NOL
UB
hedge -nettle
Stachys mexicana
FACW
LB, UB
fringecups
Tell ima grandiflora
NOL
UB
western meadowrue
Thalictrum occidentale
FACU
UB
tall western meadowrue
Thalictrum polycarpum
NOL
UB
piggy -back plant
Tolmiea menziesii
FAC
LB
star -flower
Triental is latifol is
FAC-
UB
sessile trillium
Trillium albidum
NOL
UB
western trillium
Trillium ovatum ssp. ovatum
NOL
UB
stinging nettle
Urtica dioica
FAC+
UB
inside -out flower
Vancouveria hexandra
NOL
UB
American vetch
Vicia americana
NI
WE, LB
woodland violet
Viola glabella
FACW+
UB
Grasses, Sedges, Rushes
Wetland
Indicator
Site
Common Name
Scientific Name
Status
Suitability
Dewey's sedge
Henderson's sedge
green -fruited sedge
slough sedge
sawbeak sedge
needle spikerush
Carex deweyana var. leptopoda
Carex hendersonii
Carex interrupta
Carex obnupta
Carex stipata var. stipata
Eleocharis acicularis
FAC+
NI
OBL
OBL
NOL
OBL
UB
LB
SW, WE
SW, WE
WE, LB
SW, WE
Exhibit F to Ordinance No. 20351 Page 9
creeping spikerush
Eleocharis palustris
OBL
SW, WE
blue wild -rye
Elymus glaucus ssp. glaucus
FACU
UB
tall manna grass
Glyceria striata
FACW+
WE, LB
meadow barley
Hordeum brachyantherum
FACW
WE, LB
taper -tip rush
Juncus acuminatus
OBL
SW, WE
three -stamen rush
Juncus ensifolius
FACW
WE, LB
common rush
Juncus effusus
FACW+
SW, WE
shiny rush
Juncus laccatus
NOL
SW, WE
pointed rush
Juncus oxymeris
FACW+
SW, WE
spreading rush
Juncus patens
FACW
SW, WE
slender rush
Juncus tenuis
FAC
LB
onion grass
Melica subulata
NOL
UB
Key to Wetland Indicator Status
OBL = Obligate Wetland Plants. Under normal conditions, these plants almost always occur in
wetlands (estimated probability of wetland occurrence 99%).
FACW = Facultative Wetland Plants. Under normal conditions these plants are usually found in
wetlands, but also may be found outside wetlands (estimated probability of wetland occurrence
67-99%)
FAC = Facultative Plants. Under normal conditions, these plants are found equally in wetlands and
non -wetlands (estimated probability of wetland occurrence 33-66%).
FACU = Facultative Upland Plants. Under normal conditions, these plants are most likely to be found
in non -wetlands (estimated probability of wetland occurrence 1-33%).
UPL = Obligate Upland Plants. These plants are almost always found in non -wetlands, and are
expected to be found in wetlands less than 1% of the time.
NOL = Not on U.S.F.W.S. wetland plant list.
Key to Site Suitab i 1 ity
SW = Shallow water
WE = Water's edge
LB = Lower bank
UB = Upper bank and terraces above the ordinary high water line
Wetland indicator status information is taken from:
"National List of Plant Species That Occur In Wetlands: Northwest (Region 9)," U.S. Fish and
Wildlife Service, May 1988; 1993 supplement.
Exhibit F to Ordinance No. 20351 Page 10
Part 3
NATIVE PLANT SPECIES FOR SITES IN THE WEST EUGENE WETLANDS PLAN AREA
AND IN SEASONAL WET PRAIRIE HABITAT IN OTHER GEOGRAPHIC AREAS
The plant species included in this list are species that grow and propagate themselves in the Eugene
area through natural processes, are adapted to the weather, soils and hydrology of the area, and have
evolved in the area or been introduced to the area by natural causes. These native species are
distinguished from plant species that have been deliberately or accidentally imported or introduced
from other areas by humans or human activities.
This list applies to sites within the West Eugene Wetlands Plan area and within wet prairie habitats
(e.g., in Westmoreland Park and Amazon Park). To meet Eugene Code requirements for native plants,
these species are to be used within the specified geographic area or elevation. Do not substitute
alternate species. You must use the specific species, subspecies or variety listed.
Wetland Indicator Status and Site Suitability information in the table below is intended as a guideline
for identifying suitable locations for plant species based on additional site characteristics, such as soils
and hydrology.
Scientific Name
Common Name
Wetland
Indicator Site
Status Suitability
Fraxinus latifolia
Oregon ash
FACW
BA, TW
Pinus ponderosa
Ponderosa pine
FACU-
BA, TN
Popul us trichocarpa
black cottonwood
FAC
BA, TN
Pseudotsuga menziesii
var. menziesii
Douglas -fir
NOL
TN
Quercus kelloggii
California black oak
NOL
TN
Quercus garryana var.
garryana
Oregon white oak
NOL
TN
Salix sitchensis
Sitka willow
FACW
WE, BA
Salix scouleriana
Scouler's willow
FAC
BA
Salix piperi
Piper's willow
FACW
WE, BA
Salix lucida ssp. lasiandra
Pacific willow
FACW+
WE, BA
Shrubs
Wetland
Indicator
Site
Scientific Name
Common Name
Status
Suitability
Amelanchier alnifolia
serviceberry
FACU
TN
var. semiintegrifolia
Exhibit F to Ordinance No. 20351 Page 11
Berberis aquifolium
tall Oregon -grape
NOL
TN
Corylus cornuta
western hazelnut
NI
TN
Crataegus suksdorf i
Suksdorfs hawthorn
FAC
BA, TN
Holodiscus discolor
ocean spray
NOL
TN
Lonicera hispidula
hairy honeysuckle
NOL
TN
Oemleria cerasiformis
Indian plum
NOL
TN
Physocarpus capitatus
Pacific ninebark
FAC+
BA
Pyrus fusca
western crab-apple
FAC+
TN
Rhamnus purshiana
cascara
NI
TN
Rosa nutkana
Nootka rose
NI
TN
Rosa pisocarpa
clustered wild rose
FACU
TN
Spiraea douglasii var. douglaii
Douglas' spiraea
FACW
WE, BA, TW
Symphoricarpos albus
common snowberry
FACU
TN
var. laevigatus
Viburnum ellipticum
Oregon viburnum
NOL
TN
Herbaceaous Plants
Wetland
Indicator
Site
Scientific Name
Common Name
Status
Suitability
Achillea millefolium
common yarrow
FACU
TN
Alisma plantago-aquatica
broad -leaf water -plantain
OBL
SW, WE
var. americana
Allium amplectens
slimleaf onion
NOL
TN
Aster hallii
Hall's aster
FAC
TN, TW
Bidens cernuua
nodding beggar's -tick
FACW+
WE, TW
Bidens frondosa
leafy beggar's -tick
FACW+
WE, TW
Boisduvalia densiflora
dense spike -primrose
FACW-
WE
Brodiaea hyacinthina
hyacinth brodiaea
FACU
TN
Brodiaea coronaria
harvest brodiaea
NOL
TN
Callitriche heterophylla
water-starwort
OBL
SW, WE
Camassia leichtlinii ssp.
Suksdorfii
tall camas
FACW-
TW
Camassia quamash
ssp. maximacommon
camas
FACW
TW
Cardamine pendul flora
Willamette Valley bittercress OBL
SW, WE, TW
Cardamine nutallii
slender toothwort
NOL
UB
var. nutall i i
Claytonia sibirica
candyflower
FACW
UB
Delphinium trolliifolium
Columbia larkspur
NOL
TN
Downingia elegans
common downingia
OBL
SW, WE
Epilobium paniculatum
autumn willow -herb
NOL
TN
Eriophyllum lanatum
woolly sunflower
NOL
TN
Eryngium petiolatum
Oregon coyote -thistle
OBL
SW, WE
Geum macrophyllum
large -leaved avens
FACW+
WE, BA
Exhibit F to Ordinance No. 20351 Page 12
Grindelia integrifolia
Willamette valley gumweed
FACW
WE, BA
var. integrifol is
Heracleum lanatum
cow -parsnip
FAC
BA, TN
Hydrocotyle ranunculoides
floating marsh-pennywort
OBL
SW
Lasthenia glaberrima
smooth lasthenia
OBL
SW
Lotus formosissimus
seaside lotus
FACW+
WE
Lotus pinnatus
bog lotus
FACW
SW, WE
Lotus purshianus
spanish-clover
NOL
TN
Ludwigia palustris
var. pacifica
water -purslane
OBL
S W, WE
Lupinus polyphyllus
bigleaf lupine
FAC+
BA, TN
Marah oreganus
Oregon bigroot
NOL
TN
Microseris laciniata
cut -leaved microseris
NOL
TN
Montia l inearis
narrow -leaved montia
NOL
TN
Myosotis laxa
small -flowered forget-me-not OBL
WE
Nuphar polysepalum
pond lily
OBL
SW
Oenanthe sarmentosa
water parsely
OBL
SW, WE
Osmorhiza chilensis
sweet -Cicely
NOL
TN
Perideridia gairdneri
Gairdner's yampah
FACU
TN
Plagiobothrys fguratus
fragrant popcorn -flower
FACW
SW, TW
Polygonum hydropiperoides
waterpepper
OBL
SW, WE, TW
Polystichum munitum
common sword fern
NOL
BA, TN
Potentilla gracilis var. gracilis
slender cinquefoil
FAC
TN
Prunella vulgaris var. lanceolata self -heal
FACU+
TN
Ranunculus uncinatus
disappointing buttercup
FAC
BA
Ranunculus orthorhynchus
straight -beak buttercup
FACW-
BA
Ranunculus occidental is
western buttercup
FACW
BA
Ranunculus aquatilis
white water -buttercup
OBL
SW, WE, TW
Rorippia curvisiliqua
western yellowcress
FACW+
WE, TW
Rubus ursinus
Pacific blackberry
NI
TN
Rumex salicifolius
willow -leaved dock
FACW
TW
Sanicula crassicaulis
western sanicle
NOL
TN
var. crassicaul is
Saxftaga oregana
Oregon saxifrage
FACW+
WE, BA
Sidalcea cusickii
Cusick's checkermallow
NOL
WE
Sparganium emersum
simple -stem bur -reed
OBL
SW, WE, TW
Stachys rigida
rigid hedge -nettle
FACW-
BA
Tellima grandiflora
fringecups
NOL
TN
Trillium albidum
sessile trillium
NOL
TN
Typha latifolia
broad-leafcattail
OBL
SW, WE
Veratrum californicum
tailed false -hellebore
OBL
SW, WE
var. caudatum
Veronica americana
American speedwell
OBL
SW, WE
Veronica scutellata
marsh speedwell
OBL
SW, WE
Wyethia angustifol is
narrow -leaf wyethia
FACU
TN
Zigadenus venenosus
death camas
FAC
TW, TN
Exhibit F to Ordinance No. 20351 Page 13
var. venenosus
Grasses, Sedges and Rushes
Wetland
Indicator
Site
Scientific Name
Common Name
Status
Suitability
Agrostis exarata
spike bentgrass
FACW
BA, TW
Alopecurus geniculatus
water foxtail
FACW+
BA, TW
Beckmannia syzigachne
American slough grass
OBL
SW, WE
Carex densa
dense sedge
OBL
SW, WE
Carex deweyana var. leptopoda
Dewey's sedge
FAC+
BA, TW
Carex lanuginosa
woolly sedge
OBL
SW, WE
Carex leporina
hare sedge
FAC
BA, TW
Carex obnupta
slough sedge
OBL
SW, WE
Carex unilateralis
one-sided sedge
FACW
WE, TW
Danthonia californica
California oatgrass
FACU-
TN
Deschampsia cespitosa
tufted hairgrass
FACW
TW
Deschampsia danthonioides
annual hairgrass
FACW-
TW
Deschampsia elongata
slender hairgrass
FACW-
TW
Eleocharis acicularis
needle spikerush
OBL
SW, WE
Eleocharis ovata
ovoid spike-rush
OBL
SW, WE
Eleocharis palustris
creeping spikerush
OBL
SW, WE
Elymus glaucus ssp. glaucus
blue wildrye
FACU
TN
Glyceria occidentalis
western mannagrass
OBL
SW, WE
Hordeum brachyantherum
meadow barley
FACW
WE, TW
Juncus acuminatus
tapered rush
OBL
SW, WE
Juncus articulatus
jointed rush
OBL
SW, WE
Juncus nevadensis
Sierra rush
FACW
WE, TW
Juncus oxymeris
pointed rush
FACW+
WE, TW
Juncus patens
spreading rush
FACW
WE, TW
Juncus tenuis var. tenuis
slender rush
FAC
BA, TW
Koeleria cristata
junegrass
NOL
TN
Panicum occidentale
western witchgrass
FACW
WE, TW
Scirpus validus
softstem bulrush
OBL
SW, WE
Key to Wetland Indicator Status
OBL = Obligate Wetland Plants. Under normal conditions, these plants almost always occur in
wetlands (estimated probability of wetland occurrence 99%).
FACW = Facultative Wetland Plants. Under normal conditions these plants are usually found in
wetlands, but also may be found outside wetlands (estimated probability of wetland occurrence
67-99%)
Exhibit F to Ordinance No. 20351 Page 14
FAC = Facultative Plants. Under normal conditions, these plants are found equally in wetlands and
non -wetlands (estimated probability of wetland occurrence 33-66%).
FACU = Facultative Upland Plants. Under normal conditions, these plants are most likely to be found
in non -wetlands (estimated probability of wetland occurrence 1-33%).
UPI = Obligate Upland Plants. These plants are almost always found in non -wetlands, and are
expected to be found in wetlands less than 1 % of the time.
NOL = Not on U.S.F.W.S. wetland plant list.
Key to Site Suitability
SW = Shallow water
WE = Water's edge
BA Bank
TW = Top of Bank, wetland (e.g., where prairie wetlands exist adjacent to a stream or channel)
TN_ Top of Bank, non -wetland
Wetland indicator status information is taken from:
"National List of Plant Species That Occur In Wetlands: Northwest (Region 9)," U.S. Fish and
Wildlife Service, May 1988; 1993 supplement.
Exhibit F to Ordinance No. 20351 Page 15
Part 4
NON-NATIVE, INVASIVE PLANT SPECIES KNOWN OR LIKELY TO OCCUR WITHIN THE
EUGENE URBAN GROWTH BOUNDARY
The plant species included in this list are species that have been deliberately or accidentally imported
or introduced from other areas by humans or human activities. In addition, these species escape from
cultivated settings and spread aggressively into natural areas, and are capable of displacing large areas
of native vegetation. These non-native, invasive plant species are distinguished from those native
species that grow and propagate themselves in the Eugene area through natural processes, are adapted
to the weather, soils and hydrology of the area, and have evolved in the area or been introduced to the
area by natural causes.
This list applies to all habitat types within the Eugene Urban Growth Boundary. To meet Eugene Code
requirements for removal of non-native, invasive plants, you must remove the specific species,
subspecies or variety listed.
Scientific Common
Name Name
Notes
Reference
Acer
Norway maple Invasive tree spreading into forested natural areas
1
platanoides
around town including Skinner's Butte.
Aesculus
horsechestnut Populations have been found in south end of
1
hippocastanum
Hendricks Park and this species is known to be
problematic in other cities.
Ailanthus
tree -of -heaven Invasive tree that is problematic in City parks, alleys,
1,3
altissima
and undeveloped property. This species is capable of
becoming established through cracks in concrete.
Alliaria
garlic mustard One of the most invasive forest under story plants in
19 4
petiolata
the east and Midwest, starting to establish in the
Seattle area. Documented as present in Portland and
Eugene
Anchusa azurea
anchusa; Exploding in large patches roadside and in woods in
1, 3
common western Benton County. Also known recently from
bugloss Lane and Clackamas counties.
Arum italicum
Arum While it appears to be moved primarily by humans, it
1
occasionally is found away from human activity areas.
Once established, it is extremely difficult to remove.
Betula
European birch This species is spreading rapidly along waterways and
5
pendula/pubesc
is now established along the entirety of Amazon
Creek from near its headwaters to Fern Ridge
Exhibit F to Ordinance No. 20351 Page 16
ens
Reservoir.
Brachypodium false-brome
Highly invasive grass rapidly spreading through
l , 3, 4
sylvaticum
forests and along rivers in our area in numerous
places including Alton Baker Park. It has the potential
to permanently alter the forest under story, as it out -
competes most other species and no control is known.
Buddleia fountain
Both butterfly bushes displace native willows which
1, 4
alternifolia, butterfly bush
are essential host plants for native butterflies.
Buddleia davidii
Clematis vitalba traveler's joy
Invasive climber comparable to English ivy is a
1, 3, 4
problem in areas of Portland and Seattle. Currently
appearing in several areas along the Willamette River
with large populations established on Skinner Butte.
Cotoneaster cotoneaster
Occurring in native prairies and woodland edges.
1
ftanchettii
(Cotoneaster franchetti, C. horizontalis, C. parneyi,
etc. Best to avoid all cotoneasters.)
Cotoneaster cotoneaster
Occurring in native prairies and woodland edges.
1
horizontalis
(Cotoneaster franchetti, C. horizontalis, C. parneyi,
etc. Best to avoid all cotoneasters.)
Crataegus English
This species is well established and spreading rapidly
1, 3, 4
monogyna hawthorn
into woodlands and prairies throughout town. It
interbreeds with the native hawthorn creating hybrids
that are difficult to accurately identify.
Cynoglossum common
This common garden species has escaped and appears
2, 3
officinale houndstongue
regularly in several City parks, along waterways and
in unimproved alleys.
Cytisus French broom
This species is a serious problem in CA and OR south
1, 2, 3, 4
monspessulana
coast and is now appearing in Eugene
Cytisus Scot's broom
Dense populations established along the Willamette,
15 2, 3, 4
scoparius
in the south hills, throughout the West Eugene
Wetlands, along roadways and railways and in several
city parks. Avoid use of all brooms.
Daphne spurge laurel
Spread by birds into forested areas throughout town.
1, 3
laureola
Digitalis foxglove
This common and attractive garden wild flower
1, 3
purpurea
escapes easily and forms dense populations. It is
becoming well established in some areas along the
Willamette River.
Exhibit F to Ordinance No. 20351 Page 17
Genista broom This species is a serious problem in CA and along the
monspessulana south OR coast. Now beginning to appear in Eugene.
Geranium shining Beginning to dominate forest understories in south 1
lucidum crane's -bill Eugene.
Geranium herb robert Dominates forest understories in several areas in 1, 35 4
robertianum Eugene including Hendrick's park. This species is
spreading rapidly throughout town.
Glecoma ground ivy; Can become a dominant plant in moist, shady riparian
e eracea creeping areas.
Charlie
Hedera helix English ivy Spreads vegetatively in forested and open areas. Seeds 1, 2, 3, 4
spread mostly by exotic birds including starlings. This
species is an extensive and widespread problem
throughout Eugene, especially in forested areas and
along the Willamette River.
Hypericum St. John's wort This species invades meadows, trailsides, roadsides, 1, 2, 3, 4
perforatum and other areas throughout town.
Ilex aquifolium English holly Spread by birds and appears regularly in forest 1, 3
understories throughout town.
Iris yellow flag iris Forms monocultures in wetlands. This species has 1, 3
pseudoacorus established in Bertelsen Slough, Amazon Creek, Flat
Creek, Spring Creek and along the Willamette River.
Juniperus eastern Birds eat berries and spread seeds. 1
virginiana redcedar
Lamiastrum Yellow Primarily spread by humans. Very aggressive, 1
galeobdolan archangel primarily moving out from landscaped areas. Has
escaped in Springfield, Corvallis, and in Seattle,
where a botanist says it "covers hillsides."
Lathyrus sp. latifolius Well -established, primarily along roadsides and 1
sweet, hedgerows, large population on Chamber' s connector.
perennial or Listed in "Weeds of the West"
everlasting pea
Leucanthemum oxeye daisy This species is common in commercial "wildflower 1, 3, 4
vulgare mixes". It has become widely established in meadows
in West Eugene, Amazon Park, and along roadsides
and mowed waterways. Formerly Chrysanthemum
leucanthemum.
Exhibit F to Ordinance No. 20351 Page 18
Ligustrum common privet Birds eat fruits and spread plants into woods and
vulgare prairies.
Linaria vulgaris yellow Roadside weed expanding into prairies.
toadflax
Lotus birdsfoot
corniculatus trefoil
Lunaria annua
honesty;
money plant
Lysimachia
moneywort
nummularia
Lythrum
purple
salicaria
loosestrife
Melissa lemon balm
officinalis
Mentha Mentha
pulegium pulegium
Myriophyllum Eurasian
spicatum watermilfoil
Myosotis common
scorrpioides forget-me-not
Myriophyllum parrot's
ssp. feather, et. al.
Phal aris Harding grass
aq uati ca
Phalaris reed
arundinacea canarygrass
Sold in pasture mixes. This species has invaded
wetland areas throughout town including most
drainage channels.
Invasive in forest understories.
Regular dominant of riparian wetlands in our areas,
both in sun and shade.
This species forms monocultures in wetlands and is a
species of national concern. Although not yet
widespread, populations have been found in Amazon
Creek and Willamette River and appear to be
expanding.
Widespread weed in native prairies and openings in
woods.
Forms large monocultures in emergent wetlands in
West Eugene, displacing native wetland plants.
1
1,2,3,4
1, 3
1
1
1, 2, 39 4
1
11
Includes water-milfoils. Myriophyllum aquaticum L 2 3 4
(M. brasiliense; parrot's feather) and M. spicatum '
(Eurasian milfoil) are common aquatic species in
waterways and ponds throughout Eugene.
Can dominate forest understories, especially openings 1
and on edges.
This genus of floating aquatic plants includes the 1
water milfoils. Myriophyllum aquaticum (parrot's
feather) is the major offender, and Myriophyllum
spicatum (Eurasian milfoild) is also very damaging.
This wetland species is found in slightly drier 1, 3, 4
conditions than P. arundinacea. While populations are
not yet as widespread as P. arundinacea, populations
are rapidly expanding.
This species forms dense monocultures and is one of 1, 3, 4
the most widespread species in all types of wetlands
Exhibit F to Ordinance No. 20351 Page 19
throughout Eugene. It permanently and dramatically
effects ecosystems where it has become established.
This species is still sold commercially.
Polygonum Japanese This species forms riparian monocultures. This 1, 2, 3
cuspidatum (and knotweed species is not yet common in Eugene but populations
related species are becoming more common and larger. It is already a
and hybrids) significant problem in the Portland and Seattle areas.
Avoid all the large knotweeds.
Populus alba white poplar This species spreads rapidly via suckers and is 3
difficult to remove once established. It also quickly
becomes a hazard tree as the brittle branches are
prone to breakage. This species is found is several
City parks including Alton Baker Park.
Prunus avium sweet cherry This species is spread by birds into forested areas and 1, 3, 4
is a quite common understory invader in forested
areas throughout Eugene.
Prunus thundercloud Grafted species and rootstocks that sucker and flower, 1
cerasifera plum produce fruit which is spread easily by birds. This
species is appearing in prairie areas in West Eugene
and woodland edges throughout town.
Prunus plum Not as invasive as P. avium. 1
domestica
Prunus English laurel This common hedge evergreen is spread by birds and 1,3
laurocerasus appears regularly in forested understories, especially
at Skinner Butte, Morse Ranch, and Hendricks Park.
Prunus Portugal laurel Similar to P. laurocrasus, this species appears 1
lusitanica regularly in forest understories.
Prunus mahaleb mahaleb cherry Birds spread seeds of this species, which is common 3
in the understories of forested areas and woodland
edges throughout town.
Pueraria kudzu While populations have not been found in Eugene, 1, 2, 4
montana var. two occurrences have been noted in the Willamette
lobata Valley. This species has devastated plant communities
in southern and eastern states.
Pyracantha spp. fire thorn Birds eat fruits and spread plants into prairies. P. 1
angustifolia, P. coccinea, et al.
Pyrus communis pear This species appears occasionally in prairie areas and 5
shrub/scrub communities throughout town.
Exhibit F to Ordinance No. 20351 Page 20
Ranunculus
lesser
Highly invasive in Hendricks Park and Mt. Pisgah
1
ficaria
celandine
Arboretum. Once established populations are
extremely difficult to control.
Ranunculus
creeping
This species is allelopathic. It forms large
1
repens
buttercup
monocultures, especially in moist areas. It is common
in many of our parks including Tugman Park.
Robinia
black locust
Widely escaped east of Cascades, beginning to
113
pseudoacacia
naturalize on West Side (Portland area, Benton
County, Lane County.) This species can form
woodland monocultures.
Rorippa
watercress
Chokes out small waterways on the valley floor.
l , 3
nasturtium-
aquaticum
Rosa eglanteria
sweet -briar
This species easily invades prairie areas and is
1, 3
common throughout town especially in West Eugene.
Rosa multijlora
multiflowered
This species, similar to R. eglantaria, is a common
1
rose
problem in west Eugene wetlands and Fern Ridge
Wildlife Area.
Rubus
Himalaya or
One of the most widespread exotic species in the
1, 3, 4
armeniacus
Armenian
Pacific Northwest. Populations are well established in
(discolor)
blackberry
all plant communities throughout Eugene.
Rubus
evergreen
Not as invasive as R. armeniacus, but still forms
l , 3
laciniatus
blackberry
dense clumps.
Sorbus
European
Appearing in west Eugene wetlands and uplands.
193
aucuparia
mountain -ash
Birds spread seed.
Ulex europeaus
gorse
A massive problem on the OR coast, now beginning
1
to appear in the Willamette Valley. Extremely
difficult to remove.
Vinca major
periwinkle;
Mostly near old homesites -- they appear to spread
1
vinca
vegetatively only. Completely dominates understories.
Vinca minor
periwinkle;
Mostly near old homesites -- they appear to spread
1, 3
vinca
vegetatively only. Completely dominates understories.
Exhibit F to Ordinance No. 20351 Page 21
References:
1. Invasive Gardening and Landscaping Plants of the Southern Willamette Valley, Native Plant
Society of Oregon, Emerald Chapter, updated April 2002.
2. Oregon's Quarantine Against Noxious Weeds, Oregon Department of Agriculture, from
http://www.oda.state.or.us/Plant/Weed_ control/NoxWeedQuar.pdf accessed on 04/10/02.
3. Draft of Exotic Pest Plants of Greatest Ecological Concern in Oregon and Washington; May 23
1997, The Pacific Northwest Exotic Pest Council, from http://www.wnps.org/eppclet.html
accessed on 04/10/02,
4. NW Oregon most harmful invasive plant species list: based on information provided at & before
the October 10, 2001 meeting in Salem BLM, Bureau of Land Management, Salem District,
2001.
5. City of Eugene staff recommendation based on resources required to remove species from parks,
open spaces and waterways.
Exhibit F to Ordinance No. 20351 Page 22